INSP - Final | 3/5/1996 | 3/6/1996 | 3/6/1996 | A | PASS |
Gary Ziegler
|
|
|
03/06/96 334 -
|
Issue PAID IN FULL permit | | | 12/21/1995 | | |
|
|
|
|
INSP - Framing/ Rough-in | 12/15/1995 | 12/15/1995 | 12/15/1995 | | PASS |
Bill VanDegrift
|
|
|
/ / 330 - r/i ok
|
INSP - Plumbing Rough-in | 12/15/1995 | 12/15/1995 | 12/15/1995 | P | PASS |
Bill VanDegrift
|
|
|
12/15/95 330 - REINSPECTION done
|
INSP - Plumbing Rough-in | 12/14/1995 | 12/14/1995 | 12/14/1995 | P | FAIL |
Bill VanDegrift
|
|
|
12/14/95 330 - REINSPECTION BASIS 9 tests failed
|
INSP - Plumbing Rough-in | 12/12/1995 | 12/13/1995 | 12/13/1995 | A | FAIL |
Gerry Varner
|
|
|
12/12/95 323 - 9 FIXTURES IN ALL BASIC water and waste test failed
|
Application received | | | 12/12/1995 | | |
|
|
|
|
Issue FEE-DUE permit | | | 12/12/1995 | | FEE |
|
|
|
|