INSP - Final | 9/18/1995 | 9/19/1995 | 9/19/1995 | A | PASS |
Jim Soden
|
|
|
09/18/95 347 - FINAL O/K FIXTURE COUNT W/C 2 BASIN 4 TUB 2 SHR 1 SINK 1 WASHER 1 W/H 1 W/S 1
|
INSP - Framing/ Rough-in | 8/4/1995 | 8/4/1995 | 8/7/1995 | P | PASS |
Gerry Varner
|
|
|
08/04/95 323 - READY AT 2:00 THIS IS IN HOBBLE CREEK rough-in ok
|
INSP - Water lines | 7/19/1995 | 7/19/1995 | 7/19/1995 | A | PASS |
Stan Johnson
|
|
|
10min
|
INSP - Sewer line | 7/19/1995 | 7/19/1995 | 7/19/1995 | | PASS |
|
|
|
7min
|
INSP - Sewer line | 7/19/1995 | 7/19/1995 | 7/19/1995 | A | PASS |
Stan Johnson
|
|
|
10 min
|
INSP - Water lines | 7/19/1995 | 7/19/1995 | 7/19/1995 | | PASS |
|
|
|
8MIN
|
Application received | | | 7/19/1995 | | |
|
|
|
|
(F) Issue permit | | | 7/19/1995 | | |
|
|
|
|