BLD-Final | 4/9/2002 | 4/10/2002 | 4/10/2002 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 04/09/2002 at 12:39:15. Contact: ###-####. pending plm/ hand rail to basement needs returns. 4/10/2002 2:15:21 PM
|
Code Occupancy Approval | 3/6/2002 | 3/6/2002 | 3/6/2002 | P | FAIL |
Wm. Michael Meloy
|
|
|
Scheduled by Inspector: WMM On 3/6/2002 1:13:28 PM Inspection noted that the landscaping had been removed and not replaced, therefore, it had not been maintained in a healthy manner. 3/6/2002 2:42:44 PM
|
FIRE-Final Inspection | 3/6/2002 | 3/6/2002 | 3/6/2002 | P | PASS |
Rick Jackson
|
|
|
###-#### STEVE will have key lock on front door for structural, has thumb turn now 3/6/2002 1:26:20 PM
|
BLD-Framing/Rough-in | 2/20/2001 | 2/22/2001 | 2/22/2001 | A | FAIL |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 02/20/2001 at 12:33:11. Contact: ###-####. needs mech insp left cn to fire stop supply lines at ceiling 2/22/2001 11:18:49 AM
|
BLD-Concrete | 8/17/2000 | 8/18/2000 | 8/18/2000 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 08/17/2000 at 13:22:03. Contact: ###-####. rebar ok on ramp. 8/18/2000 2:33:44 PM
|
BLD-Footing | 8/1/2000 | 8/2/2000 | 8/2/2000 | A | PASS |
Jim Storey
|
|
|
STEVE BARRY-- ###-#### FT --FOR HANDICAP
|