Permit Information
Permit NumberBLD00-00601
StatusFinaled
Name PINNACLE ENGINEERS INC
Site Address 12552 W EXECUTIVE DR
Project NamePINNACLE ENGINEERS
Customer Number 
ePlanReviewNo
Description
PINNACLE ENGINEERS, INC. (SHELL & CORE BUILDING) - TO CONSTRUCT A NEW 11,700 SQ. FT., TWO STORY SHELL AND CORE BUILDING. BUILT OF CONCRETE TILT-UP EXTERIOR WALLS, METAL FLOOR AND ROOF FRAMING WITH CONCRETE FLOOR SYSTEM. THIS BUILDING IS FULLY FIRE SPRINKLED. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED COMMENT LIST. THIS IS A SHELL AND CORE BUILDING PERMIT ONLY, NO OCCUPANCY IS ALLOWED UNDER THIS PERMIT. A SEPARATE TENANT IMPROVEMENT PERMIT IS REQUIRED TO FINISH THIS BUILDING FOR OCCUPANCY. DRH99-00268/CUP99-00159/00-180/JCM GRADING PERMIT BLD00-00606
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/30/200010/31/200010/31/2000APASS
DetailsCarl Dependahl
FN OCC- ###-####- JIM
BLD-Final10/30/200010/30/200010/30/2000PNR
DetailsCarl Dependahl
JIm ###-####
BLD-Final10/27/200010/27/200010/27/2000PNR
DetailsTom Arcoraci
###-#### needs achd sig and eng letter of accep 10/27/2000 5:25:32 PM
FIRE-Final Inspection10/27/200010/27/200010/27/2000PPASS
DetailsJoe Tawney
###-#### Reinsp OK for permanant occupancy 10/30/2000 8:08:05 AM
BLD-Final10/26/200010/26/200010/26/2000PNR
DetailsTom Arcoraci
Jim ###-#### -fire is also going out needs eng letter of acceptance 10/26/2000 2:57:14 PM
FIRE-Final Inspection10/26/200010/26/200010/26/2000PFAIL
DetailsJoe Tawney
Jim ###-#### Final Fail C/N issued 10/27/2000 7:54:19 AM
BLD-Framing/Rough-in10/23/200010/23/200010/23/2000PPART
DetailsCarl Dependahl
CEILING GRID 1ST & 2ND FLOOR --JIM ###-####
BLD-Conference10/9/200010/9/200010/9/2000PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 10/9/2000 w/ Jim of Van Auker re arch's letter for shaft deletion
BLD-Framing/Rough-in9/18/20009/20/20009/20/2000PPART
DetailsTom Arcoraci
Jim ###-#### ok to 1st floor int and mech shat walls elev needs insp ofwalls 9/20/2000 4:09:28 PM
BLD-Framing/Rough-in9/8/20009/11/20009/11/2000APASS
DetailsTom Arcoraci
Jim ###-#### 2nd floor framing 9/11/2000 12:05:44 PM ok to cover 2nd floor walls only 9/11/2000 12:06:13 PM
BLD-Framing/Rough-in9/7/20009/7/20009/7/2000PNR
DetailsCarl Dependahl
JIM ###-#### FR ; need arch's detail for s 9/7/2000 4:16:21 PM haft/ dampers etc...incomplete info on city set 9/7/2000 4:17:06 PM
BLD-Framing/Rough-in8/1/20008/2/20008/2/2000APART
DetailsCarl Dependahl
###-#### structural welding; Strata onsite, pending reports. 8/2/2000 8:18:55 AM
BLD-Framing/Rough-in7/20/20007/21/20007/21/2000APART
DetailsCarl Dependahl
welding insp-- jim-- ###-####; pending report from strata 7/21/2000 8:44:27 AM
BLD-Foundation7/5/20007/6/20007/6/2000APART
DetailsCarl Dependahl
Jim ###-#### Tilt-up panels- pending report. 7/7/00 1:33:32 PM
BLD-Concrete6/19/20006/20/20006/20/2000APART
DetailsCarl Dependahl
FLOOR SLAB ###-#### Pend. sp. insp. reports. WIP 6/21/00 11:40:01 AM
BLD-Foundation6/12/20006/12/20006/12/2000PPART
DetailsAlan Hauser
###-#### jIM SPECIAL INSPECTION
BLD-Footing6/9/20006/9/20006/9/2000PPART
DetailsRuss Owen
jim ###-#### s-i pending report 6/13/00 10:08:27 AM
BLD-Footing6/7/20006/8/20006/8/2000APART
DetailsTom Arcoraci
jim ###-#### SPECIAL INSPECTION
BLD-Footing6/5/20006/6/20006/6/2000APART
DetailsAlan Hauser
jim ###-#### Special inspection 6/6/00 2:06:08 PM
FIRE-Final Inspection5/30/20005/31/20005/31/2000APART
DetailsJoe Tawney
###-#### Ok on supply line cover. 5/31/00 4:31:54 PM