INSP - Final | 1/8/1996 | 1/8/1996 | 1/8/1996 | P | PASS |
Stan Johnson
|
|
|
01/08/96 352 -
|
INSP - Framing/ Rough-in | 11/13/1995 | 11/13/1995 | 11/13/1995 | | PASS |
Jim Soden
|
|
|
/ / 347 - W/C 3 BASIN 5 TUB 2 SHR 1 SINK 1 W/B 1 W/H 1 W/S 1 15 FIXTURES
|
Application received | | | 11/13/1995 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 11/13/1995 | | |
|
|
|
|