INSP - Sewer line | 10/9/1996 | 10/10/1996 | 10/10/1996 | A | PASS |
Bill VanDegrift
|
|
|
10/10/96 330 - did yesterday
|
INSP - Final | 10/9/1996 | 10/9/1996 | 10/9/1996 | | PASS |
Bill VanDegrift
|
|
|
/ / 330 - perm occ ok
|
INSP - Plumbing Rough-in | 10/8/1996 | 10/7/1996 | 10/7/1996 | P | PART |
Bill VanDegrift
|
|
|
containment piping for iw test ok
|
INSP - Plumbing Rough-in | 10/1/1996 | 10/1/1996 | 10/1/1996 | | PART |
Bill VanDegrift
|
|
|
/ / 330 - pumped IW TEST OK, STILL NEED BOTH CONTAINMENT TESTS
|
INSP - Plumbing Rough-in | 9/9/1996 | 9/9/1996 | 9/9/1996 | | PART |
Bill VanDegrift
|
|
|
/ / 330 - retest on 4x6 interior piping after it failed after witness lasttime, ok plus 6" pumped IW inner containment tested ok 9/7/96 witnessed by casey, and barry
|
PLM - Partial final | 8/30/1996 | 9/3/1996 | 9/3/1996 | A | CANC |
Bill VanDegrift
|
|
|
09/03/96 330 - pump waste/ roof top system fab 4 phase 2 Andy called an
|
INSP - Plumbing Rough-in | 9/3/1996 | 9/3/1996 | 9/3/1996 | | PART |
Bill VanDegrift
|
|
|
/ / 330 - pumped OHF from subfab across roof to drop to repump station still need containment test.
|
Issue PAID IN FULL permit | | | 8/26/1996 | | |
|
|
|
|
Issue & PRINT FEE-DUE permit | | | 8/6/1996 | | |
|
|
|
|
Application received | | | 8/6/1996 | | |
|
|
|
|