INSP - Final | 12/20/1995 | 12/20/1995 | 12/20/1995 | | PASS |
Jim Soden
|
|
|
/ / 347 - W/C 3 BASIN 5 TUB 2 SHR 1 SINK 1 W/B 1 W/H 1 W/S 1 L/T 1
|
INSP - Final | 12/19/1995 | 12/19/1995 | 12/19/1995 | P | FAIL |
Jim Soden
|
|
|
|
INSP - Plumbing Rough-in | 10/27/1995 | 10/30/1995 | 10/30/1995 | A | PASS |
Jim Soden
|
|
|
10/27/95 347 - READY AT 11:00///16 FIXTURES W/C 4 BASIN 6 TUB 3 SHR 1 SINK 3 W/H 1 W/S 1
|
INSP - Plumbing Rough-in | 10/26/1995 | 10/26/1995 | 10/26/1995 | P | NR |
Jim Soden
|
|
|
10/26/95 347 - 3 W/C 5 BASIN 4 TUB 2 SINK 1 W/B 1 W/H 1 WATERSOFTNER
|
Issue PAID IN FULL permit | | | 10/26/1995 | | |
|
|
|
|
INSP - Sewer and Water lines | 9/5/1995 | 9/5/1995 | 9/5/1995 | P | PASS |
Jim Soden
|
|
|
09/05/95 347 - SEWER & WATER OK GROUND WORK OK
|
Application received | | | 9/5/1995 | | |
|
|
|
|
(F) Issue permit | | | 9/5/1995 | | |
|
|
|
|