BLD-Final | 4/3/2001 | 4/3/2001 | 4/3/2001 | P | PASS |
Carl Dependahl
|
|
|
###-####; seismic upgrade ok, rec'd eng's "observation" report, 4/3/2001 3:51:19 PM
|
Permanent Occupancy | | 4/3/2001 | 4/3/2001 | | DONE |
|
|
|
|
BLD-Conference | 3/23/2001 | 3/23/2001 | 3/23/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 3/23/2001 11:41:43 AM w/ R2H eng's....Robert; keep c/n, need report.
|
BLD-Final | 3/20/2001 | 3/20/2001 | 3/20/2001 | P | FAIL |
Carl Dependahl
|
|
|
Harry ###-####; keep c/n need stamped eng'r's observation; fix rear door threshhold...too high 3/20/2001 4:15:00 PM 3/20/2001 4:16:25 PM
|
FIRE-Final Inspection | 3/13/2001 | 3/14/2001 | 3/14/2001 | A | PASS |
Rick Jackson
|
|
|
###-####
|
BLD-Conference | 3/12/2001 | 3/12/2001 | 3/12/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 3/12/2001 9:14:46 AM need all finals for t/i
|
BLD-Conference | 3/9/2001 | 3/9/2001 | 3/9/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 3/9/2001 11:00:33 AM need all trades finalled...Cathy has 45 day notice
|
BLD-Conference | 3/9/2001 | 3/9/2001 | 3/9/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 3/9/2001 11:00:33 AM need all trades finalled...Cathy has 45 day notice
|
BLD-Conference | 3/1/2001 | 3/1/2001 | 3/1/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 3/1/2001 9:22:59 AM w/ supt.
|
BLD-Conference | 2/27/2001 | 2/27/2001 | 2/27/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 2/27/2001 9:42:54 AM w/ owner re eng's letter...struct observation report req'd
|
BLD-Conference | 2/13/2001 | 2/13/2001 | 2/13/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 2/13/2001 9:18:01 AM w/bldr...need complete observation report, stamped
|
BLD-Conference | 2/13/2001 | 2/13/2001 | 2/13/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 2/13/2001 5:20:28 PM w/ owner, need stamped eng's letter
|
BLD-Conference | 2/13/2001 | 2/13/2001 | 2/13/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 2/13/2001 5:20:28 PM w/ owner, need stamped eng's letter
|
BLD-Final | 1/17/2001 | 1/17/2001 | 1/17/2001 | P | FAIL |
Carl Dependahl
|
|
|
temp occ Perry ###-#### c/n, rails, other finals, glazing, ok for t/o. 1/17/2001 2:59:33 PM
|
FIRE-Final Inspection | 1/15/2001 | 1/16/2001 | 1/16/2001 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 01/15/2001 at 16:13:06. Contact: ###-####. temp approved for 2nd floor use. exiting okay - deadbolt from rear removed 1/16/2001 3:36:52 PM
|
BLD-Framing/Rough-in | 12/8/2000 | 12/11/2000 | 12/11/2000 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/08/2000 at 12:52:26. Contact: ###-####. mez. joist ok per engineering on site. 12/11/2000 2:19:34 PM
|
BLD-Concrete | 12/5/2000 | 12/5/2000 | 12/5/2000 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 12/5/2000 4:59:44 PM mti onsite
|
BLD-Footing | 11/30/2000 | 12/1/2000 | 12/1/2000 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 11/30/2000 at 11:43:46. Contact: ###-####. reconfiguration of bar at front ok per eng. mti onsite 12/1/2000 3:50:09 PM
|
BLD-Framing/Rough-in | 11/30/2000 | 11/30/2000 | 11/30/2000 | P | PART |
Jim Storey
|
|
|
HARRY ###-#### ft work in progess. framing 2 nd floor roof ceilling ok for cover letter of observation on site. shaft verified to be complet. rfi requisted for post strap nailling 16 d nails used 10 d nails. pending responce. letter copy to be sent on strucrual observation of roof to be sent to dan stuart. 11/30/2000 2:28:40 PM
|
BLD-Footing | 11/27/2000 | 11/28/2000 | 11/28/2000 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 11/27/2000 at 13:10:09. Contact: ###-####.need eng's ok for reconfigured rebar at entry... spec insp onsite 11/28/2000 8:56:38 AM
|
BLD-Concrete | 11/27/2000 | 11/27/2000 | 11/27/2000 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 11/27/2000 1:31:55 PM mti onsite...ftgs at entry
|
BLD-Footing | 8/24/2000 | 8/24/2000 | 8/24/2000 | P | PART |
|
|
|
Perry ###-#### ok to pour the lower footings all but the front 8/25/2000 9:59:52 AM
|
BLD-Footing | 8/24/2000 | 8/24/2000 | 8/24/2000 | P | PART |
|
|
|
Perry ###-#### ok to pour the lower footings all but the front 8/25/2000 9:59:52 AM
|
BLD-Footing | 8/22/2000 | 8/23/2000 | 8/23/2000 | P | PART |
|
|
|
Scheduled by a contractor via Hello! on 08/22/2000 at 15:16:22. Contact: ###-####. with r-bar adjustmend 8/24/2000 9:46:10 AM
|
BLD-Framing/Rough-in | 7/25/2000 | 7/26/2000 | 7/26/2000 | A | FAIL |
|
|
|
Scheduled by a contractor via Hello! on 07/25/2000 at 14:24:48. Contact: ###-####. not ready for inspection; went with drs to jobsite to meet ctr. they had questions on the sandstone footing that is not shown on the plans, we directed the ctr to get with the arch. to have them get the eng on site to do a proper evaluation of same. also informed the ctr that the ctr cannot retain the special inspector, that it had to be done by the eng, arch, of record in representation of the owner. 7/26/00 11:11:59 AM
|