INSP - Final | 12/7/1998 | 12/7/1998 | 12/7/1998 | A | PASS |
Bill VanDegrift
|
|
|
|
PLM - Partial final | 12/15/1995 | 12/15/1995 | 12/15/1995 | | PART |
Bill VanDegrift
|
|
|
/ / 330 - bldg 22 need grate on dlb containment monitor pit
|
INSP - Miscellaneous | 8/3/1995 | 8/3/1995 | 11/8/1995 | | NR |
Bill VanDegrift
|
|
|
IW PIPING RUNGS LONG GRID 3.5 BLDG 22 cleaning up computer, left this in to show area of next inspection
|
(F) Reprint permit | | | 9/12/1995 | | I |
|
|
|
|
(F) Issue permit | | | 9/12/1995 | | |
|
|
|
|
(F) Issue permit | | | 9/12/1995 | | |
|
|
|
|
(F) Reprint permit | | | 9/12/1995 | | I |
|
|
|
|
(F) Reprint permit | | | 9/6/1995 | | |
|
|
|
|
INSP - Underground | 8/4/1995 | 8/4/1995 | 8/4/1995 | | PART |
Bill VanDegrift
|
|
|
/ / 330 - partial g/w ok I.W.
|
INSP - Framing/ Rough-in | 8/1/1995 | 8/2/1995 | 8/2/1995 | P | PASS |
Bill VanDegrift
|
|
|
08/02/95 330 - STORM DRAIN AT GRID 1 AND SANITARY AT GRID 3.8 partial groundwork ok
|
INSP - Ground work | 7/31/1995 | 7/31/1995 | 8/1/1995 | | NR |
Bill VanDegrift
|
|
|
07/31/95 330 - BLDG 22, GRID LINE 1 - NORTHSIDE STORMWORK AND U/G defective material has been replaced but not tested
|
Application received | | | 7/28/1995 | | |
|
|
|
|