INSP - Final | 7/21/1995 | 7/20/1995 | 7/20/1995 | | PASS |
Jim Soden
|
|
|
10 MIN/FINAL
|
INSP - Sewer line | 7/21/1995 | 7/20/1995 | 7/20/1995 | | PASS |
Jim Soden
|
|
|
15 MIN
|
INSP - Sewer line | 7/19/1995 | 7/19/1995 | 7/19/1995 | P | CONF |
Stan Johnson
|
|
|
40 min
|
INSP - Conference | 7/18/1995 | 7/18/1995 | 7/19/1995 | | PASS |
Stan Johnson
|
|
|
07/19/95 352 - sewer line conference required to stay atleast 25' from w abs or pvc pipe aproved for inside house the rest of line can be 3034 pi
|
(F) Issue permit | | | 7/17/1995 | | PAID |
|
|
|
|
Application received | | | 7/17/1995 | | |
|
|
|
|