INSP - Final | 12/11/1995 | 12/11/1995 | 12/11/1995 | P | PASS |
Bill VanDegrift
|
|
|
12/11/95 330 - THIS IS READY MON PM final ok 3-wc,4-lav,2-tub,2-sh,2-si,1-wb,1-wh
|
Receive PAYMENT IN FULL | | | 10/5/1995 | | |
|
|
|
|
INSP - Final | 9/20/1995 | 9/20/1995 | 9/20/1995 | | PASS |
Bill VanDegrift
|
|
|
/ / 330 - r/i ok
|
INSP - Plumbing Rough-in | 9/19/1995 | 9/19/1995 | 9/19/1995 | P | FAIL |
Bill VanDegrift
|
|
|
09/19/95 330 - waste test failed, water test failed
|
INSP - Plumbing Rough-in | 9/18/1995 | 9/18/1995 | 9/18/1995 | P | NR |
Bill VanDegrift
|
|
|
09/18/95 330 - 4 w/c 5 basin 3 tub 1 shower 2 sinks 1 w/b 1 w/h not ready, no test, correct fixture counrt- - - - 4-wc, 6-lav,3-tub,2-sh,2-si,1-wb,1-wh, of these 1-
|
(F) Issue permit | | | 9/13/1995 | | |
|
|
|
|
INSP - Ground work | 8/18/1995 | 8/18/1995 | 8/18/1995 | P | PASS |
Bill VanDegrift
|
|
|
08/18/95 330 - g/w ok
|
INSP - Ground work | 8/17/1995 | 8/17/1995 | 8/17/1995 | P | FAIL |
Bill VanDegrift
|
|
|
08/17/95 330 - correction: no building pemit early start only no inspec
|
Application received | | | 8/17/1995 | | |
|
|
|
|