INSP - Final | 11/8/1995 | 11/9/1995 | 11/9/1995 | A | PASS |
Gerry Varner
|
|
|
11/08/95 23 - final ok
|
INSP - Final | 11/8/1995 | 11/8/1995 | 11/8/1995 | P | FAIL |
Gerry Varner
|
|
|
11/08/95 323 - corrections needed--replace both flex connectors--caulk t spout,valve cover,lavatory,toilet in upper bath.
|
Issue PAID IN FULL permit | | | 11/7/1995 | | I |
|
|
|
|
INSP - Plumbing Rough-in | 9/22/1995 | 9/22/1995 | 9/25/1995 | | PASS |
|
|
|
09/22/95 323 3 W/C 3 BASIN 3 TUBS 1 SINK 1 W/H 1 W/N ROUGH IN OK
|
INSP - Ground work | 8/23/1995 | 8/23/1995 | 8/23/1995 | P | PASS |
Gerry Varner
|
|
|
08/23/95 323 - GROUND WORK OK
|
Application received | | | 8/23/1995 | | |
|
|
|
|