BLD-Final | 5/4/2001 | 5/4/2001 | 5/4/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 5/4/2001 3:35:52 PM c/n ok...ok for c/o
|
BLD-Conference | 4/26/2001 | 4/26/2001 | 4/26/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 4/26/2001 12:25:48 PM re final, complete glazing and architecturals.
|
BLD-Conference | 4/23/2001 | 4/23/2001 | 4/23/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 4/23/2001 2:09:26 PM rec'd eng's approval letter & MTI's affidavit.... all discrepancies ok'd by eng'r
|
BLD-Conference | 4/17/2001 | 4/17/2001 | 4/17/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 4/17/2001 9:31:26 AM keep c/n, need complete glazing, etc.
|
BLD-Final | 4/11/2001 | 4/11/2001 | 4/11/2001 | P | PART |
Carl Dependahl
|
|
|
###-####;keep c/n, all items ok except fire final and ext finish/glazing; rec'd eng's letter and affidavit ok for t/o 4/11/2001 3:33:31 PM
|
FIRE-Final Inspection | 4/11/2001 | 4/11/2001 | 4/11/2001 | P | PASS |
Rick Jackson
|
|
|
Added by Inspector: 409 On 4/11/2001 6:14:37 PM final occupancy approved
|
BLD-Conference | 4/10/2001 | 4/10/2001 | 4/10/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 4/10/2001 2:49:07 PM re c/n of 4-9...add signs, labels at stair enclosure
|
BLD-Final | 4/6/2001 | 4/9/2001 | 4/9/2001 | P | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 04/06/2001 at 14:27:41. Contact: ###-####. c/n, doors at stair towers...temp rise; firestops, complete glazing at ext; need eng's affidavit 4/9/2001 6:16:54 PM
|
FIRE-Final Inspection | 4/6/2001 | 4/9/2001 | 4/9/2001 | P | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 04/06/2001 at 14:26:47. Contact: ###-####. azwaiting stairwell signs 4/9/2001 2:30:19 PM
|
FIRE-Alarm Testing | 3/28/2001 | 3/30/2001 | 3/30/2001 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 03/28/2001 at 10:10:35. Contact: ###-####. c/n issued 3/30/2001 12:48:55 PM
|
BLD-Wall cover | 3/7/2001 | 3/8/2001 | 3/8/2001 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 03/07/2001 at 14:54:40. Contact: ###-####. ok to cover hvac shaft walls...per detail. 3/8/2001 4:32:34 PM
|
FIRE-Conference | 3/7/2001 | 3/8/2001 | 3/8/2001 | P | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 03/07/2001 at 14:55:27. Contact: ###-####. requirements for ashell and core compliance 3/8/2001 2:37:44 PM
|
BLD-Conference | 3/5/2001 | 3/7/2001 | 3/7/2001 | A | PASS |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 03/05/2001 at 17:03:06. Contact: ###-####.w/proj mgr re final req's 3/7/2001 12:37:06 PM
|
BLD-Wall cover | 3/5/2001 | 3/6/2001 | 3/6/2001 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 03/05/2001 at 17:02:20. Contact: ###-####....WIP; wrap beams at shaft pe 3/6/2001 4:21:41 PM r de 3/6/2001 4:21:42 PM
|
BLD-Framing/Rough-in | 2/28/2001 | 2/28/2001 | 2/28/2001 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 2/28/2001 11:57:14 AM complete wrapping beams and firestopping at hvac shafts; wip ok to continue
|
BLD-Conference | 2/20/2001 | 2/20/2001 | 2/20/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 2/20/2001 5:31:16 PM NEED DETAIL FOR SHAFTWALL...G.A. OR??
|
BLD-Framing/Rough-in | 2/19/2001 | 2/20/2001 | 2/20/2001 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 02/19/2001 at 09:43:23. Contact: ###-####....rec'd detail for 1hr hvac shaft; ok to proceed per GA WP 7008 and assoc detail 2/21/2001 3:51:31 PM
|
BLD-Conference | 2/12/2001 | 2/13/2001 | 2/13/2001 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 02/12/2001 at 12:52:21. Contact: ###-####....keep c/n...ok to continue, add fasteners at 1hr corr. walls 2/13/2001 12:05:48 PM
|
BLD-Framing/Rough-in | 2/13/2001 | 2/13/2001 | 2/13/2001 | P | FAIL |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 2/13/2001 12:04:52 PM c/n; need detail, 1hr hvac shaft, not framed per plans as A.9 C-6 shows
|
BLD-Framing/Rough-in | 2/8/2001 | 2/8/2001 | 2/8/2001 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 2/8/2001 10:58:08 AM wip; keep c/n. complete firestopping, etc.
|
BLD-Conference | 2/6/2001 | 2/6/2001 | 2/6/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 2/6/2001 4:10:31 PM w/ supt re c/n of 1-29
|
BLD-Conference | 2/1/2001 | 2/1/2001 | 2/1/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 2/1/2001 5:01:10 PM w supt re insp reports
|
BLD-Framing/Rough-in | 1/31/2001 | 2/1/2001 | 2/1/2001 | A | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 01/31/2001 at 13:49:28. Contact: ###-####.c/n, seal stair shafts, floors. box-out beams if unable to fasten gyp to framin 2/2/2001 11:47:21 AM
|
BLD-Framing/Rough-in | 1/30/2001 | 1/31/2001 | 1/31/2001 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 01/30/2001 at 15:23:51. Contact: ###-####. fireproofing at beams at gar entry ok pend report 1/31/2001 3:39:44 PM
|
BLD-Framing/Rough-in | 1/23/2001 | 1/23/2001 | 1/23/2001 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 1/23/2001 10:42:33 AM restroom core framing ok; west & middle stairs...complete firestops/grouting at struct penetrations, rec'd spray-on f.p. reports for west/middle stairs ok
|
BLD-Framing/Rough-in | 1/22/2001 | 1/22/2001 | 1/22/2001 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 01/22/2001 at 09:01:45. Contact: ###-####. 4th fl r. rms ok 1/22/2001 4:05:08 PM
|
BLD-Other | 1/22/2001 | 1/22/2001 | 1/22/2001 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 01/22/2001 at 09:01:00. Contact: ###-####...spray-on fire proofing...pend spec insp report 1/22/2001 5:05:33 PM
|
BLD-Footing | 1/17/2001 | 1/17/2001 | 1/17/2001 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 01/17/2001 at 07:33:49. Contact: ###-####. ext landscape wall 1/17/2001 12:25:08 PM
|
BLD-Framing/Rough-in | 1/17/2001 | 1/17/2001 | 1/17/2001 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 01/17/2001 at 07:35:46. Contact: ###-####. walk thru, verified firestops at r.rm floors 1/17/2001 3:01:49 PM
|
BLD-Other | 1/8/2001 | 1/8/2001 | 1/9/2001 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 01/08/2001 at 09:25:32. Contact: ###-####. arch pop-outs at ext wall...masonry ok 1/9/2001 10:52:03 AM
|
BLD-Framing/Rough-in | 1/8/2001 | 1/8/2001 | 1/8/2001 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 01/08/2001 at 09:24:45. Contact: ###-####. int masonry walls at bsmt " lockers, 1st lift ok 1/9/2001 10:52:57 AM
|
BLD-Foundation | 12/21/2000 | 12/21/2000 | 12/21/2000 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 12/21/2000 at 09:02:34. Contact: ###-####. ftgs for arch. projections12/21/2000 3:27:10 PM 12/21/2000 3:28:36 PM
|
BLD-Other | 12/21/2000 | 12/21/2000 | 12/21/2000 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 12/21/2000 at 09:01:46. Contact: ###-####. mti onste for masonry 12/21/2000 1:32:39 PM
|
BLD-Framing/Rough-in | 12/7/2000 | 12/8/2000 | 12/8/2000 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 12/07/2000 at 16:29:38. Contact: ###-####. wip roof framing; add straps at plate breaks, clips at brg ok to continue 12/8/2000 12:15:21 PM
|
BLD-Foundation | 12/5/2000 | 12/6/2000 | 12/6/2000 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 12/05/2000 at 17:21:16. Contact: ###-####...masonry, mti onsite 12/6/2000 9:08:41 AM
|
BLD-Foundation | 12/5/2000 | 12/6/2000 | 12/6/2000 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 12/05/2000 at 17:22:03. Contact: ###-####...mti onsite, pend report 12/6/2000 4:24:10 PM
|
BLD-Footing | 12/4/2000 | 12/5/2000 | 12/5/2000 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 12/04/2000 at 09:21:59. Contact: ###-####. arch. extensions at ext wall. spec. insp onsite 12/5/2000 9:03:41 AM
|
BLD-Conference | 12/4/2000 | 12/4/2000 | 12/4/2000 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 12/04/2000 at 09:23:31. Contact: ###-####. met w/ supt. onsite re insp process 12/4/2000 4:05:12 PM
|
BLD-Framing/Rough-in | 12/4/2000 | 12/4/2000 | 12/4/2000 | P | NR |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 12/04/2000 at 09:22:45. Contact: ###-####.complete detailing, clips etc at mech penthouse and roof 12/4/2000 4:04:35 PM
|
BLD-Other | 12/4/2000 | 12/4/2000 | 12/4/2000 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 12/04/2000 at 09:24:25. Contact: ###-####.
|
BLD-Conference | 12/1/2000 | 12/1/2000 | 12/1/2000 | P | FAIL |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 12/1/2000 12:06:43 PM c/n issued re insp requests, need listings for penetrations at shfts, 3hr floor assy fireprotection, etc
|
BLD-Framing/Rough-in | 10/13/2000 | 10/13/2000 | 10/13/2000 | P | PART |
Jim Storey
|
|
|
CONTINOUS INSP-OCT 15 THROUGH DEC 15---MASONARY RE-INFORCING & BEAMS --BUCK CARPER ###-#### --SPECIAL INSP IS REQUIRED BY MTI
|
BLD-Other | 10/11/2000 | 10/11/2000 | 10/11/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/11/2000 at 07:38:16. Contact: ###-####. massonary coved w/special insp. 10/11/2000 4:43:06 PM
|
BLD-Concrete | 9/25/2000 | 9/26/2000 | 9/26/2000 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 09/25/2000 at 16:37:05. Contact: ###-####. first floor deck ok for concrete special insp. apptoved all deck attchment and studs. 9/26/2000 10:11:10 AM
|
BLD-Foundation | 9/1/2000 | 9/5/2000 | 9/5/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 09/01/2000 at 13:49:10. Contact: ###-####. with sp insp approvals 9/5/2000 10:12:22 AM
|
BLD-Footing | 8/9/2000 | 8/10/2000 | 8/10/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 08/09/2000 at 11:56:23. Contact: ###-####. 4 each col footers 1-#1 3 # 2 8/10/2000 3:12:39 PM
|
BLD-Foundation | 7/31/2000 | 8/1/2000 | 8/1/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 07/31/2000 at 11:04:06. Contact: ###-####. pending sp insp approvals 8/1/00 10:15:21 AM
|
BLD-Foundation | 7/26/2000 | 7/28/2000 | 7/28/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 07/26/2000 at 09:33:13. Contact: ###-####. pending sp insp approvals 7/28/2000 2:01:16 PM
|
BLD-Concrete | 7/26/2000 | 7/26/2000 | 7/26/2000 | P | PART |
|
|
|
Scheduled by a contractor via Hello! on 07/26/2000 at 09:32:17. Contact: ###-####. pending sp insp approvals 7/27/2000 8:22:19 AM
|
BLD-Other | 7/20/2000 | 7/24/2000 | 7/24/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 07/20/2000 at 07:56:32. Contact: ###-####. pending sp insp approv 7/24/2000 4:54:15 PM pending sp insp approvals 7/24/2000 4:54:36 PM
|
BLD-Concrete | 7/20/2000 | 7/21/2000 | 7/21/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 07/20/2000 at 07:54:11. Contact: ###-####. pending sp insp approvals 7/21/2000 2:59:06 PM
|
BLD-Other | 7/20/2000 | 7/21/2000 | 7/21/2000 | P | PART |
|
|
|
Scheduled by a contractor via Hello! on 07/20/2000 at 07:55:47. Contact: ###-####. pending sp insp approvals 7/21/2000 2:59:22 PM
|
BLD-Foundation | 7/20/2000 | 7/20/2000 | 7/20/2000 | P | PART |
|
|
|
Scheduled by a contractor via Hello! on 07/20/2000 at 07:53:26. Contact: ###-####. pending sp insp approvals 7/20/2000 5:58:43 PM
|
BLD-Other | 7/20/2000 | 7/20/2000 | 7/20/2000 | P | PART |
|
|
|
Scheduled by a contractor via Hello! on 07/20/2000 at 07:55:00. Contact: ###-####. pendingsp insp approvals 7/20/2000 5:59:15 PM
|
BLD-Other | 7/17/2000 | 7/19/2000 | 7/19/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 07/17/2000 at 08:59:32. Contact: ###-####. made ok pending sp insp approvals 7/19/2000 10:26:06 PM
|
BLD-Other | 7/17/2000 | 7/18/2000 | 7/18/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 07/17/2000 at 08:58:42. Contact: ###-####. pending sp insp approval 7/18/00 6:54:54 AM
|
BLD-Foundation | 7/13/2000 | 7/17/2000 | 7/17/2000 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 07/13/2000 at 08:29:00. Contact: ###-####.pending s/i report. 7/17/2000 11:33:48 AM
|
BLD-Foundation | 7/13/2000 | 7/14/2000 | 7/14/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 07/13/2000 at 08:28:08. Contact: ###-####. pending sp insp reports 7/14/2000 10:03:34 AM
|
BLD-Foundation | 7/13/2000 | 7/13/2000 | 7/13/2000 | P | PART |
|
|
|
Scheduled by a contractor via Hello! on 07/13/2000 at 08:27:21. Contact: ###-####. pending sp insp 7/13/2000 6:29:40 PM
|
BLD-Foundation | 7/7/2000 | 7/7/2000 | 7/7/2000 | P | PART |
|
|
|
Scheduled by a contractor via Hello! on 07/07/2000 at 08:03:09. Contact: ###-####. pending sp insp approvals 7/7/00 3:39:27 PM
|
BLD-Foundation | 7/5/2000 | 7/7/2000 | 7/6/2000 | A | CANC |
|
|
|
Scheduled by a contractor via Hello! on 07/05/2000 at 15:05:24. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 07/06/2000 at 16:54:22.
|
BLD-Concrete | 6/29/2000 | 6/30/2000 | 6/30/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 06/29/2000 at 16:18:03. Contact: ###-####. with sp insp ok.s 7/3/00 8:38:38 AM
|
BLD-Foundation | 6/28/2000 | 6/29/2000 | 6/29/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 06/28/2000 at 07:36:45. Contact: ###-####. pending sp insp aprovals 6/30/00 10:06:27 AM
|
BLD-Foundation | 6/28/2000 | 6/28/2000 | 6/28/2000 | P | PART |
|
|
|
Scheduled by a contractor via Hello! on 06/28/2000 at 07:30:56. Contact: ###-####. pending sp insp approvals 6/30/00 10:06:10 AM
|
BLD-Footing | 6/22/2000 | 6/26/2000 | 6/26/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 06/22/2000 at 15:16:56. Contact: ###-####. pending sp insp approvals 6/26/00 4:59:02 PM
|
BLD-Footing | 6/22/2000 | 6/23/2000 | 6/23/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 06/22/2000 at 15:16:08. Contact: ###-####. pending sp insp approvals 6/23/00 9:27:44 PM
|
BLD-Foundation | 6/21/2000 | 6/22/2000 | 6/22/2000 | P | PART |
|
|
|
Scheduled by a contractor via Hello! on 06/21/2000 at 17:34:39. Contact: ###-####. pending sp insp approvals 6/23/00 9:27:15 PM
|
BLD-Foundation | 6/20/2000 | 6/20/2000 | 6/20/2000 | P | PART |
|
|
|
Scheduled by a contractor via Hello! on 06/20/2000 at 07:52:19. Contact: ###-####. sp insp approval req 6/21/00 10:08:26 AM
|
BLD-Foundation | 6/19/2000 | 6/19/2000 | 6/19/2000 | P | PART |
|
|
|
Scheduled by a contractor via Hello! on 06/19/2000 at 09:09:14. Contact: ###-####. for levator wall horiz bond beam 6/19/00 3:00:27 PM
|
BLD-Footing | 6/15/2000 | 6/16/2000 | 6/16/2000 | P | PART |
|
|
|
Scheduled by a contractor via Hello! on 06/15/2000 at 16:49:03. Contact: ###-####. with sp insp approvals 6/19/00 6:43:35 AM
|
BLD-Footing | 6/14/2000 | 6/15/2000 | 6/15/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 06/14/2000 at 16:52:31. Contact: ###-####. eng to submit on corner lap brs at 24'" transitions at the south wall 6/16/00 11:39:09 AM
|
BLD-Foundation | 6/13/2000 | 6/13/2000 | 6/13/2000 | P | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 06/13/2000 at 08:16:00. Contact: ###-####. out of time covered with special. 6/13/00 1:44:04 PM
|
BLD-Footing | 6/8/2000 | 6/9/2000 | 6/9/2000 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 06/08/2000 at 16:34:07. Contact: ###-####.
|
BLD-Footing | 6/8/2000 | 6/9/2000 | 6/9/2000 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 06/08/2000 at 16:34:07. Contact: ###-####.
|
BLD-Footing | 6/8/2000 | 6/8/2000 | 6/8/2000 | P | CANC |
|
|
|
Scheduled by a contractor via Hello! on 06/08/2000 at 08:54:50. Contact: ###-####. canc by ctr 6/8/00 5:14:02 PM
|
BLD-Foundation | 6/2/2000 | 6/2/2000 | 6/2/2000 | P | PART |
|
|
|
Scheduled by a contractor via Hello! on 06/02/2000 at 11:26:51. Contact: ###-####.
6/2/00 4:15:39 PM MADE OK WITH THE SP INSP APPRVALS MOST FORMS SET R-BAR IS PLACED 6/5/00 10:50:59 AM
|
BLD-Concrete | 5/31/2000 | 5/31/2000 | 5/31/2000 | A | FAIL |
|
|
|
Added by Inspector: 338 On 5/31/00 r-bar not placed yet all new work is much better than prior set up area
|
BLD-Footing | 5/26/2000 | 5/31/2000 | 5/31/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 05/26/2000 at 14:55:36. Contact: ###-####. a-line-4.2 thru 12 line and 12 line a through e/5...with sp isp blessing 5/31/00 10:54:32 AM
|
BLD-Footing | 5/22/2000 | 5/23/2000 | 5/23/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 05/22/2000 at 14:58:56. Contact: . pending sp inspreport, pouring without isp when sp insp is required, I misunderstood pour time from phone conversation. there was no contact fromthecontr and started to pour w/o my aprovald...very poor r-bar placement ther is a lot of bar out of place b ecause of this5/23/00 3:16:01 PM 5/23/00 3:16:33 PM
|
BLD-Foundation | 6/13/2000 | 6/14/2000 | 5/14/2000 | P | PART |
|
|
|
made pending sp insp approvalsScheduled by a contractor via Hello! on 06/13/2000 at 08:16:50. Contact: ###-####.
|