Permit Information
Permit NumberPLM95-01197
StatusFinaled
Name DYNAMIC SYSTEMS INC
Site Address 8000 S FEDERAL WAY
Project Name 
Customer Number 
ePlanReview 
Description
10-4-95 FAB 1 EXPANSION INDUSTRIAL WASTE AND MONITORED INDUSTRIAL WASTE SYSTEMS. ESTIMATED AMOUNT INCLUDES SYSTEM EQUIPMENT AND PIPING TO THE UTILITY BRIDGE. STRUCTURAL #1055136. #1,185,548.00/DF
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Final12/8/199812/8/199812/8/1998APASS
DetailsBill VanDegrift
CHANGE STATUS TO (I)  8/29/1996
INSP - Final1/23/19961/24/19961/24/1996PNR
DetailsBill VanDegrift
01/24/96 330 -
INSP - Plumbing Rough-in1/22/19961/22/19961/22/1996 PART
DetailsBill VanDegrift
/ / 330 - partial r/i ok miw area b north drains changed from iw on or
INSP - Plumbing Rough-in1/16/19961/16/19961/16/1996 PART
DetailsBill VanDegrift
/ / 330 - verify deletion of ptraps on iw system in area b, and test, previous corrections, provide all information on miw and iwtermination i pit, remove iw vent from ohf vent
INSP - Framing/ Rough-in12/18/199512/18/199512/18/1995 FAIL
DetailsBill VanDegrift
/ / 330 - test failed on the miw area b will recall also dsi needs to provide updated plans to allow inspection, there seems be a difference between the installation and plans, plans dont show any
INSP - Final12/15/199512/18/199512/18/1995AFAIL
DetailsBill VanDegrift
12/18/95 330 - provide all plans, specs, drawings, etc. to reflect devea plans , spec and materials
INSP - Final12/6/199512/7/199512/7/1995APART
DetailsBill VanDegrift
12/06/95 330 - FAB 1 ACID WASTE LINE partial r/i done yesterday
INSP - Framing/ Rough-in12/6/199512/6/199512/6/1995 PART
DetailsBill VanDegrift
/ / 330 - PARTIAL R/I MIW AREA A REGRADE HANGERS EVERY 4' TEST TO UPPERMOST FLOOR LEVEL ONLY DUE TO CONFLECT BETWEEN FIXTURES AND FINISHES, LETTER REQUIRED FROM MTI ACCEPTING THIS TEST PR
Issue FEE-DUE permit  12/6/1995 FEE
FAB 1 WASTE LINE
INSP - Framing/ Rough-in11/6/199511/6/199511/6/1995 PART
DetailsBill VanDegrift
/ / 330 - IW IN SUB-FAB, BRANCHES, AND MAIN. 10' HEAD TEST OK. VENTS A NO EQUIPMENT TIE-INS. THIS INCLUDES THE 4" EXTENTION ALONG WEST WALL.
INSP - Framing/ Rough-in11/6/199511/6/199511/6/1995 PART
DetailsBill VanDegrift
/ / 330 - IW SUB FAB, MAINS AND BRANCHES, 10' HEAD, VENTS ARE THRU ROO THE ADDED 4" BRANCH ALONG WEST WALL.
INSP - Plumbing Rough-in11/2/199511/3/199511/3/1995ANR
DetailsBill VanDegrift
11/03/95 330 - PARTIAL R/I FAB 1
INSP - Final11/2/199511/2/199511/2/1995PCANC
DetailsBill VanDegrift
11/02/95 330 - FAB 1
INSP - Final10/24/199510/24/199510/24/1995PNR
DetailsBill VanDegrift
10/24/95 330 - INDUSTRIAL WAST FAB 1 CONTACT MIKE KELLY AT ###-####
INSP - Water lines10/12/199510/13/199510/13/1995APASS
DetailsBill VanDegrift
10/12/95 330 - INDUSTRIAL MAIN WASTE FAB 1 I.W. IN TRENCH ALONG NORTH SIDE ONLY TEST OK, BIPASSES IN CHANGE ORDER D JUNE 8 95
Issue PAID IN FULL permit  10/9/1995
Application received  10/4/1995