Case Summary (PLM) | | | 7/3/2013 | | |
|
|
|
|
INSP - Final | 10/17/1996 | 10/17/1996 | 10/18/1996 | P | PASS |
Jim Soden
|
|
|
10/17/96 347 - BANK FINAL OCC. O/K
|
Issue PAID IN FULL permit | | | 10/14/1996 | | |
|
|
|
|
INSP - Plumbing Rough-in | 9/24/1996 | 9/25/1996 | 9/25/1996 | A | PASS |
Lee Rice
|
|
|
09/25/96 309 - REINSPECTION this was hard to find cause it did not have enough info. it was on the floor of the old west one bank building.
|
INSP - Plumbing Rough-in | 9/23/1996 | 9/23/1996 | 9/23/1996 | P | CANC |
Stan Johnson
|
|
|
09/23/96 352 - 7TH FLOOR PLUMBING FIXTURES REPLACEMENT $2,262.00-WESTONE 334
|
Issue FEE-DUE permit | | | 9/23/1996 | | FEE |
|
|
|
|
Application received | | | 9/23/1996 | | |
|
|
|
|