INSP - Final | 5/28/1996 | 5/28/1996 | 5/28/1996 | | PASS |
Jim Soden
|
|
|
/ / 347 - W/C 3 BASIN 5 TUB 3 SHR 1 SINK 1 W/B 1 W/H 1 L/T 1 FINAL O/K 5/28/6 347
|
INSP - Final | 5/28/1996 | 5/28/1996 | 5/28/1996 | P | CANC |
Dave Lightfoot
|
|
|
05/28/96 337 -
|
INSP - Plumbing Rough-in | 12/20/1995 | 12/20/1995 | 12/20/1995 | P | CANC |
Jim Soden
|
|
|
12/20/95 347 -
|
Issue PAID IN FULL permit | | | 12/14/1995 | | |
|
|
|
|
INSP - Ground Work/Sewer/Water | 11/7/1995 | 11/8/1995 | 11/9/1995 | A | CANC |
Jim Soden
|
|
|
11/08/95 347 -
|
INSP - Ground Work/Sewer/Water | 11/8/1995 | 11/8/1995 | 11/8/1995 | | PASS |
Stan Johnson
|
|
|
/ / 352 - i tagged the job as no inspection but i inspected it and dre and water is ok also ground work is ok but i did not tag green
|
Issue FEE-DUE permit | | | 11/7/1995 | | FEE |
|
|
|
|
Application received | | | 11/7/1995 | | |
|
|
|
|