Permit Information
Permit NumberBLD00-00048
StatusFinaled
Name COLLIER KELLY
Site Address 8300 W OVERLAND RD
Project NameWAL-MART EXPANSION
Customer Number 
ePlanReviewNo
Description
WAL-MART SUPERSTORE EXPANSION * TO CONSTRUCT AN 80, 885 SQ. FT. ADDITION TO THE EXISTING WAL-MART STORE. THE ADDITION WILL BE TO THE SOUTH, WEST AND WEST HALF OF THE NORTH SIDES OF THE EXISTING BUILDING. THIS PERMIT ALSO INCLUDES THE REMODEL OF THE EXISTING PORTIONS OF THE BUILDING AND GARDEN CENTER AREAS PER THE APPROVED PLANS. THE ADDITION WILL INCLUDE A NEW GROCERY RETAIL AREA, BANK TENANT, VISION CENTER, FUTURE TENANT SPACE AND ENLARGED STOCK AND RECEIVING AREAS, AS WELL AS RELOCATION OF THE PHARMACY AND McDONALD'S RESTAURANT AREAS. CONSTRUCTION TO MATCH EXISTING BUILDING; MASONRY EXTERIOR WALLS, STEEL FRAME COLUMNS AND ROOF STRUCTURE. THIS BUILDING IS FULLY FIRE SPRINKLED. THIS IS A V-N CONSTRUCTION, UNLIMITED AREA BUILDING. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED COMMENT LIST. PC#010-00/DRH99-00170/JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/21/20013/22/20013/22/2001APASS
DetailsRuss Owen
###-####ok for perm oc,letter from engimneer and special inspection ok . 3/22/2001 11:29:23 AM
Permanent Occupancy 3/22/20013/22/2001 DONE
Details
BLD-Final3/12/20013/13/20013/13/2001PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 03/12/2001 at 16:59:34. Contact: ###-####.ok temp oc. need letter from MTI-Engineer to approve letter . also rear trash compactor area has racks that need bolts. also need perm oc from zoning.all others have signed perm. 3/14/2001 10:02:17 AM
BLD-Final3/6/20013/8/20013/8/2001AFAIL
DetailsRuss Owen
Scheduled by a contractor via Hello! on 03/06/2001 at 15:34:50. Contact: ###-####.needs achd, zoning,repair 3 rear exit corridors,racking missing bolts,mti final letter. 3/8/2001 11:33:59 AM 3/8/2001 11:34:10 AM
FIRE-Final Inspection3/6/20013/7/20013/7/2001APASS
DetailsJoe Tawney
Reinsp OK for permanant occupancy 3/7/2001 1:04:10 PM
FIRE-Final Inspection3/1/20013/2/20013/2/2001PFAIL
DetailsJoe Tawney
###-####. 3/2/2001 12:30:03 PM Final Fail C/N issued 3/5/2001 8:14:48 AM
BLD-Framing/Rough-in2/1/20012/2/20012/2/2001APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 02/01/2001 at 16:19:28. Contact: ###-####.ok to sheetrock sofit at front of store ,check stands. 2/2/2001 12:19:04 PM
BLD-Framing/Rough-in2/1/20012/1/20012/1/2001PCANC
DetailsRuss Owen
Scheduled by a contractor via Hello! on 02/01/2001 at 09:59:50. Contact: ###-####.
BLD-Framing/Rough-in1/26/20011/29/20011/29/2001APART
DetailsRuss Owen
ceiling grid miles ###-#### break room . 1/29/2001 1:04:44 PM
FIRE-Alarm Testing1/22/20011/23/20011/23/2001APART
DetailsJoe Tawney
###-#### ext 55371 Richard OK on alarm test except for 2 Ansul systems not yet installed. 1/23/2001 4:53:34 PM
BLD-Framing/Rough-in12/21/200012/22/200012/22/2000APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 12/21/2000 at 07:55:48. Contact: ###-####.ok to drop ceiling tile in bakery.ok to cover walls in east end smoking room and complete exit corridor in adjacent area. 12/22/2000 10:03:04 AM
FIRE-Final Inspection11/20/200011/20/200011/20/2000PPART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 11/20/2000 at 08:28:33. Contact: ###-####. okay to occupy MacDonalds only 11/20/2000 4:43:22 PM
FIRE-Final Inspection11/16/200011/17/200011/17/2000PFAIL
DetailsJoe Tawney
###-####. Reinsp Fail Electrics under hood and taped spklr heads 11/17/2000 7:24:22 PM
BLD-Final11/14/200011/15/200011/15/2000PPART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 11/14/2000 at 16:39:25. Contact: ###-####. 11/15/2000 4:10:33 PM ok to occ mac ds and use front door by mac ds 11/15/2000 4:31:21 PM
BLD-Conference11/7/200011/7/200011/7/2000PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 11/7/2000 1:24:20 PM w/ bldr re final
BLD-Final11/6/200011/7/200011/7/2000PNR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 11/06/2000 at 15:33:58. Contact: ###-####.
FIRE-Final Inspection11/6/200011/7/200011/7/2000PFAIL
DetailsJoe Tawney
###-####. Fail Taped heads, door hdwre, possible overspacing 11/8/2000 8:01:26 AM
BLD-Final11/2/200011/3/200011/3/2000ACANC
DetailsJim Sly
Scheduled by a contractor via Hello! on 11/02/2000 at 08:46:58. Contact: ###-####. Recalled for Carl D. PM. 11/3/2000 12:10:06 PM
BLD-Final11/3/200011/3/200011/3/2000PFAIL
DetailsCarl Dependahl
fn per jim sly; keep c/n, need fire& details requested re grease duct 11/3/2000 4:47:36 PM
BLD-Framing/Rough-in10/16/200010/17/200010/17/2000APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 10/16/2000 at 14:51:35. Contact: ###-####. 10/17/2000 9:40:43 AM 10/17/2000 10:24:01 AM wip 10/17/2000 12:42:34 PM
BLD-Framing/Rough-in10/13/200010/16/200010/16/2000ACANC
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 10/13/2000 at 14:09:01. Contact: .
BLD-Conference10/13/200010/13/200010/13/2000PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 10/13/2000 w/ supt re c/n of 10-12...detail to be onsite; need furthter info re grease duc/shaft.
BLD-Framing/Rough-in10/11/200010/12/200010/12/2000AFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 10/11/2000 at 16:36:12. Contact: .c/n re walls at McDonalds area. 10/12/2000 4:22:26 PM
BLD-Conference10/11/200010/11/200010/11/2000PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 10/11/2000 w/new supt re insp process
BLD-Framing/Rough-in9/29/200010/2/200010/2/2000APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 09/29/2000 at 12:14:55. Contact: ###-####. ok to cover fixture storage & mop sink 10/2/2000 4:27:10 PM
BLD-Framing/Rough-in9/25/20009/26/20009/26/2000AFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 09/25/2000 at 11:23:53. Contact: .
part ok to cover deck at west entry& overhang; c/n issued re corridor at storeroom 9/26/2000 4:23:09 PM
BLD-Framing/Rough-in8/29/20008/30/20008/30/2000AFAIL
DetailsCarl Dependahl
wall mark ###-####; rear corridor; c/nre lid detail. possible stop work for masons...no calls for insp to our office w/ w.i.p. 8/30/2000 3:10:05 PM
BLD-Other8/21/20008/21/20008/21/2000PFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 08/21/2000 at 11:08:25. Contact: ###-####.called in error, plbg insp??? 8/21/2000 4:20:44 PM
BLD-Framing/Rough-in7/20/20007/21/20007/21/2000ACANC
DetailsJim Sly
ceiling grid as per Jim Sly mark ###-####
BLD-Framing/Rough-in7/21/20007/21/20007/21/2000APART
DetailsJim Sly
Ceiling components ok except (spot check) spacer bars at final ceiling insp. 4-5 (front) occupancies.
BLD-Framing/Rough-in7/20/20007/20/20007/20/2000PNR
DetailsCarl Dependahl
ceiling grid---###-#### mark
BLD-Other7/12/20007/12/20007/12/2000PFAIL
DetailsCarl Dependahl
Mark; ###-####. Ceiling; seismic, accustical- inspection. Install seismic stuff & recall. 7/13/00 11:35:20 AM
BLD-Framing/Rough-in7/7/20007/7/20007/7/2000PPART
DetailsCarl Dependahl
masonry pouring at 1:30 no phone number Clifford
BLD-Concrete6/29/20006/30/20006/30/2000APART
DetailsDixie Fellows
will be on site spec inspector on site 6/30/00 8:33:27 AM
BLD-Foundation6/28/20006/29/20006/29/2000APART
DetailsCarl Dependahl
grout pour clifford no phone W.I>P. MTI onsite for masonry 6/30/00 8:14:42 AM
BLD-Final6/28/20006/28/20006/28/2000PFAIL
DetailsCarl Dependahl
temp occ mark ###-####
BLD-Footing6/28/20006/28/20006/28/2000PPART
DetailsCarl Dependahl
Lonnie ###-#### Mti onsite-some discrepancy noted on report of 6-13 Re: compaction 6/29/00 10:00:29 AM
BLD-Footing6/28/20006/28/20006/27/2000PFAIL
DetailsCarl Dependahl
multiple insp's; c/n re "final" or occupancy for garden ctr... need fire
BLD-Footing6/27/20006/27/20006/27/2000PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 06/27/2000 at 07:34:25. Contact: ###-####. MTI onsite 6/28/00 2:06:59 PM MTI onsite, pending reports 6/28/00 2:13:29 PM
BLD-Foundation6/26/20006/27/20006/27/2000ADONE
DetailsTom Arcoraci
pour at 7:30 ###-####
BLD-Foundation6/23/20006/26/20006/26/2000APART
DetailsCarl Dependahl
masonary insp---esi--###-#### spoke w/ mason- all insps to be called to office 6/27/00 2:33:12 PM
FIRE-Sprinkler Rough-in6/22/20006/22/20006/22/2000PFAIL
DetailsJoe Tawney
Mark ###-#### Not ready for sprinkler R/I no plans on site. 6/23/00 11:23:27 AM
BLD-Framing/Rough-in6/21/20006/21/20006/21/2000PFAIL
DetailsCarl Dependahl
wall insp--mark ###-#### Partial insp. phase 1; C/N: bulkhead attachment etc. 6/22/00 9:36:51 AM
BLD-Framing/Rough-in6/16/20006/19/20006/19/2000PPART
DetailsCarl Dependahl
Mark ###-#### need eng.'s ok for structure; ok to "1side" walls. Submit changes. 6/21/00 11:18:32 AM
BLD-Concrete5/19/20005/19/20005/19/2000PNR
DetailsCarl Dependahl
Insp. @ around 1:00. Lonnie- ###-#### Called, left msg....no response. 5/22/00 11:38:17 AM
FIRE-Sprinkler Rough-in5/18/20005/19/20005/19/2000APART
DetailsJoe Tawney
Scheduled by a contractor via Hello! on 05/18/2000 at 15:38:57. Contact: ###-####. Ok to cover supply line on North center of building. 5/22/00 10:47:32 AM
BLD-Other5/17/20005/18/20005/18/2000AFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 05/17/2000 at 16:27:21. Contact: ###-####. Recall; Req'd in error?? 5/22/00 9:29:39 AM
FIRE-Final Inspection5/18/20005/18/20005/18/2000PPART
DetailsJoe Tawney
###-#### Ok to cover supply line at North center & NW corner of facility 5/22/00 9:15:02 AM
FIRE-Sprinkler Rough-in5/12/20005/15/20005/15/2000APART
DetailsJoe Tawney
###-#### Ok to cover supply line at NE corner of bldg. 5/15/00 2:58:11 PM
BLD-Framing/Rough-in5/12/20005/12/20005/12/2000APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 05/12/2000 at 07:07:59. Contact: ###-####. Roof deck..has MTI onsite. 5/15/00 11:05:35 AM
FIRE-Sprinkler Rough-in5/11/20005/12/20005/12/2000ACANC
DetailsJoe Tawney
Scheduled by a contractor via Hello! on 05/11/2000 at 15:53:54. Contact: ###-####. Inspection cancelled to be rescheduled. 5/12/00 2:05:03 PM
FIRE-Sprinkler Rough-in5/11/20005/12/20005/12/2000PPART
DetailsJoe Tawney
Scheduled by a contractor via Hello! on 05/11/2000 at 16:49:35. Contact: ###-####. Ok to cover (2) thrust blocks on north side. 5/12/00 2:05:25 PM
BLD-Framing/Rough-in5/11/20005/11/20005/11/2000PFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 05/11/2000 at 07:54:47. Contact: ###-####. Unable to contact- left msg. 5/12/00 9:51:37 AM
FIRE-Sprinkler Rough-in5/10/20005/11/20005/11/2000APART
DetailsJoe Tawney
Scheduled by a contractor via Hello! on 05/10/2000 at 14:39:04. Contact: ###-####. Partial supply line cover at NE corner of bldg. 5/11/00 2:41:39 PM
BLD-Concrete4/27/20004/28/20004/28/2000APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 04/27/2000 at 13:16:06. Contact: . Pend. spec. insp. reports 4/28/00 3:04:00 PM
BLD-Footing4/27/20004/28/20004/28/2000APART
DetailsCarl Dependahl
###-#### Pend. spec. insp. reports. 4/28/00 3:03:37 PM
BLD-Concrete4/25/20004/26/20004/26/2000APART
DetailsCarl Dependahl
rebar ###-#### Pend. sp. insp. reports. 4/28/00 8:40:30 AM
BLD-Footing4/26/20004/26/20004/26/2000PPART
DetailsCarl Dependahl
###-#### Pend. sp. insp. report. 4/28/00 8:43:21 AM
BLD-Concrete4/24/20004/25/20004/25/2000APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 04/24/2000 at 13:47:49. Contact: . Maonry, met w/Mickleson onsite. pend MTI's report. 4/26/00 11:21:23 AM
BLD-Concrete4/19/20004/20/20004/20/2000APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 04/19/2000 at 12:17:27. Contact: ###-####. Pend. spec. insp. reports. ext. wall ftg's. 4/26/00 11:12:14 AM
BLD-Footing4/17/20004/18/20004/18/2000APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 04/17/2000 at 13:28:44. Contact: ###-####. MTI onsite met w/supt. & subs. for conc. & masonry. 4/19/00 9:20:05 AM
BLD-Conference4/11/20004/11/20004/11/2000APART
DetailsBill VanDegrift
Added by Inspector: 330 On 4/11/00 engineer to resubmit site plan showing 8" sewer instead of 21" sewer, grade apx .5%