INSP - Final | 8/19/1997 | 8/20/1997 | 8/20/1997 | A | PASS |
Bill VanDegrift
|
|
|
08/20/97 330 - Scheduled by Hello! on 08/19/97 at 17:20:25. This is a re Re-inspection on final overflow is installed, thats the only correctio I'm aware of final ok
|
INSP - Final | 2/12/1997 | 2/13/1997 | 2/13/1997 | P | FAIL |
Bill VanDegrift
|
|
|
02/13/97 330 - no corrections made
|
INSP - Final | 1/22/1997 | 1/23/1997 | 1/23/1997 | A | PART |
Bill VanDegrift
|
|
|
01/23/97 330 - AFTER 11:00 complete waste and overflow temp occ ok, 2nd
|
INSP - Final | 1/13/1997 | 1/13/1997 | 1/14/1997 | P | NR |
Gary Ziegler
|
|
|
01/14/97 334 - late p.m.
|
INSP - Plumbing Rough-in | 11/1/1996 | 11/1/1996 | 11/1/1996 | P | CANC |
Gerry Varner
|
|
|
REINSPECTION GAVE TO BILL
|
INSP - Plumbing Rough-in | 11/1/1996 | 11/1/1996 | 11/1/1996 | | PASS |
Bill VanDegrift
|
|
|
11/01/96 330 - REINSPECTION
|
INSP - Plumbing Rough-in | 10/30/1996 | 10/31/1996 | 10/31/1996 | A | FAIL |
Gerry Varner
|
|
|
10/31/96 323 - corrections needed __ nail plates __ isolaters __ move wa into wall
|
Issue PAID IN FULL permit | | | 10/14/1996 | | |
|
|
|
|
INSP - Plumbing Rough-in | 9/24/1996 | 9/24/1996 | 9/24/1996 | P | PASS |
Gerry Varner
|
|
|
09/24/96 323 - AS EARLY AS POSSIBLE ___ THIS WAS A REQUEST FOR SEWER AND SEWER AND WATER OK
|
Application received | | | 9/24/1996 | | |
|
|
|
|
Issue FEE-DUE permit | | | 9/24/1996 | | |
|
|
|
|