BLD-Final | 3/21/2001 | 3/22/2001 | 3/22/2001 | A | PASS |
Russ Owen
|
|
|
###-####ok for perm oc,letter from engimneer and special inspection ok . 3/22/2001 11:29:23 AM
|
Permanent Occupancy | | 3/22/2001 | 3/22/2001 | | DONE |
|
|
|
|
BLD-Final | 3/12/2001 | 3/13/2001 | 3/13/2001 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/12/2001 at 16:59:34. Contact: ###-####.ok temp oc. need letter from MTI-Engineer to approve letter . also rear trash compactor area has racks that need bolts. also need perm oc from zoning.all others have signed perm. 3/14/2001 10:02:17 AM
|
BLD-Final | 3/6/2001 | 3/8/2001 | 3/8/2001 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/06/2001 at 15:34:50. Contact: ###-####.needs achd, zoning,repair 3 rear exit corridors,racking missing bolts,mti final letter. 3/8/2001 11:33:59 AM 3/8/2001 11:34:10 AM
|
FIRE-Final Inspection | 3/6/2001 | 3/7/2001 | 3/7/2001 | A | PASS |
Joe Tawney
|
|
|
Reinsp OK for permanant occupancy 3/7/2001 1:04:10 PM
|
FIRE-Final Inspection | 3/1/2001 | 3/2/2001 | 3/2/2001 | P | FAIL |
Joe Tawney
|
|
|
###-####. 3/2/2001 12:30:03 PM Final Fail C/N issued 3/5/2001 8:14:48 AM
|
BLD-Framing/Rough-in | 2/1/2001 | 2/2/2001 | 2/2/2001 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 02/01/2001 at 16:19:28. Contact: ###-####.ok to sheetrock sofit at front of store ,check stands. 2/2/2001 12:19:04 PM
|
BLD-Framing/Rough-in | 2/1/2001 | 2/1/2001 | 2/1/2001 | P | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 02/01/2001 at 09:59:50. Contact: ###-####.
|
BLD-Framing/Rough-in | 1/26/2001 | 1/29/2001 | 1/29/2001 | A | PART |
Russ Owen
|
|
|
ceiling grid miles ###-#### break room . 1/29/2001 1:04:44 PM
|
FIRE-Alarm Testing | 1/22/2001 | 1/23/2001 | 1/23/2001 | A | PART |
Joe Tawney
|
|
|
###-#### ext 55371 Richard OK on alarm test except for 2 Ansul systems not yet installed. 1/23/2001 4:53:34 PM
|
BLD-Framing/Rough-in | 12/21/2000 | 12/22/2000 | 12/22/2000 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 12/21/2000 at 07:55:48. Contact: ###-####.ok to drop ceiling tile in bakery.ok to cover walls in east end smoking room and complete exit corridor in adjacent area. 12/22/2000 10:03:04 AM
|
FIRE-Final Inspection | 11/20/2000 | 11/20/2000 | 11/20/2000 | P | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 11/20/2000 at 08:28:33. Contact: ###-####. okay to occupy MacDonalds only 11/20/2000 4:43:22 PM
|
FIRE-Final Inspection | 11/16/2000 | 11/17/2000 | 11/17/2000 | P | FAIL |
Joe Tawney
|
|
|
###-####. Reinsp Fail Electrics under hood and taped spklr heads 11/17/2000 7:24:22 PM
|
BLD-Final | 11/14/2000 | 11/15/2000 | 11/15/2000 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 11/14/2000 at 16:39:25. Contact: ###-####. 11/15/2000 4:10:33 PM ok to occ mac ds and use front door by mac ds 11/15/2000 4:31:21 PM
|
BLD-Conference | 11/7/2000 | 11/7/2000 | 11/7/2000 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 11/7/2000 1:24:20 PM w/ bldr re final
|
BLD-Final | 11/6/2000 | 11/7/2000 | 11/7/2000 | P | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/06/2000 at 15:33:58. Contact: ###-####.
|
FIRE-Final Inspection | 11/6/2000 | 11/7/2000 | 11/7/2000 | P | FAIL |
Joe Tawney
|
|
|
###-####. Fail Taped heads, door hdwre, possible overspacing 11/8/2000 8:01:26 AM
|
BLD-Final | 11/2/2000 | 11/3/2000 | 11/3/2000 | A | CANC |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/02/2000 at 08:46:58. Contact: ###-####. Recalled for Carl D. PM. 11/3/2000 12:10:06 PM
|
BLD-Final | 11/3/2000 | 11/3/2000 | 11/3/2000 | P | FAIL |
Carl Dependahl
|
|
|
fn per jim sly; keep c/n, need fire& details requested re grease duct 11/3/2000 4:47:36 PM
|
BLD-Framing/Rough-in | 10/16/2000 | 10/17/2000 | 10/17/2000 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/16/2000 at 14:51:35. Contact: ###-####. 10/17/2000 9:40:43 AM 10/17/2000 10:24:01 AM wip 10/17/2000 12:42:34 PM
|
BLD-Framing/Rough-in | 10/13/2000 | 10/16/2000 | 10/16/2000 | A | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/13/2000 at 14:09:01. Contact: .
|
BLD-Conference | 10/13/2000 | 10/13/2000 | 10/13/2000 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 10/13/2000 w/ supt re c/n of 10-12...detail to be onsite; need furthter info re grease duc/shaft.
|
BLD-Framing/Rough-in | 10/11/2000 | 10/12/2000 | 10/12/2000 | A | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 10/11/2000 at 16:36:12. Contact: .c/n re walls at McDonalds area. 10/12/2000 4:22:26 PM
|
BLD-Conference | 10/11/2000 | 10/11/2000 | 10/11/2000 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 10/11/2000 w/new supt re insp process
|
BLD-Framing/Rough-in | 9/29/2000 | 10/2/2000 | 10/2/2000 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 09/29/2000 at 12:14:55. Contact: ###-####. ok to cover fixture storage & mop sink 10/2/2000 4:27:10 PM
|
BLD-Framing/Rough-in | 9/25/2000 | 9/26/2000 | 9/26/2000 | A | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 09/25/2000 at 11:23:53. Contact: .
part ok to cover deck at west entry& overhang; c/n issued re corridor at storeroom 9/26/2000 4:23:09 PM
|
BLD-Framing/Rough-in | 8/29/2000 | 8/30/2000 | 8/30/2000 | A | FAIL |
Carl Dependahl
|
|
|
wall mark ###-####; rear corridor; c/nre lid detail. possible stop work for masons...no calls for insp to our office w/ w.i.p. 8/30/2000 3:10:05 PM
|
BLD-Other | 8/21/2000 | 8/21/2000 | 8/21/2000 | P | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 08/21/2000 at 11:08:25. Contact: ###-####.called in error, plbg insp??? 8/21/2000 4:20:44 PM
|
BLD-Framing/Rough-in | 7/20/2000 | 7/21/2000 | 7/21/2000 | A | CANC |
Jim Sly
|
|
|
ceiling grid as per Jim Sly mark ###-####
|
BLD-Framing/Rough-in | 7/21/2000 | 7/21/2000 | 7/21/2000 | A | PART |
Jim Sly
|
|
|
Ceiling components ok except (spot check) spacer bars at final ceiling insp. 4-5 (front) occupancies.
|
BLD-Framing/Rough-in | 7/20/2000 | 7/20/2000 | 7/20/2000 | P | NR |
Carl Dependahl
|
|
|
ceiling grid---###-#### mark
|
BLD-Other | 7/12/2000 | 7/12/2000 | 7/12/2000 | P | FAIL |
Carl Dependahl
|
|
|
Mark; ###-####. Ceiling; seismic, accustical- inspection. Install seismic stuff & recall. 7/13/00 11:35:20 AM
|
BLD-Framing/Rough-in | 7/7/2000 | 7/7/2000 | 7/7/2000 | P | PART |
Carl Dependahl
|
|
|
masonry pouring at 1:30 no phone number Clifford
|
BLD-Concrete | 6/29/2000 | 6/30/2000 | 6/30/2000 | A | PART |
Dixie Fellows
|
|
|
will be on site spec inspector on site 6/30/00 8:33:27 AM
|
BLD-Foundation | 6/28/2000 | 6/29/2000 | 6/29/2000 | A | PART |
Carl Dependahl
|
|
|
grout pour clifford no phone W.I>P. MTI onsite for masonry 6/30/00 8:14:42 AM
|
BLD-Final | 6/28/2000 | 6/28/2000 | 6/28/2000 | P | FAIL |
Carl Dependahl
|
|
|
temp occ mark ###-####
|
BLD-Footing | 6/28/2000 | 6/28/2000 | 6/28/2000 | P | PART |
Carl Dependahl
|
|
|
Lonnie ###-#### Mti onsite-some discrepancy noted on report of 6-13 Re: compaction 6/29/00 10:00:29 AM
|
BLD-Footing | 6/28/2000 | 6/28/2000 | 6/27/2000 | P | FAIL |
Carl Dependahl
|
|
|
multiple insp's; c/n re "final" or occupancy for garden ctr... need fire
|
BLD-Footing | 6/27/2000 | 6/27/2000 | 6/27/2000 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 06/27/2000 at 07:34:25. Contact: ###-####. MTI onsite 6/28/00 2:06:59 PM MTI onsite, pending reports 6/28/00 2:13:29 PM
|
BLD-Foundation | 6/26/2000 | 6/27/2000 | 6/27/2000 | A | DONE |
Tom Arcoraci
|
|
|
pour at 7:30 ###-####
|
BLD-Foundation | 6/23/2000 | 6/26/2000 | 6/26/2000 | A | PART |
Carl Dependahl
|
|
|
masonary insp---esi--###-#### spoke w/ mason- all insps to be called to office 6/27/00 2:33:12 PM
|
FIRE-Sprinkler Rough-in | 6/22/2000 | 6/22/2000 | 6/22/2000 | P | FAIL |
Joe Tawney
|
|
|
Mark ###-#### Not ready for sprinkler R/I no plans on site. 6/23/00 11:23:27 AM
|
BLD-Framing/Rough-in | 6/21/2000 | 6/21/2000 | 6/21/2000 | P | FAIL |
Carl Dependahl
|
|
|
wall insp--mark ###-#### Partial insp. phase 1; C/N: bulkhead attachment etc. 6/22/00 9:36:51 AM
|
BLD-Framing/Rough-in | 6/16/2000 | 6/19/2000 | 6/19/2000 | P | PART |
Carl Dependahl
|
|
|
Mark ###-#### need eng.'s ok for structure; ok to "1side" walls. Submit changes. 6/21/00 11:18:32 AM
|
BLD-Concrete | 5/19/2000 | 5/19/2000 | 5/19/2000 | P | NR |
Carl Dependahl
|
|
|
Insp. @ around 1:00. Lonnie- ###-#### Called, left msg....no response. 5/22/00 11:38:17 AM
|
FIRE-Sprinkler Rough-in | 5/18/2000 | 5/19/2000 | 5/19/2000 | A | PART |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 05/18/2000 at 15:38:57. Contact: ###-####. Ok to cover supply line on North center of building. 5/22/00 10:47:32 AM
|
BLD-Other | 5/17/2000 | 5/18/2000 | 5/18/2000 | A | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 05/17/2000 at 16:27:21. Contact: ###-####. Recall; Req'd in error?? 5/22/00 9:29:39 AM
|
FIRE-Final Inspection | 5/18/2000 | 5/18/2000 | 5/18/2000 | P | PART |
Joe Tawney
|
|
|
###-#### Ok to cover supply line at North center & NW corner of facility 5/22/00 9:15:02 AM
|
FIRE-Sprinkler Rough-in | 5/12/2000 | 5/15/2000 | 5/15/2000 | A | PART |
Joe Tawney
|
|
|
###-#### Ok to cover supply line at NE corner of bldg. 5/15/00 2:58:11 PM
|
BLD-Framing/Rough-in | 5/12/2000 | 5/12/2000 | 5/12/2000 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 05/12/2000 at 07:07:59. Contact: ###-####. Roof deck..has MTI onsite. 5/15/00 11:05:35 AM
|
FIRE-Sprinkler Rough-in | 5/11/2000 | 5/12/2000 | 5/12/2000 | A | CANC |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 05/11/2000 at 15:53:54. Contact: ###-####. Inspection cancelled to be rescheduled. 5/12/00 2:05:03 PM
|
FIRE-Sprinkler Rough-in | 5/11/2000 | 5/12/2000 | 5/12/2000 | P | PART |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 05/11/2000 at 16:49:35. Contact: ###-####. Ok to cover (2) thrust blocks on north side. 5/12/00 2:05:25 PM
|
BLD-Framing/Rough-in | 5/11/2000 | 5/11/2000 | 5/11/2000 | P | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 05/11/2000 at 07:54:47. Contact: ###-####. Unable to contact- left msg. 5/12/00 9:51:37 AM
|
FIRE-Sprinkler Rough-in | 5/10/2000 | 5/11/2000 | 5/11/2000 | A | PART |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 05/10/2000 at 14:39:04. Contact: ###-####. Partial supply line cover at NE corner of bldg. 5/11/00 2:41:39 PM
|
BLD-Concrete | 4/27/2000 | 4/28/2000 | 4/28/2000 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 04/27/2000 at 13:16:06. Contact: . Pend. spec. insp. reports 4/28/00 3:04:00 PM
|
BLD-Footing | 4/27/2000 | 4/28/2000 | 4/28/2000 | A | PART |
Carl Dependahl
|
|
|
###-#### Pend. spec. insp. reports. 4/28/00 3:03:37 PM
|
BLD-Concrete | 4/25/2000 | 4/26/2000 | 4/26/2000 | A | PART |
Carl Dependahl
|
|
|
rebar ###-#### Pend. sp. insp. reports. 4/28/00 8:40:30 AM
|
BLD-Footing | 4/26/2000 | 4/26/2000 | 4/26/2000 | P | PART |
Carl Dependahl
|
|
|
###-#### Pend. sp. insp. report. 4/28/00 8:43:21 AM
|
BLD-Concrete | 4/24/2000 | 4/25/2000 | 4/25/2000 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 04/24/2000 at 13:47:49. Contact: . Maonry, met w/Mickleson onsite. pend MTI's report. 4/26/00 11:21:23 AM
|
BLD-Concrete | 4/19/2000 | 4/20/2000 | 4/20/2000 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 04/19/2000 at 12:17:27. Contact: ###-####. Pend. spec. insp. reports. ext. wall ftg's. 4/26/00 11:12:14 AM
|
BLD-Footing | 4/17/2000 | 4/18/2000 | 4/18/2000 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 04/17/2000 at 13:28:44. Contact: ###-####. MTI onsite met w/supt. & subs. for conc. & masonry. 4/19/00 9:20:05 AM
|
BLD-Conference | 4/11/2000 | 4/11/2000 | 4/11/2000 | A | PART |
Bill VanDegrift
|
|
|
Added by Inspector: 330 On 4/11/00 engineer to resubmit site plan showing 8" sewer instead of 21" sewer, grade apx .5%
|