Issue PAID IN FULL permit | | | 4/23/1996 | | |
|
|
|
|
INSP - Final | 3/29/1996 | 3/29/1996 | 3/29/1996 | P | PASS |
Jim Soden
|
|
|
03/29/96 347 - W/C 2 BASIN 3 TUB 1 SHR 2 SINK 1 W/B 1 W/H 1 W/S 1 FINAL O/K 3/29/6 347
|
INSP - Plumbing Rough-in | 3/4/1996 | 3/4/1996 | 3/4/1996 | P | PASS |
Stan Johnson
|
|
|
11 FIXTURES
|
Application received | | | 3/4/1996 | | |
|
|
|
|
Issue & PRINT FEE-DUE permit | | | 3/4/1996 | | FEE |
|
|
|
|