Permit Information
Permit NumberBLD00-00028
StatusFinaled
Name TRADEWINDS BUILDING COMPANY
Site Address 5595 N QUAIL SUMMIT PL
Project NameHILLSIDE
Customer Number854-1888
ePlanReviewNo
Description
To construct a 3219 sq. ft. two story single family dwelling with a 750 sq. ft. attached three car garage and 304 sq. ft. of concrete patio per approved plans, all engineering/red-lining and attached requirement lists. This lot is within a hillside area and is subject to the hillside ordinances. Class "A" roof system to be installed. Unless otherwise approved by the Boise City Fire Department, all lots shall be fitted with an NFPA 13D modified fire sprinkler system including all closets, bathrooms and attached garages. The sprinkler flow alarm shall be attached to the residence smoke detection system. (1st floor 2258 sq. ft.)(2nd floor 961 sq. ft.) PC #082 DJO
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Grading Inspection7/17/20007/17/20007/17/2000 PASS
DetailsRita DeYoung
agreed to allow house final if contractor had an area behind the garage regraded to provide drainage away from house. This has been completed satisfactorally.
BLD-Final7/12/20007/13/20007/13/2000APASS
DetailsTony Young
###-#### C of C #19700 issued 7/13/00 1:40:51 PM
BLD-Final7/10/20007/11/20007/11/2000PFAIL
DetailsTony Young
dennis ###-#### fn Need T.R. sign off. 7/12/00 10:39:34 AM
BLD-Final7/7/20007/10/20007/10/2000AFAIL
DetailsTony Young
dennis ###-#### Need Terry Records signoff & mec. & misc. items to finish. 7/11/00 11:49:58 AM
BLD-Final7/6/20007/7/20007/7/2000PCANC
DetailsTony Young
Scheduled by a contractor via Hello! on 07/06/2000 at 13:15:41. Contact: ###-####. Canel re-call when mec. is done. 7/10/00 9:47:09 AM
BLD-Framing/Rough-in5/15/20005/16/20005/16/2000AFAIL
DetailsTom Arcoraci
###-#### No repair doc's 5/16/00 1:22:28 PM
BLD-Framing/Rough-in5/16/20005/16/20005/16/2000PPASS
DetailsTom Arcoraci
BLD-Framing/Rough-in5/12/20005/15/20005/15/2000PCANC
DetailsTom Arcoraci
###-#### Unable to respond by 5pm 5/16/00 9:56:50 AM
BLD-Energy code compliance5/5/20005/8/20005/8/2000PPART
DetailsJim Storey
3 idems required verifacation ok to rock all areas but c/n areas. 5/8/00 5:23:43 PM
BLD-Energy code compliance5/5/20005/8/20005/8/2000PPART
DetailsJim Storey
###-####
BLD-Framing/Rough-in5/4/20005/5/20005/5/2000PPART
DetailsJim Storey
###-#### call first after 1 c/n holes in truss and mlb need engineering. 5/5/00 3:18:14 PM
BLD-Framing/Rough-in4/20/20004/21/20004/21/2000AFAIL
DetailsJim Sly
###-#### Need sprinkler R/I prior to frame 4/21/00 2:00:41 PM
BLD-Foundation3/9/20003/10/20003/10/2000PPASS
DetailsRuss Owen
###-#### Ok letter from soilds engineer. 3/14/00 11:12:48 AM
BLD-Footing3/8/20003/8/20003/8/2000PPART
DetailsRuss Owen
###-#### Needs soils letter of compliance from engineer, also enlarged footings are not inplace at locations shown on plans, contractor said he will dig these out. 3/9/00 2:13:30 PM