BLD-Final | 7/20/2001 | 7/20/2001 | 7/20/2001 | P | PASS |
Tony Young
|
|
|
###-####
concrete is done, 7/20/2001 2:54:34 PM
|
BLD-Final | 6/28/2001 | 6/29/2001 | 6/29/2001 | A | PART |
Steven Webb
|
|
|
Scott ###-#### please call Temporary C. of C. #20446 issued--good for 30 days--expires 7-29-01. Contractor to re-schedule final -- inspector to verify hard driveway at this time and re-issue new c. of c. 6/29/2001 10:08:01 AM
|
BLD-Wall cover | 11/17/2000 | 11/20/2000 | 11/20/2000 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 11/17/2000 at 18:24:00. Contact: . ok to cover. 11/20/2000 10:11:45 AM
|
BLD-Framing/Rough-in | 11/17/2000 | 11/17/2000 | 11/17/2000 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 11/17/2000 at 07:10:30. Contact: .left c/n to remove foam insulation from vent pipe of gas log unit. 11/17/2000 3:19:48 PMalso called framer. 11/17/2000 3:23:04 PM
|
BLD-Framing/Rough-in | 11/15/2000 | 11/16/2000 | 11/16/2000 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 11/15/2000 at 14:04:58. Contact: ###-####.
|
BLD-Framing/Rough-in | 11/13/2000 | 11/14/2000 | 11/14/2000 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 11/13/2000 at 11:49:35. Contact: ###-####.c/n posted. 11/14/2000 12:31:23 PM
|
BLD-Framing/Rough-in | 11/9/2000 | 11/13/2000 | 11/13/2000 | P | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 11/09/2000 at 16:34:38. Contact: ###-####.
|
BLD-Framing/Rough-in | 11/7/2000 | 11/7/2000 | 11/7/2000 | P | FAIL |
Russ Owen
|
|
|
FR INSP-- DAN ###-#### CELL SHEAR WALL allready done. 11/8/2000 9:05:13 AM
|
BLD-Framing/Rough-in | 11/6/2000 | 11/6/2000 | 11/6/2000 | P | FAIL |
Russ Owen
|
|
|
fr insp dan ###-####c/n posted. 11/7/2000 12:38:50 PM
|
BLD-Framing/Rough-in | 11/2/2000 | 11/3/2000 | 11/3/2000 | A | FAIL |
Steven Webb
|
|
|
fr & shear wall - dan ###-####--call 1st before insp: mechanical failed. 11/3/2000 12:18:37 PM 11/3/2000 12:30:27 PM: c/n issued, on shear items. 11/3/2000 3:06:45 PM
|
BLD-Framing/Rough-in | 11/1/2000 | 11/1/2000 | 11/1/2000 | P | FAIL |
Russ Owen
|
|
|
SHEAR NAILING\\###-#### Need to have a hold down and nailing schwedual. left c/n posted ,note have started with paper and wire for stucco with out approval. 11/3/2000 10:44:22 AM
|
BLD-Framing/Rough-in | 9/28/2000 | 9/29/2000 | 9/29/2000 | A | PART |
Russ Owen
|
|
|
nailing diaphram for roof --dan ###-####roof ok to cover. 9/29/2000 12:34:25 PM
|
BLD-Foundation | 8/7/2000 | 8/8/2000 | 8/8/2000 | P | CANC |
Russ Owen
|
|
|
###-####
|
BLD-Foundation | 8/7/2000 | 8/8/2000 | 8/8/2000 | P | PART |
Tony Young
|
|
|
###-####
WIP Gate code is *8889 8/8/2000 2:00:07 PM
|
BLD-Footing | 8/4/2000 | 8/7/2000 | 8/7/2000 | A | PART |
Russ Owen
|
|
|
###-####Appears ok no approved plans. 8/7/2000 1:11:07 PM
|