Issue PAID IN FULL permit | | | 6/5/1996 | | |
|
|
|
|
INSP - Final | 4/24/1996 | 4/24/1996 | 4/24/1996 | P | PASS |
Jim Soden
|
|
|
04/24/96 347 - KEY ON TOP OF BACK DOOR. LOCK AND PUT KEY BACK WHEN DONE. ALLREADY FINALED
|
INSP - Final | 4/22/1996 | 4/23/1996 | 4/23/1996 | A | PASS |
Jim Soden
|
|
|
04/22/96 347 - w/c 2 basin 2 tub 2 sink 1 w/b 1 w/h 1 w/s 1 final o/k 4/
|
Issue FEE-DUE permit | | | 4/22/1996 | | FEE |
|
|
|
|
INSP - Conference | 9/18/1995 | 9/18/1995 | 9/18/1995 | | PASS |
Jim Soden
|
|
|
/ / 347 -
|
INSP - Plumbing Rough-in | 9/15/1995 | 9/18/1995 | 9/18/1995 | A | CANC |
Jim Soden
|
|
|
09/18/95 347 - CONFERENCE
|
INSP - Conference | 9/18/1995 | 9/18/1995 | 9/18/1995 | | PASS |
Jim Soden
|
|
|
/ / 347 -
|
INSP - Plumbing Rough-in | 9/14/1995 | 9/15/1995 | 9/15/1995 | A | PASS |
Dave Lightfoot
|
|
|
|
INSP - Plumbing Rough-in | 9/14/1995 | 9/15/1995 | 9/15/1995 | A | PASS |
Jim Soden
|
|
|
09/15/95 347 - WATER PRESSURE TEST FAILED AGAIN THIRD TIME 40.00 REINSP THE TWO TODAY O/K! THIS IS THE THIRD TIME OUT TODAY, HE SAYS HIS GAUGE LEAKS WHAT A REVELATI
|
INSP - Plumbing Rough-in | 9/14/1995 | 9/15/1995 | 9/15/1995 | A | FAIL |
Jim Soden
|
|
|
09/14/95 347 - REINSPECTION CORRECTION NOT MADE REINSPECTION FEE 20:00 FIXTURE COUNT W/C 2 BASIN 2 TUB 2 SINK 1 WASHER 1 W/H 1 WATER SOFTENER 1
|
INSP - Plumbing Rough-in | 9/14/1995 | 9/14/1995 | 9/14/1995 | P | FAIL |
Jim Soden
|
|
|
09/14/95 347 - CORRECTION NOTICE WATER PRESSUREN TEST GAUGE DOWN TO "o" FIXTURE COUNT W/C 2 BASIN 2 TUB 2 SINK 1 WASHER 1 W/H 1 WATER SOFTENER 1
|
INSP - Ground work | 8/16/1995 | 8/16/1995 | 8/16/1995 | | PASS |
|
|
|
FAIL
|
Application received | | | 8/16/1995 | | |
|
|
|
|
INSP - Ground work | 8/15/1995 | 8/15/1995 | 8/15/1995 | | FAIL |
|
|
|
PASS
|