BLD-Final | 7/13/2000 | 7/14/2000 | 7/14/2000 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 07/13/2000 at 22:39:28. Contact: ###-####.
|
BLD-Final | 7/12/2000 | 7/13/2000 | 7/13/2000 | P | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 07/12/2000 at 23:04:47. Contact: ###-####.
|
BLD-Framing/Rough-in | 6/2/2000 | 6/2/2000 | 6/2/2000 | A | PASS |
Russ Owen
|
|
|
|
BLD-Framing/Rough-in | 5/31/2000 | 6/1/2000 | 6/1/2000 | P | PART |
Russ Owen
|
|
|
Dan ###-#### Ok to cover all inside. 6/5/00 10:20:03 AM
|
BLD-Wall cover | 5/25/2000 | 5/26/2000 | 5/26/2000 | A | PART |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 05/25/2000 at 13:19:53. Contact: ###-####. OK to cover- still correction on stairs. 5/26/00 12:19:47 PM
|
BLD-Wall cover | 5/24/2000 | 5/25/2000 | 5/25/2000 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 05/24/2000 at 15:08:18. Contact: ###-####. Corrections not done, stairs/front wall HD's. 5/25/00 1:46:16 PM
|
BLD-Energy code compliance | 5/23/2000 | 5/24/2000 | 5/24/2000 | A | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 05/23/2000 at 16:14:41. Contact: ###-####. Wrong insp. 5/24/00 1:51:35 PM
|
BLD-Framing/Rough-in | 5/23/2000 | 5/24/2000 | 5/24/2000 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 05/23/2000 at 16:13:45. Contact: ###-####. C/N posted 5/24/00 1:51:31 PM
|
BLD-Wall cover | 5/23/2000 | 5/24/2000 | 5/24/2000 | P | CANC |
Russ Owen
|
|
|
###-####---CANC
|
BLD-Wall cover | 5/24/2000 | 5/24/2000 | 5/24/2000 | P | NR |
Russ Owen
|
|
|
|
BLD-Framing/Rough-in | 5/8/2000 | 5/8/2000 | 5/8/2000 | P | FAIL |
|
|
|
Scheduled by a contractor via Hello! on 05/08/2000 at 09:07:48. Contact: ###-####. shear insp only fail need eng to verify all changes with sealed drawings or letter 5/9/00 11:07:02 AM
|
BLD-Foundation | 3/24/2000 | 3/27/2000 | 3/27/2000 | A | PART |
Wes Worcester
|
|
|
wes ###-#### Incomplete rebar installation. 3/27/00 4:30:53 PM
|
BLD-Footing | 3/23/2000 | 3/23/2000 | 3/23/2000 | P | PART |
Russ Owen
|
|
|
Wes ###-#### early pm Poured before I arrived set back and work all appears ok 3/24/00 1:07:59 PM
|