BLD-Final | 8/31/2001 | 9/4/2001 | 9/4/2001 | A | PASS |
Carl Dependahl
|
|
|
FN OCC- WALT-- ###-####, c/n ok, ok for final, Walt has card ? 9/4/2001 11:45:56 AM
|
BLD-Final | 8/20/2001 | 8/20/2001 | 8/20/2001 | P | PASS |
Carl Dependahl
|
|
|
WALT ###-#### FN
|
BLD-Conference | 6/14/2001 | 6/14/2001 | 6/14/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 6/14/2001 9:56:36 AM w/Earl; need all finals prior to occupancy.
|
BLD-Final | 6/14/2001 | 6/14/2001 | 6/14/2001 | P | NR |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 6/14/2001 2:25:04 PM recall when other finals complete
|
FIRE-Final Inspection | 6/6/2001 | 6/6/2001 | 6/6/2001 | P | PASS |
Rick Jackson
|
|
|
reinspection ###-####
|
FIRE-Final Inspection | 5/31/2001 | 6/1/2001 | 6/1/2001 | A | FAIL |
Rick Jackson
|
|
|
Lori ###-#### main entry/exit locks; fire extinguishers 6/1/2001 10:20:47 AM
|
BLD-Conference | 4/26/2001 | 4/26/2001 | 4/26/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 4/26/2001 4:50:52 PM w/ cont. re rest rm walls...epoxy paint or equal ok
|
BLD-Conference | 3/27/2001 | 3/27/2001 | 3/27/2001 | P | PART |
Tom Arcoraci
|
|
|
###-####\\conf only handrail ext conf need app plans for detail to meet cabo ansi 3/27/2001 1:42:21 PM
|
BLD-Framing/Rough-in | 3/14/2001 | 3/15/2001 | 3/15/2001 | A | PART |
Carl Dependahl
|
|
|
framing in the basement Lori ###-####..ok to cover 3/15/2001 10:46:58 AM
|
BLD-Framing/Rough-in | 3/8/2001 | 3/9/2001 | 3/9/2001 | A | PART |
Carl Dependahl
|
|
|
FR INSP --WALT-- ###-#### ok to cover except bsmt... 3/9/2001 11:18:06 AM
|
BLD-Conference | 3/7/2001 | 3/7/2001 | 3/7/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 3/7/2001 4:58:08 PM w/ Lynn Brown & bldr at site re c/n...wip
|
BLD-Framing/Rough-in | 3/6/2001 | 3/6/2001 | 3/6/2001 | P | PART |
Carl Dependahl
|
|
|
Walt ###-#### ok to cover 1st fl and bsmt; keep c/n re 1hr walls at stairs,complete draft stop, etc. 3/6/2001 6:37:26 PM
|
BLD-Framing/Rough-in | 2/27/2001 | 2/28/2001 | 2/28/2001 | P | PART |
Carl Dependahl
|
|
|
###-####ok to insul ext walls, c/n re shear walls ; no trusses insp'd2/28/2001 4:44:36 PM 2/28/2001 4:47:48 PM
|
BLD-Conference | 11/7/2000 | 11/7/2000 | 11/7/2000 | P | PASS |
Jim Storey
|
|
|
FOR CONF-- WARREN-- ###-#### need nail to stapple converition. 11/7/2000 3:27:36 PM
|
BLD-Foundation | 10/18/2000 | 10/19/2000 | 10/19/2000 | A | PASS |
Jim Storey
|
|
|
FOUND WALL STEVE ###-####
|
BLD-Footing | 10/17/2000 | 10/17/2000 | 10/17/2000 | P | PASS |
Jim Storey
|
|
|
ft insp robert ###-#### pending soil report. 10/17/2000 3:22:55 PM
|
BLD-Foundation | 9/21/2000 | 9/21/2000 | 9/21/2000 | P | PART |
Jim Storey
|
|
|
###-#### basement walls ok 9/21/2000 1:46:37 PM
|
BLD-Conference | 9/18/2000 | 9/18/2000 | 9/18/2000 | P | FAIL |
|
|
|
Scheduled by a contractor via Hello! on 09/18/2000 at 11:24:00. Contact: ###-####. must submit plans to the plans review dept, per 325 9/19/2000 9:58:12 AM
|
BLD-Footing | 9/7/2000 | 9/8/2000 | 9/8/2000 | A | PART |
|
|
|
Dave ###-#### ok to pour perimiter footers need details for th interior bearing footers for the two stairways leftmessage with the arch lynn brown 9/8/2000 10:49:50 AM
|