Receive PAYMENT IN FULL | | | 3/16/2000 | | DONE |
|
|
|
|
Final | 2/8/2000 | 2/8/2000 | 2/8/2000 | P | PASS |
Bill VanDegrift
|
|
|
###-#### house is open... Final ok
|
Final | 2/4/2000 | 2/7/2000 | 2/7/2000 | A | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 02/04/2000 at 12:51:11. Contact: ###-####. Pipe T&P drain to garage floor or outside
|
Plumbing Rough-in | 12/20/1999 | 12/21/1999 | 12/21/1999 | A | PASS |
Bill VanDegrift
|
|
|
###-####. R/I ok with tub and shower valved secured.
|
Issue & PRINT FEE-DUE permit | | | 12/20/1999 | | DONE |
|
|
|
|
Application received | | | 12/20/1999 | | |
|
|
|
|