Issue PAID IN FULL permit | | | 3/5/1996 | | |
|
|
|
|
INSP - Final | 2/26/1996 | 2/26/1996 | 2/26/1996 | P | PASS |
Jim Soden
|
|
|
final o/k 2/26 96 347/jws w/c 2 basin 2 tub 1 sink 1 w/b 1 w/h 1
|
INSP - Plumbing Rough-in | 1/18/1996 | 1/18/1996 | 1/18/1996 | P | PASS |
Stan Johnson
|
|
|
01/18/96 352 - 9 FIXTURES IN ALL
|
Application received | | | 1/18/1996 | | |
|
|
|
|
Issue FEE-DUE permit | | | 1/18/1996 | | FEE |
|
|
|
|