BLD-Final | 8/28/2000 | 8/29/2000 | 8/29/2000 | A | PASS |
Alan Hauser
|
|
|
c/c#19280 8/29/2000 12:18:19 PM
|
BLD-Final | 8/24/2000 | 8/24/2000 | 8/24/2000 | P | FAIL |
Russ Owen
|
|
|
Nick; ###-#### Needs handrail to code. 8/25/2000 9:50:10 AM
|
BLD-Energy code compliance | 5/19/2000 | 5/22/2000 | 5/22/2000 | P | PASS |
Russ Owen
|
|
|
nick ###-#### energy code insp. Reasigned to 407 by 325.
|
BLD-Framing/Rough-in | 5/16/2000 | 5/17/2000 | 5/17/2000 | P | FAIL |
Russ Owen
|
|
|
###-#### C/N posted 5/18/00 3:04:37 PM
|
BLD-Framing/Rough-in | 5/16/2000 | 5/16/2000 | 5/16/2000 | P | CANC |
Russ Owen
|
|
|
###-#### Will recall when ready 5/17/00 1:55:25 PM
|
BLD-Framing/Rough-in | 5/12/2000 | 5/15/2000 | 5/15/2000 | A | PART |
Bob Archibald
|
|
|
###-#### shear wall. Reasigned to Russ.
|
BLD-Framing/Rough-in | 5/15/2000 | 5/15/2000 | 5/15/2000 | A | FAIL |
Russ Owen
|
|
|
Left a C/N, has engineer approval items on his correction list?
|
BLD-Framing/Rough-in | 5/15/2000 | 5/15/2000 | 5/15/2000 | P | PASS |
Russ Owen
|
|
|
Ok to side.
|
BLD-Framing/Rough-in | 5/1/2000 | 5/1/2000 | 5/1/2000 | A | FAIL |
Russ Owen
|
|
|
Need engineers calcs and clean plans. Also noted corrections with wall to roof connections.
|
BLD-Foundation | 3/21/2000 | 3/22/2000 | 3/22/2000 | P | PART |
Bob Archibald
|
|
|
###-#### late pm. 2&3 rows #4 horizontal.Straps being placed, no one on site.
|
BLD-Foundation | 3/22/2000 | 3/22/2000 | 3/22/2000 | A | PART |
Wes Worcester
|
|
|
Incomplete- hold downs being placed appears ok.
|
BLD-Footing | 3/17/2000 | 3/20/2000 | 3/20/2000 | A | PART |
Bob Archibald
|
|
|
###-#### as per Tim Hogland this inspection shall be done at 10 am. Early start, setbacks/soil appear OK.
|