Information based on query as of Wednesday, July 3, 2024.
Permit Information
Permit NumberPLM99-03831
StatusFinaled
Name DE BEST PLUMBING INC
Site Address 1001 E GOWEN RD
Project NameSHOPKO DISTRIBUTION
Customer Number 
ePlanReview 
Description
11/12/99-$126,720.00-Shopko Distribution-hot an dcold domestic water, waste and vents, piping, plumbing fixtures, etc.-initial cert. of value.ms 10/12/00--final cert 167,517.00
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
(F) Reprint permit  10/12/2000 DONE
Telephone call  9/15/2000 DONE
DetailsKim Harrison
Spoke with Kim; will fax final cert. of value ASAP 10/12-final certs didn't look right--called(9-29) kim to check on have not heard back I applied fees..lh
Final3/22/20003/22/20003/22/2000PPASS
DetailsBill VanDegrift
Final ok
FEE REVIEW-NOTES  3/22/2000  
Final3/15/20003/16/20003/16/2000AFAIL
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 03/15/2000 at 15:13:16. Contact: ###-####. Provide revised plans requested 1/12/00 prior to final inspection. 3/17/00 10:38:48 AM
Other1/11/20001/12/20001/12/2000PPART
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 01/11/2000 at 16:59:16. Contact: ###-####. Pump discharge ok, provide revised RD plan and pump discharge re-route.
Other1/3/20001/4/20001/4/2000APART
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 01/03/2000 at 15:56:58. Contact: ###-####. Restrooms ok to cover.
Roof Drains12/30/199912/30/199912/30/1999PPART
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 12/30/1999 at 08:57:44. Contact: ###-####. R.D., of D restroom water system complete.
Roof Drains12/29/199912/29/199912/29/1999PPART
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 12/29/1999 at 08:01:48. Contact: ###-####. Needs 3 sections of OFD tested ad misc. hangars installed.
Roof Drains12/28/199912/28/199912/28/1999PPART
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 12/28/1999 at 07:51:32. Contact: ###-####. West section partially ok, needs hangars.
Receive PAYMENT IN FULL  12/23/1999 DONE
Groundwork11/18/199911/18/199911/18/1999PPART
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 11/18/1999 at 10:36:32. Contact: ###-####. Restrooms, partial pressure sewer.
Groundwork11/17/199911/18/199911/17/1999APASS
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 11/17/1999 at 16:39:10. Contact: ###-####.
Groundwork11/16/199911/17/199911/17/1999AFAIL
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 11/16/1999 at 15:34:38. Contact: ###-####. No test on South rain water system.
Groundwork11/17/199911/17/199911/17/1999PFAIL
DetailsBill VanDegrift
Test on South rain water branch failed.
Plumbing Rough-in11/12/199911/15/199911/15/1999APART
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 11/12/1999 at 14:24:01. Contact: ###-####. Test on North RD line below grade ok.
Groundwork11/12/199911/12/199911/12/1999PPART
DetailsBill VanDegrift
Partial G/W ok, test Monday, R.D.'s north 1/2.
Application received  11/12/1999  
Issue & PRINT FEE-DUE permit  11/12/1999 DONE