BLD-Final | 11/13/2000 | 11/14/2000 | 11/14/2000 | A | PASS |
Carl Dependahl
|
|
|
Paul, ###-#### ext. 1022, ok for c/o 11/14/2000 2:52:37 PM
|
Permanent Occupancy | | 11/14/2000 | 11/14/2000 | | DONE |
|
|
|
|
BLD-Final | 8/31/2000 | 9/1/2000 | 9/1/2000 | P | PART |
|
|
|
MATTHEW WUITSCHICK-- ###-#### -mid-afternoon, please signe dthe temp col 9/1/2000 4:21:54 PM
|
FIRE-Final Inspection | 8/31/2000 | 8/31/2000 | 8/31/2000 | P | PASS |
Rick Jackson
|
|
|
Scheduled by Inspector: 409 On 8/31/2000
|
BLD-Conference | 8/29/2000 | 8/29/2000 | 8/29/2000 | A | PART |
|
|
|
Added by Inspector: 338 On 8/29/2000 with mat on the phone he is need ing bond for pz, and problem with public works may result in having the dry well re excavated to allow proper inspection.
|
FIRE-Alarm Testing | 8/17/2000 | 8/17/2000 | 8/17/2000 | A | FAIL |
Rick Jackson
|
|
|
Added by Inspector: 409 On 8/17/2000 strobes not synchronized in FM areas; batteries not installed; dialer not ready; smoke detectors at supply air diffusers
|
BLD-Framing/Rough-in | 8/2/2000 | 8/2/2000 | 8/2/2000 | P | PART |
|
|
|
ceiling grid matt wuitschick ###-#### ok to drop in ceiling tiles 8/2/2000 4:04:26 PM
|
BLD-Framing/Rough-in | 5/11/2000 | 5/15/2000 | 5/15/2000 | P | PART |
|
|
|
Scheduled by a contractor via Hello! on 05/11/2000 at 13:06:43. Contact: ###-####. made ok to cover behind other agencies, ceilings painted and in process of installing light fixtures and ele panels and switch gear 5/15/00 4:13:31 PM
|
BLD-Framing/Rough-in | 4/24/2000 | 4/24/2000 | 4/24/2000 | P | PART |
|
|
|
Scheduled by Inspector: 338 On 4/24/00 ok to cover with ele and plm ok's 4/24/00 3:48:33 PM
|
BLD-Framing/Rough-in | 4/20/2000 | 4/20/2000 | 4/20/2000 | P | PART |
|
|
|
###-#### made ok to cover with ele and plm signoffs 04/24/2000 7:25:07 AM
|
BLD-Concrete | 3/31/2000 | 3/31/2000 | 3/31/2000 | P | PART |
|
|
|
###-#### r-bars placed ok with sp insp approvals 03/31/2000
|
BLD-Conference | 3/23/2000 | 3/23/2000 | 3/23/2000 | P | PART |
|
|
|
pre-const insp--matt ###-#### need to inspect the engineered required attachments for the roof diaphram 03/24/2000 8:47:11 AM
|