BLD-Final | 11/13/2000 | 11/14/2000 | 11/14/2000 | P | PASS |
Tom Arcoraci
|
|
|
brian ###-#### ok for perm occ if achd signs perm 11/14/2000 1:35:04 PM
|
Permanent Occupancy | | 11/14/2000 | 11/14/2000 | | DONE |
|
|
|
|
FIRE-Final Inspection | 11/10/2000 | 11/13/2000 | 11/13/2000 | P | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 11/10/2000 at 14:53:57. Contact: ###-####.
|
FIRE-Final Inspection | 11/9/2000 | 11/9/2000 | 11/9/2000 | P | FAIL |
Joe Tawney
|
|
|
###-####. Final Fail C/N issued 11/14/2000 7:55:06 AM
|
BLD-Final | 11/7/2000 | 11/8/2000 | 11/8/2000 | P | CANC |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 11/07/2000 at 12:35:37. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 11/08/2000 at 07:59:54.
|
FIRE-Final Inspection | 11/7/2000 | 11/8/2000 | 11/8/2000 | A | CANC |
Joe Tawney
|
|
|
###-####. Cancel Not ready 11/8/2000 12:28:05 PM
|
BLD-Framing/Rough-in | 10/26/2000 | 10/26/2000 | 10/26/2000 | P | FAIL |
Tony Young
|
|
|
Scheduled by Inspector: 415 On 10/26/2000 ceiling grid
air disffusers not in and ties @ 8" around perimeter still not in 10/26/2000 3:06:03 PM
|
BLD-Other | 10/24/2000 | 10/25/2000 | 10/25/2000 | P | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 10/24/2000 at 10:04:48. Contact: ###-####.
need to tie ceiling grid around perimeter at 8 " 10/25/2000 4:12:56 PM
|
BLD-Energy code compliance | 9/29/2000 | 9/29/2000 | 9/29/2000 | P | PASS |
Tony Young
|
|
|
Scheduled by Inspector: 415 On 9/29/2000
|
BLD-Framing/Rough-in | 9/29/2000 | 9/29/2000 | 9/29/2000 | P | PASS |
Tony Young
|
|
|
Scheduled by Inspector: 415 On 9/29/2000
|
BLD-Framing/Rough-in | 9/27/2000 | 9/27/2000 | 9/27/2000 | P | FAIL |
Tony Young
|
|
|
BRIAN ###-#### FR
c/n posted, holddowns, firewall sealing, and blocking 9/27/2000 3:17:22 PM
|
BLD-Framing/Rough-in | 9/20/2000 | 9/20/2000 | 9/20/2000 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 09/20/2000 at 07:59:47. Contact: ###-####.
east nailing on front ok 9/20/2000 3:33:29 PM
|
BLD-Other | 9/20/2000 | 9/20/2000 | 9/20/2000 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 09/20/2000 at 08:01:28. Contact: ###-####.
masonary bond beam,, top layer 9/20/2000 3:34:22 PM
|
BLD-Concrete | 9/19/2000 | 9/19/2000 | 9/19/2000 | P | PART |
Tony Young
|
|
|
Scheduled by Inspector: 415 On 9/19/2000 MASONARY WALLS
OK ,,, REBAR OK ,,, GROUT IS 7 BAG MIX,, OK TO GROUT FIRST 4 FT. IN COOLER AND TRASH ENCLOSER 9/19/2000 3:14:00 PM
|
BLD-Framing/Rough-in | 9/18/2000 | 9/19/2000 | 9/19/2000 | A | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 09/18/2000 at 10:36:17. Contact: ###-####.
C/N POSTED 9/19/2000 11:11:04 AM
|
BLD-Framing/Rough-in | 9/19/2000 | 9/19/2000 | 9/19/2000 | P | PART |
Tony Young
|
|
|
Scheduled by Inspector: 415 On 9/19/2000 SHEAR WALL NAILING
NAILING PATTERN ON EXTERIOR WALLS OK,, AND ROOF NAILING OK,,, STILL WORKING ON HOLD DOWNS, TO BE VERIFIED AT FRAMING. 9/19/2000 3:16:42 PM
|
BLD-Framing/Rough-in | 9/11/2000 | 9/11/2000 | 9/11/2000 | P | PART |
Tony Young
|
|
|
BRIAN-- ###-#### SHEAR WALL
ok to put 5/8" on shear wall on west side 9/11/2000 5:14:56 PM
|
BLD-Foundation | 8/24/2000 | 8/25/2000 | 8/25/2000 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 08/24/2000 at 13:28:59. Contact: ###-####.
wip on interior footing , and engineer fix on outside bearing wall and outside colums (part change in plans back to original plan) 8/25/2000 11:49:23 AM
|
BLD-Conference | 8/15/2000 | 8/15/2000 | 8/15/2000 | A | PASS |
Tony Young
|
|
|
Reviewed and approved structural modificactions to roof assembly provided by Pinnacle Engineering. CN issued for changes to be attached to approved plans.
done by Bob A. 8/18/2000 2:49:26 PM
|
BLD-Conference | 8/11/2000 | 8/11/2000 | 8/11/2000 | A | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 08/11/2000 at 07:04:57. Contact: ###-####.
conference on roof change, will submit changes to plan review. 8/11/2000 11:04:54 AM
|
BLD-Foundation | 8/3/2000 | 8/4/2000 | 8/4/2000 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 08/03/2000 at 16:09:49. Contact: ###-####.
wip 8/4/2000 11:31:40 AM
|
BLD-Footing | 8/2/2000 | 8/3/2000 | 8/3/2000 | A | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 08/02/2000 at 16:28:47. Contact: ###-####.
|
BLD-Footing | 8/1/2000 | 8/2/2000 | 8/2/2000 | P | PART |
Tony Young
|
|
|
BRIAN--###-#### CELL FT
w.i.p. appears ok, will call back in 8/2/2000 3:44:57 PM
|