BLD-Final | 8/8/2000 | 8/9/2000 | 8/9/2000 | A | PASS |
Carl Dependahl
|
|
|
Jeff ###-####
|
Permanent Occupancy | | 8/9/2000 | 8/9/2000 | | DONE |
|
|
|
|
BLD-Final | 8/4/2000 | 8/7/2000 | 8/7/2000 | A | FAIL |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 08/04/2000 at 14:56:52. Contact: ###-####. not ready 8/7/2000 11:57:05 AM
|
BLD-Final | 8/7/2000 | 8/7/2000 | 8/7/2000 | P | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 08/07/2000 at 10:04:20. Contact: ###-####.
|
BLD-Final | 8/3/2000 | 8/4/2000 | 8/4/2000 | A | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 08/03/2000 at 12:39:40. Contact: ###-####. need elec & fire, no insp 8/4/2000 3:23:19 PM
|
FIRE-Final Inspection | 8/3/2000 | 8/4/2000 | 8/4/2000 | A | PASS |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 08/03/2000 at 17:18:54. Contact: ###-####. Reinsp. ok for perm. occ. 8/7/00 8:38:06 AM
|
FIRE-Final Inspection | 8/2/2000 | 8/3/2000 | 8/3/2000 | P | FAIL |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 08/02/2000 at 07:28:06. Contact: ###-####. Reinsp. fail alarm system emergency lights 8/7/00 8:30:52 AM
|
FIRE-Final Inspection | 8/2/2000 | 8/3/2000 | 8/3/2000 | P | FAIL |
Joe Tawney
|
|
|
EARLE-- ###-#### FIRE FN Reinsp. fail alarm system emergency lights 8/7/00 8:31:08 AM
|
FIRE-Final Inspection | 8/1/2000 | 8/2/2000 | 8/2/2000 | A | CANC |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 08/01/2000 at 12:28:18. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 08/02/2000 at 07:26:15.
|
BLD-Other | 7/31/2000 | 8/1/2000 | 7/31/2000 | A | CANC |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 07/31/2000 at 14:26:08. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 07/31/2000 at 14:27:51.
|
FIRE-Final Inspection | 7/27/2000 | 7/28/2000 | 7/28/2000 | P | FAIL |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 07/27/2000 at 17:01:36. Contact: ###-####. Final fail C/N issued. 7/31/00 8:31:51 AM
|
BLD-Framing/Rough-in | 7/26/2000 | 7/27/2000 | 7/27/2000 | P | PART |
Jim Storey
|
|
|
GARY --###-#### CEILING INSP ceilling ok except above hood ceilling required and all trash to be removed. 7/28/2000 8:42:38 AM
|
BLD-Conference | 7/26/2000 | 7/26/2000 | 7/26/2000 | P | PART |
Carl Dependahl
|
|
|
###-####-gary for conf; call for final. 7/26/2000 4:26:31 PM
|
FIRE-Conference | 7/26/2000 | 7/26/2000 | 7/26/2000 | P | PART |
Joe Tawney
|
|
|
gary ###-#### fire conf Conf with Gary Gen Contractor. 7/27/00 10:42:08 AM
|
FIRE-Supply Line Flush | 7/11/2000 | 7/12/2000 | 7/12/2000 | A | PART |
Joe Tawney
|
|
|
PER JOE T. 9:00--ERIC ###-#### Ok on supply line flush 7/12/00 1:07:43 PM
|
BLD-Framing/Rough-in | 6/29/2000 | 6/29/2000 | 6/28/2000 | | PART |
Carl Dependahl
|
|
|
|
BLD-Framing/Rough-in | 6/27/2000 | 6/27/2000 | 6/27/2000 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 06/27/2000 at 07:19:26. Contact: ###-####. shafts@ hoods-need verify htg. ok for grease duct, told Alan H. 6/28/00 2:14:03 PM
|
BLD-Framing/Rough-in | 6/26/2000 | 6/26/2000 | 6/26/2000 | P | FAIL |
|
|
|
Scheduled by a contractor via Hello! on 06/26/2000 at 09:59:44. Contact: ###-####. need proper assy for grease shaft and must follow same to the letter 6/26/00 4:58:36 PM
|
BLD-Wall cover | 6/9/2000 | 6/9/2000 | 6/9/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 06/09/2000 at 08:25:07. Contact: ###-####. verified engineering design and put in carls box for archival. 6/12/00 9:08:15 AM
|
BLD-Framing/Rough-in | 6/7/2000 | 6/7/2000 | 6/7/2000 | P | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 06/07/2000 at 06:47:46. Contact: ###-####. c/n fail ok to insul ext. walls; eng'r to address street issues 6/19/00 11:37:13 AM
|
BLD-Framing/Rough-in | 6/5/2000 | 6/6/2000 | 6/6/2000 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 06/05/2000 at 15:00:09. Contact: ###-####. Ext. nailing; need anchor bolts, straps etc. @ sw's...eng'r to address. 6/7/00 10:04:44 AM
|
BLD-Conference | 5/25/2000 | 5/26/2000 | 5/26/2000 | A | PASS |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 05/25/2000 at 15:02:22. Contact: ###-####. W/supt. roof diaphram ok. 5/31/00 9:17:54 AM
|
BLD-Framing/Rough-in | 5/25/2000 | 5/26/2000 | 5/26/2000 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 05/25/2000 at 15:03:07. Contact: ###-####.
|
FIRE-Supply Line Cover | 5/8/2000 | 5/8/2000 | 5/8/2000 | P | PART |
Joe Tawney
|
|
|
jim ###-#### underground Ok supply line cover 5/9/00 11:34:57 AM
|
BLD-Foundation | 4/27/2000 | 4/27/2000 | 4/27/2000 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 04/27/2000 at 09:13:40. Contact: ###-####. Address wrong? MTI onsite for fnd. 4/28/00 3:00:26 PM
|
BLD-Footing | 4/22/2000 | 4/24/2000 | 4/24/2000 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 04/22/2000 at 14:01:39. Contact: ###-####. Pending soils & spec. insp. reports..is this mis-addressed. 4/26/00 12:14:24 PM
|