BLD-Final | 10/17/2000 | 10/18/2000 | 10/18/2000 | P | PASS |
Tom Arcoraci
|
|
|
Tony ###-####
|
FIRE-Final Inspection | 10/17/2000 | 10/18/2000 | 10/18/2000 | A | PASS |
Joe Tawney
|
|
|
Tony Shiverick ###-#### rEINSP ok FOR PERMANANT OCCUPANCY 10/18/2000 12:16:11 PM
|
Permanent Occupancy | | 10/18/2000 | 10/18/2000 | | DONE |
|
|
|
|
BLD-Final | 9/6/2000 | 9/7/2000 | 9/7/2000 | P | FAIL |
Carl Dependahl
|
|
|
TONY ###-#### FN OCC, need fire ok 9/7/2000 3:48:23 PM
|
FIRE-Final Inspection | 9/6/2000 | 9/7/2000 | 9/7/2000 | P | FAIL |
Joe Tawney
|
|
|
TONY ###-#### FIRE FN Reinsp Fail 9/8/2000 7:50:41 AM
|
BLD-Final | 6/7/2000 | 6/8/2000 | 6/8/2000 | A | PART |
Alan Hauser
|
|
|
Tony ###-####
Temp occ only still needs ramp fixed
|
BLD-Final | 6/1/2000 | 6/1/2000 | 6/1/2000 | A | FAIL |
Carl Dependahl
|
|
|
Per GS & conf. w/Tony Shiverick. Need complying exits as shown. Add'l guardrail const. req'd. ok to use bldg. if WIP.
|
BLD-Final | 5/23/2000 | 5/25/2000 | 5/25/2000 | P | FAIL |
Carl Dependahl
|
|
|
###-#### Complete C/N, recall: exit door hdwr & landing. 5/26/00 12:15:46 PM
|
FIRE-Final Inspection | 5/24/2000 | 5/25/2000 | 5/25/2000 | A | PART |
Joe Tawney
|
|
|
###-#### Reinsp. ok for temp. occ. Door hardware and valve tamper in pit. 5/25/00 1:39:41 PM
|
FIRE-Final Inspection | 5/23/2000 | 5/24/2000 | 5/24/2000 | A | CANC |
Joe Tawney
|
|
|
###-#### Contractor scheduled for 5/25/00. PDS error 5/25/00 9:00:50 AM
|
BLD-Final | 5/19/2000 | 5/22/2000 | 5/22/2000 | P | FAIL |
Carl Dependahl
|
|
|
Tony; ###-####. C/N- ADA, landings, fire, door hdwr. 5/23/00 2:34:33 PM
|
BLD-Final | 5/18/2000 | 5/19/2000 | 5/19/2000 | P | FAIL |
Carl Dependahl
|
|
|
###-#### N/R, recall 5/22/00 11:38:41 AM
|
FIRE-Final Inspection | 5/18/2000 | 5/19/2000 | 5/19/2000 | A | FAIL |
Joe Tawney
|
|
|
###-#### Final fail C/N issued. 5/22/00 10:56:55 AM
|
BLD-Final | 5/15/2000 | 5/16/2000 | 5/16/2000 | P | FAIL |
Carl Dependahl
|
|
|
tony --###-#### fn
|
BLD-Framing/Rough-in | 4/13/2000 | 4/14/2000 | 4/14/2000 | A | PART |
Tom Arcoraci
|
|
|
###-#### See old C/notice 4/14/00 1:51:08 PM
|
FIRE-Sprinkler Rough-in | 4/11/2000 | 4/12/2000 | 4/12/2000 | P | PART |
Joe Tawney
|
|
|
doug ###-#### pager # r/i Ok sprkl. R/I & hydro test. Attach earthquake bracing to top of trusses or submit calc. 4/13/00 8:51:50 AM
|
BLD-Concrete | 4/6/2000 | 4/7/2000 | 4/7/2000 | A | PART |
Carl Dependahl
|
|
|
###-#### Slab/ramp 4/7/00 2:45:25 PM
|
BLD-Concrete | 4/5/2000 | 4/6/2000 | 4/6/2000 | A | FAIL |
Jim Sly
|
|
|
###-#### NR 4/6/00 3:00:34 PM
|
BLD-Framing/Rough-in | 3/30/2000 | 4/4/2000 | 4/4/2000 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/30/2000 at 13:29:41. Contact: ###-####. Ramp fnd. wall ok to pour 4/4/00 1:28:01 PM
|
BLD-Framing/Rough-in | 4/3/2000 | 4/4/2000 | 4/4/2000 | A | FAIL |
Russ Owen
|
|
|
re-bar Tony Shervik ###-#### ramp C/N, detail for lid, etc. 4/4/00 1:28:13 PM
|