Permit NumberBLD00-00758
StatusFinaled
Name STOLTZ MARKETING GROUP
Site Address 611 -615 W MAIN ST
Project Name 
Customer Number 
ePlanReviewNo
Description
To remodel an existing 2 story building along with paving of parking on the south side of building off alley per approved plans on file and DRH00-00019. NOTE: THIS BUILDING HAS BEEN REVIEWED UNDER THE 1997 UNIFORM CODE FOR THE ABATEMENT OF DANGEROUS BUILDINGS TO DETERMINE THE ABILITY OF THE EXISTING STRUCTURE TO RESIST LATERAL SEISMIC FORCES PER 1997 UBC AND 1994 UCBC. STRUCTURAL PLANS & CALCULATIONS FOR STRUCTURAL RETROFIT ARE PART OF A DEFERRED SUBMITTAL PACKAGE THAT SHALL BE PRESENTED, REVIEWED AND APPROVED BEFORE ANY RETROFIT STRUCTURAL WORK IS DONE. THIS PERMIT SERVES NOTICE TO THE ARCHITECT, OWNER & CONTRACTOR THAT WORK DONE PRIOR TO THE SUBMITTAL AND APPROVAL OF THE RETROFIT PLANS IS DONE AT THEIR OWN RISK. ANY CORRECTIONS REQUIRED OF WORK ALLREADY DONE SHALL BE MADE, INSPECTED AND APPROVED BEFORE COVERING ANY FRAMING. THERE IS NO QUARANTEE RETROFIT UPGRADES WILL BE APPROVED. THIRD PARTY STRUCTURAL PEER REVIEW IS REQUIRED. ALL RETROFIT UPGRADES SHALL BE COMPLETED & APPROVED BEFORE ANY OCCUPANCY OR USE OF TENANT SPACE(S) IS ALLOWED. Remodel of the 6,046 s.f. building includes a tenant improvment of 2nd floor, 3,147 sq. ft. (368s.f. mezz.) for office use by Stoltz Marketing Group as a part of this permit. The 2,306 s.f. of leasable area on the first floor is for future tenants and will require separate applications, plans & permits for occupancy. Permit includes two FULLY ACCESSIBLE common use restrooms on 1st floor. Basement to be closed off and converted to mechanical crawl space only, with access floor panels. Work to include construction of new interior stairways to access second floor and mezzanine; interior non-bearing walls to create new office's, library/small conf. and conference rooms; new suspended ceiling assembly in conference room and repair of others as needed; new attic access', guardrails, handrails, glazing; electrical, plumbing & mechanical upgrades all per approved plans, notes & attached plan review comments issued as part of permitting process. (P.C.#206-00)/drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/3/20014/3/20014/3/2001PPASS
DetailsCarl Dependahl
###-####; seismic upgrade ok, rec'd eng's "observation" report, 4/3/2001 3:51:19 PM
Permanent Occupancy 4/3/20014/3/2001 DONE
Details
BLD-Conference3/23/20013/23/20013/23/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 3/23/2001 11:41:43 AM w/ R2H eng's....Robert; keep c/n, need report.
BLD-Final3/20/20013/20/20013/20/2001PFAIL
DetailsCarl Dependahl
Harry ###-####; keep c/n need stamped eng'r's observation; fix rear door threshhold...too high 3/20/2001 4:15:00 PM 3/20/2001 4:16:25 PM
FIRE-Final Inspection3/13/20013/14/20013/14/2001APASS
DetailsRick Jackson
###-####
BLD-Conference3/12/20013/12/20013/12/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 3/12/2001 9:14:46 AM need all finals for t/i
BLD-Conference3/9/20013/9/20013/9/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 3/9/2001 11:00:33 AM need all trades finalled...Cathy has 45 day notice
BLD-Conference3/9/20013/9/20013/9/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 3/9/2001 11:00:33 AM need all trades finalled...Cathy has 45 day notice
BLD-Conference3/1/20013/1/20013/1/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 3/1/2001 9:22:59 AM w/ supt.
BLD-Conference2/27/20012/27/20012/27/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 2/27/2001 9:42:54 AM w/ owner re eng's letter...struct observation report req'd
BLD-Conference2/13/20012/13/20012/13/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 2/13/2001 9:18:01 AM w/bldr...need complete observation report, stamped
BLD-Conference2/13/20012/13/20012/13/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 2/13/2001 5:20:28 PM w/ owner, need stamped eng's letter
BLD-Conference2/13/20012/13/20012/13/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 2/13/2001 5:20:28 PM w/ owner, need stamped eng's letter
BLD-Final1/17/20011/17/20011/17/2001PFAIL
DetailsCarl Dependahl
temp occ Perry ###-#### c/n, rails, other finals, glazing, ok for t/o. 1/17/2001 2:59:33 PM
FIRE-Final Inspection1/15/20011/16/20011/16/2001APART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 01/15/2001 at 16:13:06. Contact: ###-####. temp approved for 2nd floor use. exiting okay - deadbolt from rear removed 1/16/2001 3:36:52 PM
BLD-Framing/Rough-in12/8/200012/11/200012/11/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/08/2000 at 12:52:26. Contact: ###-####. mez. joist ok per engineering on site. 12/11/2000 2:19:34 PM
BLD-Concrete12/5/200012/5/200012/5/2000PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 12/5/2000 4:59:44 PM mti onsite
BLD-Footing11/30/200012/1/200012/1/2000PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 11/30/2000 at 11:43:46. Contact: ###-####. reconfiguration of bar at front ok per eng. mti onsite 12/1/2000 3:50:09 PM
BLD-Framing/Rough-in11/30/200011/30/200011/30/2000PPART
DetailsJim Storey
HARRY ###-#### ft work in progess. framing 2 nd floor roof ceilling ok for cover letter of observation on site. shaft verified to be complet. rfi requisted for post strap nailling 16 d nails used 10 d nails. pending responce. letter copy to be sent on strucrual observation of roof to be sent to dan stuart. 11/30/2000 2:28:40 PM
BLD-Footing11/27/200011/28/200011/28/2000APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 11/27/2000 at 13:10:09. Contact: ###-####.need eng's ok for reconfigured rebar at entry... spec insp onsite 11/28/2000 8:56:38 AM
BLD-Concrete11/27/200011/27/200011/27/2000PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 11/27/2000 1:31:55 PM mti onsite...ftgs at entry
BLD-Footing8/24/20008/24/20008/24/2000PPART
Details
Perry ###-#### ok to pour the lower footings all but the front 8/25/2000 9:59:52 AM
BLD-Footing8/24/20008/24/20008/24/2000PPART
Details
Perry ###-#### ok to pour the lower footings all but the front 8/25/2000 9:59:52 AM
BLD-Footing8/22/20008/23/20008/23/2000PPART
Details
Scheduled by a contractor via Hello! on 08/22/2000 at 15:16:22. Contact: ###-####. with r-bar adjustmend 8/24/2000 9:46:10 AM
BLD-Framing/Rough-in7/25/20007/26/20007/26/2000AFAIL
Details
Scheduled by a contractor via Hello! on 07/25/2000 at 14:24:48. Contact: ###-####. not ready for inspection; went with drs to jobsite to meet ctr. they had questions on the sandstone footing that is not shown on the plans, we directed the ctr to get with the arch. to have them get the eng on site to do a proper evaluation of same. also informed the ctr that the ctr cannot retain the special inspector, that it had to be done by the eng, arch, of record in representation of the owner. 7/26/00 11:11:59 AM