BLD-Final | 3/5/2002 | 3/5/2002 | 3/5/2002 | P | PASS |
Dave Hannah
|
|
|
###-####
|
BLD-Final | 11/1/2001 | 11/2/2001 | 11/2/2001 | P | PART |
Dave Hannah
|
|
|
###-#### ok to final after public works signs off per occ 11/2/2001 4:07:53 PM
|
FIRE-Final Inspection | 11/1/2001 | 11/2/2001 | 11/2/2001 | A | PASS |
Troy Cobbley
|
|
|
Fire/life safety OK 11/2/2001 9:28:22 AM
|
FIRE-Final Inspection | 11/1/2001 | 11/1/2001 | 11/1/2001 | P | FAIL |
Troy Cobbley
|
|
|
tim- ###-####-- Contractor to remove hardware from inner doors of weather vestible and install Fire Lane sign at entrance 11/1/2001 11:41:27 AM
|
BLD-Framing/Rough-in | 12/21/2000 | 12/21/2000 | 12/21/2000 | P | PASS |
Dave Hannah
|
|
|
shear Brian ###-#### need engineering for two hold downs one se one nw corner of bldg ok to cover if they use a inter type hold down 12/21/2000 1:31:30 PM
|
BLD-Foundation | 5/8/2000 | 5/8/2000 | 5/8/2000 | P | PART |
Carl Dependahl
|
|
|
###-#### Found walls; hold downs "wet-set" as brick ledge installed. 5/9/00 11:31:18 AM
|
BLD-Footing | 5/4/2000 | 5/4/2000 | 5/4/2000 | P | PART |
|
|
|
ready at 3pm ###-#### done by 316 5/4/00 6:19:17 PM
|
BLD-Footing | 5/4/2000 | 5/4/2000 | 5/4/2000 | P | PART |
Jim Sly
|
|
|
Footing appears ok.
|
BLD-Footing | 5/3/2000 | 5/3/2000 | 5/3/2000 | P | CANC |
Tom Arcoraci
|
|
|
brian ###-#### ft Not ready 5/4/00 11:40:23 AM
|