FIRE-Conference | 7/10/2008 | 7/10/2008 | 7/10/2008 | P | DONE |
Forrest France
|
|
|
Per Forrest France's e-mail see scanned and attached documents- ok to doc final for Fire///7-10-08 BAS
|
DOC - Permit Finaled | | | 7/10/2008 | | DONE |
Barbara Stitt
|
|
|
Per Dave Hannah ok to Doc Final this permit 7-10-08 BAS
|
BLD-Conference | 2/12/2002 | 2/12/2002 | 2/12/2002 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 2/12/2002 6:28:38 PM w/ Mike Cotner & supt re finals for west wing project...need eng's ok for MTI's observations & schmidt hammer tests
|
BLD-Conference | 12/17/2001 | 12/17/2001 | 12/17/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 12/17/2001 11:01:53 AM w/ CH2M hill eng'r...need final report/affidavit for seismic upgrade, Spec insp reports appear inadequate(failures,improper test methods); must show bldg up to specs.
|
BLD-Conference | 12/7/2001 | 12/7/2001 | 12/7/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 12/7/2001 12:22:44 PM w/ Jason, st Luke's supt. at site. need appropriate test reports & all sign-offs for project...ok to use stairs.
|
BLD-Final | 10/25/2001 | 10/26/2001 | 10/26/2001 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 10/25/2001 at 08:11:17. Contact: ###-####. stair enclosure only ok for t/o; need eng's/spec insp's approval affidavits for entire west wing remodel project, add appropriate signage at doors. complete tile-floor surface & maintain exiting as req'd. 10/26/2001 11:28:30 AM
|
FIRE-Final Inspection | 10/25/2001 | 10/26/2001 | 10/26/2001 | A | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 10/25/2001 at 08:10:17. Contact: ###-####. okay to use stair enclosure 10/26/2001 11:26:21 AM
|
BLD-Conference | 10/25/2001 | 10/25/2001 | 10/25/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 10/25/2001 12:24:07 PM w/ kelly re final
|
BLD-Conference | 10/24/2001 | 10/24/2001 | 10/24/2001 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 10/24/2001 11:39:50 AM w/ Rick re finals for stair enclosure...ok w/o tiles til upper floor const complete if exit maintained
|
FIRE-Supply Line Cover | 10/23/2001 | 10/24/2001 | 10/24/2001 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 10/23/2001 at 11:58:16. Contact: ###-####. penetrations; floor needs grinding down; clean storage of constrcution materials 10/23/2001 2:41:50 PM
|
BLD-Conference | 10/8/2001 | 10/8/2001 | 10/8/2001 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 10/8/2001 10:39:32 AM reviewed Mti reports, as permit #'s had been incorrect
|
BLD-Conference | 10/5/2001 | 10/5/2001 | 10/5/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 10/5/2001 3:05:07 PM rec'd arch's letter ok'ing deletion of ts col's...no longer req'd as hvac unit support
|
BLD-Conference | 9/24/2001 | 9/24/2001 | 9/24/2001 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 9/24/2001 8:35:18 AM reviewed MTI report....shotcrete section.
|
BLD-Conference | 8/14/2001 | 8/14/2001 | 8/14/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 8/14/2001 10:34:46 AM w/ St Lukes; revised spec insp reports rec'd...(permit #s were incorrect on some ); final MTI affidavit re west wing stair is mentioned, but not rec'd at this time
|
FIRE-Final Inspection | 7/24/2001 | 7/24/2001 | 7/24/2001 | A | FAIL |
Rick Jackson
|
|
|
Added by Inspector: 409 On 7/24/2001 9:58:43 AM penetration from sink drain into enclosure; sprinklers required; smoke seals on doors; requested sprinkler and alarm plans for 1-2-3rd floor remodels
|
BLD-Conference | 6/26/2001 | 6/26/2001 | 6/26/2001 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 6/26/2001 11:30:28 AM onsite w/ supt, obtain other oks, submit engs ok for discrepancies/modifications
|
BLD-Conference | 6/1/2001 | 6/1/2001 | 6/1/2001 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 6/1/2001 8:01:32 AM w/ proj mgr re modifications, need eng'g stamped
|
BLD-Conference | 5/25/2001 | 5/25/2001 | 5/25/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 5/25/2001 7:47:48 AM w/ John Schultz re: modifications to upgrade, need eng's letter
|
BLD-Conference | 5/16/2001 | 5/16/2001 | 5/16/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 5/16/2001 4:59:01 PM w/ proj mgr, need engs ok for shearwalls changed
|
BLD-Conference | 5/16/2001 | 5/16/2001 | 5/16/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 5/16/2001 4:59:01 PM w/ proj mgr, need engs ok for shearwalls changed
|
BLD-Conference | 5/8/2001 | 5/8/2001 | 5/8/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 5/8/2001 3:03:32 PM w/ proj mgr...needeng'r to address discrepancies & missed tests by MTI.
|
BLD-Conference | 4/25/2001 | 4/25/2001 | 4/25/2001 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 4/25/2001 9:30:31 AM w/ new proj mgr...obtain insps as req'd
|
BLD-Conference | 4/17/2001 | 4/17/2001 | 4/17/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 4/17/2001 3:15:10 PM w/John; re prior actions on project...need call insps when placing shotcrete
|
BLD-Framing/Rough-in | 3/19/2001 | 3/19/2001 | 3/19/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 3/19/2001 4:11:39 PM reviewed insp reports for shot-crete; steel added at stairs ok.
|
BLD-Concrete | 2/7/2001 | 2/12/2001 | 2/12/2001 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 02/07/2001 at 13:37:46. Contact: ###-####. pend insp rport for shotcrete 2/12/2001 3:16:49 PM
|
BLD-Framing/Rough-in | 1/31/2001 | 1/31/2001 | 1/31/2001 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 01/31/2001 at 08:34:01. Contact: ###-####. part, clg at stairs ok to tile, need fasteners per ul detail at gyp face layer at stair walls2/1/2001 11:53:20 AM 2/1/2001 11:55:02 AM
|
BLD-Conference | 1/19/2001 | 1/19/2001 | 1/19/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 1/19/2001 12:31:53 PM w/ Kelly re c/n...ok if arch certifies fix at beams
|
BLD-Framing/Rough-in | 1/17/2001 | 1/18/2001 | 1/18/2001 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 01/17/2001 at 15:20:22. Contact: ###-####.wip on wrapping col's & beams, need arch's letter 1/18/2001 4:02:27 PM
|
BLD-Conference | 1/17/2001 | 1/17/2001 | 1/17/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 1/17/2001 10:15:19 AM w/ framer at stair enclosure, keep c/n re indiv. protection of members...beams, col's. requested arch's response
|
BLD-Framing/Rough-in | 1/15/2001 | 1/16/2001 | 1/16/2001 | A | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 01/15/2001 at 08:26:55. Contact: ###-####. c/n isued re fire rating at beam/ col's at stairs... need 2hrindivi 1/16/2001 2:02:49 PM dual?? 1/16/2001 2:02:57 PM
|
BLD-Other | 1/8/2001 | 1/9/2001 | 1/9/2001 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 01/08/2001 at 14:13:06. Contact: ###-####.
|
BLD-Framing/Rough-in | 12/21/2000 | 12/22/2000 | 12/22/2000 | A | NR |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 12/21/2000 at 11:39:01. Contact: ###-####. conf only w/ proj. mgr. 12/22/2000 10:13:57 AM
|
BLD-Other | 8/8/2000 | 8/8/2000 | 8/8/2000 | P | PART |
|
|
|
Scheduled by a contractor via Hello! on 08/08/2000 at 08:48:50. Contact: ###-####. looked at the r-baron the 1st level prior to shotgrete, all sp insp must be caught up prior to pour of same spoke with danny 8/9/2000 11:10:02 AM
|
BLD-Other | 4/12/2000 | 4/13/2000 | 4/13/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 04/12/2000 at 15:05:51. Contact: ###-####. need sp insp scope letter all per the sp insp approvals. 04/13/2000
|