INSP - Final | 5/4/1998 | 5/5/1998 | 5/5/1998 | A | PASS |
Gary Ziegler
|
|
|
ELIZABETH/###-#### - FINAL. REQUESTS 8:30.
|
INSP - Final | 5/5/1998 | 5/5/1998 | 5/5/1998 | | PASS |
Gary Ziegler
|
|
|
05/05/98 334 - ELIZABETH/###-#### - FINAL. REQUESTS 8:30.
|
INSP - Conference | 5/5/1998 | 5/5/1998 | 5/5/1998 | | PASS |
Gary Ziegler
|
|
|
/ / 334 -
|
INSP - Final | 4/30/1998 | 5/1/1998 | 5/1/1998 | A | NH |
Gary Ziegler
|
|
|
05/01/98 334 - call elizabeth she will be home from 8 to 10:45 a.m
|
INSP - Plumbing Rough-in | 1/12/1998 | 1/12/1998 | 1/12/1998 | P | PASS |
Gary Ziegler
|
|
|
01/12/98 334 -
|
INSP - Plumbing Rough-in | 1/7/1998 | 1/8/1998 | 1/8/1998 | A | FAIL |
Gary Ziegler
|
|
|
01/07/98 334 - need to open floor up
|
INSP - Conference | 1/8/1998 | 1/8/1998 | 1/8/1998 | | PASS |
Gary Ziegler
|
|
|
/ / 334 -
|
INSP - Framing/ Rough-in | 1/8/1998 | 1/8/1998 | 1/8/1998 | | NR |
Gary Ziegler
|
|
|
/ / 334 -
|
INSP - Plumbing Rough-in | 1/8/1998 | 1/8/1998 | 1/8/1998 | P | FAIL |
Gary Ziegler
|
|
|
01/08/98 334 - REPLACE LOW HEEL 90 WITH NEW AND CUT 3BY2 WYE BEFORE TOIL SHOWER DRAIN , OUTSIDE REPLACE WITH NEW 4IN SANTEE AND MAKE A JOINTS WIT METAL SHEILDED COUPLINGS GZ
|
Application received | | | 12/18/1997 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 12/18/1997 | | |
|
|
|
|
(F) Reprint permit | | | 12/18/1997 | | |
|
|
|
|