Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD00-01050
StatusFinaled
Name HEWLETT-PACKARD ATT: OLGA
Site Address 11311 W CHINDEN BLVD
Project NameHP #5 - UPGRADE(PHASE III)
Customer Number 
ePlanReviewNo
Description
HEWLETT PACKARD BUILDING 5-UPGRADE (PHASE III) * THE COMPLETE UPGRADE OF FIRST FLOOR; ADD A SERVER EQUIPMENT ROOM ON THE WEST MECHANICAL MEZZANINE; FOUR NEW VERTICAL MECHANICAL SHAFTS FROM THE MEZZANINES UP THROUGH THE ROOF; CONSTRUCT MECHANICAL EQUIPMENT SCREEN WALL'S ON THE ROOF ADJACENT TO THE NEW SHAFTS & NEW ACCESS DOORS TO SHAFT & MECHANICAL WELL; TO ADD TO EXISTING STAIRWELL STRUCTURE AT ROOF ACCESS; INSTALL NEW STRUCTURAL SUPPORTS, MECHANICAL EQUIPMENT; RAISED NON-COMBUSTIBLE FLOOR SYSTEM, RAMPS, OFFICE CUBICLE'S, INTERIOR FINISH & UPGRADES, ELECTRICAL, MECHANICAL, PLUMBING, SPRINKLER & ALARM SYSTEMS UPGRADES AND EXIT SYSTEM UPGRADES. ALL PER THE APPROVED PLANS, NOTES & ATTACHMENTS THERE TO. DR#00-00002; CUP99-00134; PC#00-283 / drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/6/20019/6/20019/6/2001APASS
DetailsJoe Tawney
Added by Inspector: 406 On 9/6/2001 8:32:34 AM Reinsp OK for permanant occupancy
BLD-Final3/28/20013/28/20013/28/2001APART
DetailsTom Arcoraci
Added by Inspector: 408 On 3/28/2001 10:54:21 AM ok for temp occ need final eng letter of app and smoke door app 3/28/2001 10:55:46 AM
FIRE-Final Inspection3/21/20013/22/20013/22/2001PPART
DetailsJoe Tawney
Reinsp OK for temporary occupancy 3/23/2001 8:19:44 AM
FIRE-Final Inspection3/14/20013/15/20013/15/2001AFAIL
DetailsJoe Tawney
Final Fail C/N issued 3/15/2001 1:10:52 PM
BLD-Final3/13/20013/14/20013/14/2001ACANC
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 03/13/2001 at 10:38:38. Contact: ###-####.
FIRE-Final Inspection3/13/20013/14/20013/14/2001APART
DetailsJoe Tawney
Conf with contr reg Bldg #5 temp occ 3/14/2001 12:31:48 PM
BLD-Other1/22/20011/22/20011/22/2001APASS
DetailsTom Arcoraci
Added by Inspector: 408 On 1/22/2001 10:46:40 AM wip for muti permits 1/22/2001 10:47:51 AM
BLD-Conference1/8/20011/9/20011/9/2001ACANC
DetailsCarl Dependahl
Scheduled by Inspector: 408 On 1/8/2001 9:26:22 AM , cancel per 408 1/9/2001 11:10:49 AM
BLD-Framing/Rough-in9/12/200012/26/200012/26/2000ANR
DetailsJim Storey
David ###-#### walked job dave did not know who called in for insp. and had no work to be insp. shaft not complet. 12/26/2000 9:18:58 AM
BLD-Framing/Rough-in9/12/200012/19/200012/19/2000APART
DetailsTom Arcoraci
David ###-#### wip 12/20/2000 5:29:19 PM
BLD-Framing/Rough-in9/12/200012/19/200012/19/2000APART
DetailsTom Arcoraci
David ###-#### wip 12/20/2000 5:29:19 PM
BLD-Framing/Rough-in9/12/200012/12/200012/12/2000ACANC
DetailsTom Arcoraci
David ###-####
BLD-Framing/Rough-in9/12/200012/5/200012/5/2000APASS
DetailsTom Arcoraci
David ###-#### wip 12/5/2000 8:40:41 AM
BLD-Conference12/1/200012/4/200012/4/2000APASS
DetailsTom Arcoraci
Scheduled by Inspector: 408 On 12/1/2000 8:31:10 AM
BLD-Framing/Rough-in9/12/200011/28/200011/28/2000APART
DetailsTom Arcoraci
David ###-####
BLD-Framing/Rough-in9/12/200011/21/200011/21/2000APART
DetailsTom Arcoraci
###-#### David wip grid in base ok 11/21/2000 2:58:18 PM
BLD-Framing/Rough-in9/12/200011/14/200011/14/2000ACANC
DetailsTom Arcoraci
###-#### David
BLD-Framing/Rough-in9/12/200011/7/200011/7/2000APART
DetailsTom Arcoraci
David ###-#### wip 11/7/2000 2:59:22 PM
BLD-Framing/Rough-in9/12/200010/31/200010/31/2000APART
DetailsTom Arcoraci
###-#### David wip conf 10/31/2000 11:15:14 AM
BLD-Framing/Rough-in9/12/200010/24/200010/24/2000ACANC
DetailsTom Arcoraci
David ###-#### 10/25/2000 10:44:23 AM will recall 10/26/2000 8:11:38 AM
BLD-Framing/Rough-in9/12/200010/17/200010/17/2000APART
DetailsTom Arcoraci
David ###-#### wip 10/17/2000 4:40:46 PM
BLD-Framing/Rough-in9/12/200010/10/200010/10/2000ACANC
DetailsTom Arcoraci
###-####
BLD-Framing/Rough-in9/12/200010/3/200010/3/2000APART
DetailsTom Arcoraci
David ###-#### wip ok 10/3/2000 11:47:41 AM
BLD-Framing/Rough-in9/12/20009/26/20009/26/2000APART
DetailsTom Arcoraci
David ###-#### cn posted for 2 hr floor pents 9/26/2000 12:29:06 PM
BLD-Framing/Rough-in9/12/20009/19/20009/19/2000APART
DetailsTom Arcoraci
David ###-#### model room in basesment 9/19/2000 12:18:58 PM
BLD-Conference9/14/20009/15/20009/15/2000APASS
DetailsTom Arcoraci
Dan Haze ###-#### or ###-#### before 11:00 am conf on temp occ for model room 9/15/2000 10:47:34 AM
FIRE-Conference9/14/20009/15/20009/15/2000APART
DetailsJoe Tawney
Dan Haze ###-#### or ###-#### Conf on temp occ of part of bldg #5 basement 9/15/2000 12:14:25 PM
BLD-Framing/Rough-in9/11/20009/11/20009/11/2000PPART
DetailsTom Arcoraci
###-#### david 9/11/2000 2:47:04 PM ok to cover corridor walls and ac shafts 9/11/2000 2:48:09 PM
BLD-Framing/Rough-in8/15/20008/16/20008/16/2000AFAIL
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 08/15/2000 at 11:52:45. Contact: ###-####. cn posted on shfts 8/16/2000 1:29:18 PM