Permit Information
Permit NumberBLD00-00081
StatusFinaled
Name ST LUKES
Site Address 190 E BANNOCK ST
Project NameST LUKES-WEST WING
Customer Number 
ePlanReviewNo
Description
SLRMC WEST WING STAIRWELL - To demo interior North half of exisitng floor areas on the first & third floor and on the West half of the second floor, approximately 12,000 s.f.of the approximately 30,000 s.f. West Wing first three stories. To add new structural support beams & columns to carry the floor at the 1st, 2nd & 3rd floors where opening for new stairs & enclosure will be constructed. To add anchors & place reinforcement at designated walls for placement of new shotcrete structural shear walls at all three floor levels. To make all construction & finish to comply with 2-hour stair enclosure requirements within an existing Type I-FR structure. To protect existing openings at and in enclosure per code. Upgrade electrical, mechanical, plumbing, sprinkler and alarm system per plans & code. No new interior construction or finish beyond the scope clearly shown on the approved plans at the area of the Northwest corner of the floor; maintenance of existing exit corridor systems & upgrade of new accessible restroom. All per approved plans, notes thereon and attachments of plan review comments. NOTE: This building is fully sprinkled. PC#00-0024/drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Conference7/10/20087/10/20087/10/2008PDONE
DetailsForrest France
Per Forrest France's e-mail see scanned and attached documents- ok to doc final for Fire///7-10-08 BAS
DOC - Permit Finaled  7/10/2008 DONE
DetailsBarbara Stitt
Per Dave Hannah ok to Doc Final this permit 7-10-08 BAS
BLD-Conference2/12/20022/12/20022/12/2002PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 2/12/2002 6:28:38 PM w/ Mike Cotner & supt re finals for west wing project...need eng's ok for MTI's observations & schmidt hammer tests
BLD-Conference12/17/200112/17/200112/17/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 12/17/2001 11:01:53 AM w/ CH2M hill eng'r...need final report/affidavit for seismic upgrade, Spec insp reports appear inadequate(failures,improper test methods); must show bldg up to specs.
BLD-Conference12/7/200112/7/200112/7/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 12/7/2001 12:22:44 PM w/ Jason, st Luke's supt. at site. need appropriate test reports & all sign-offs for project...ok to use stairs.
BLD-Final10/25/200110/26/200110/26/2001APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 10/25/2001 at 08:11:17. Contact: ###-####. stair enclosure only ok for t/o; need eng's/spec insp's approval affidavits for entire west wing remodel project, add appropriate signage at doors. complete tile-floor surface & maintain exiting as req'd. 10/26/2001 11:28:30 AM
FIRE-Final Inspection10/25/200110/26/200110/26/2001APASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 10/25/2001 at 08:10:17. Contact: ###-####. okay to use stair enclosure 10/26/2001 11:26:21 AM
BLD-Conference10/25/200110/25/200110/25/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 10/25/2001 12:24:07 PM w/ kelly re final
BLD-Conference10/24/200110/24/200110/24/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 10/24/2001 11:39:50 AM w/ Rick re finals for stair enclosure...ok w/o tiles til upper floor const complete if exit maintained
FIRE-Supply Line Cover10/23/200110/24/200110/24/2001AFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 10/23/2001 at 11:58:16. Contact: ###-####. penetrations; floor needs grinding down; clean storage of constrcution materials 10/23/2001 2:41:50 PM
BLD-Conference10/8/200110/8/200110/8/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 10/8/2001 10:39:32 AM reviewed Mti reports, as permit #'s had been incorrect
BLD-Conference10/5/200110/5/200110/5/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 10/5/2001 3:05:07 PM rec'd arch's letter ok'ing deletion of ts col's...no longer req'd as hvac unit support
BLD-Conference9/24/20019/24/20019/24/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 9/24/2001 8:35:18 AM reviewed MTI report....shotcrete section.
BLD-Conference8/14/20018/14/20018/14/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 8/14/2001 10:34:46 AM w/ St Lukes; revised spec insp reports rec'd...(permit #s were incorrect on some ); final MTI affidavit re west wing stair is mentioned, but not rec'd at this time
FIRE-Final Inspection7/24/20017/24/20017/24/2001AFAIL
DetailsRick Jackson
Added by Inspector: 409 On 7/24/2001 9:58:43 AM penetration from sink drain into enclosure; sprinklers required; smoke seals on doors; requested sprinkler and alarm plans for 1-2-3rd floor remodels
BLD-Conference6/26/20016/26/20016/26/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 6/26/2001 11:30:28 AM onsite w/ supt, obtain other oks, submit engs ok for discrepancies/modifications
BLD-Conference6/1/20016/1/20016/1/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 6/1/2001 8:01:32 AM w/ proj mgr re modifications, need eng'g stamped
BLD-Conference5/25/20015/25/20015/25/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 5/25/2001 7:47:48 AM w/ John Schultz re: modifications to upgrade, need eng's letter
BLD-Conference5/16/20015/16/20015/16/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 5/16/2001 4:59:01 PM w/ proj mgr, need engs ok for shearwalls changed
BLD-Conference5/16/20015/16/20015/16/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 5/16/2001 4:59:01 PM w/ proj mgr, need engs ok for shearwalls changed
BLD-Conference5/8/20015/8/20015/8/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 5/8/2001 3:03:32 PM w/ proj mgr...needeng'r to address discrepancies & missed tests by MTI.
BLD-Conference4/25/20014/25/20014/25/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 4/25/2001 9:30:31 AM w/ new proj mgr...obtain insps as req'd
BLD-Conference4/17/20014/17/20014/17/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 4/17/2001 3:15:10 PM w/John; re prior actions on project...need call insps when placing shotcrete
BLD-Framing/Rough-in3/19/20013/19/20013/19/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 3/19/2001 4:11:39 PM reviewed insp reports for shot-crete; steel added at stairs ok.
BLD-Concrete2/7/20012/12/20012/12/2001PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 02/07/2001 at 13:37:46. Contact: ###-####. pend insp rport for shotcrete 2/12/2001 3:16:49 PM
BLD-Framing/Rough-in1/31/20011/31/20011/31/2001PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 01/31/2001 at 08:34:01. Contact: ###-####. part, clg at stairs ok to tile, need fasteners per ul detail at gyp face layer at stair walls2/1/2001 11:53:20 AM 2/1/2001 11:55:02 AM
BLD-Conference1/19/20011/19/20011/19/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 1/19/2001 12:31:53 PM w/ Kelly re c/n...ok if arch certifies fix at beams
BLD-Framing/Rough-in1/17/20011/18/20011/18/2001PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 01/17/2001 at 15:20:22. Contact: ###-####.wip on wrapping col's & beams, need arch's letter 1/18/2001 4:02:27 PM
BLD-Conference1/17/20011/17/20011/17/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 1/17/2001 10:15:19 AM w/ framer at stair enclosure, keep c/n re indiv. protection of members...beams, col's. requested arch's response
BLD-Framing/Rough-in1/15/20011/16/20011/16/2001AFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 01/15/2001 at 08:26:55. Contact: ###-####. c/n isued re fire rating at beam/ col's at stairs... need 2hrindivi 1/16/2001 2:02:49 PM dual?? 1/16/2001 2:02:57 PM
BLD-Other1/8/20011/9/20011/9/2001PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 01/08/2001 at 14:13:06. Contact: ###-####.
BLD-Framing/Rough-in12/21/200012/22/200012/22/2000ANR
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 12/21/2000 at 11:39:01. Contact: ###-####. conf only w/ proj. mgr. 12/22/2000 10:13:57 AM
BLD-Other8/8/20008/8/20008/8/2000PPART
Details
Scheduled by a contractor via Hello! on 08/08/2000 at 08:48:50. Contact: ###-####. looked at the r-baron the 1st level prior to shotgrete, all sp insp must be caught up prior to pour of same spoke with danny 8/9/2000 11:10:02 AM
BLD-Other4/12/20004/13/20004/13/2000APART
Details
Scheduled by a contractor via Hello! on 04/12/2000 at 15:05:51. Contact: ###-####. need sp insp scope letter all per the sp insp approvals. 04/13/2000