Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD00-01151
StatusFinaled
Name HOFF BLDG (3RD & 4TH FLOOR CORE UPGRADE)
Site Address 802 W BANNOCK (3RD & 4TH FLRS)
Project NameHOFF BUILDING-3RD/4TH FL
Customer Number 
ePlanReviewNo
Description
(HOFF BUILDING - 3RD & 4TH FLOOR CORE UPGRADE) This building is fire sprinklered for area increase, because it is a high-rise, and to meet the provisions of the 1994 UCBC. To perform upgrades to the common areas on the 3rd and 4th floors of an existing office building. Work is to include upgrading the existing core restrooms to be more accessible to the disabled, upgrading the existing "corridors" (4th floor) and "passageways" (3rd floor) to meet the 1994 UCBC and the conditions of a code upgrade agreement signed by the Building Official, installing a handrail on one side of the North stairway from the 3rd floor to the basement, and constructing a new corridor wall with protected openings on the 4th floor all per approved drawings and plan review conditions on file. The location of fire sprinkler heads shall comply with NFPA 13-1996 as regulated by the Fire Department. This permit DOES NOT establish a CERTIFICATE OF OCCUPANCY for any tenant. PC-310-00 **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection7/2/20047/2/20047/2/2004APASS
DetailsRick Jackson
FIRE-Conference6/15/20046/29/20046/29/2004PPART
DetailsRick Jackson
Follow up for completion Project still under construction 6/29/2004 10:19:07 AM
FIRE-Conference5/5/20046/15/20046/15/2004PPART
DetailsRick Jackson
Follow up to check status of the smoke/fire dampers and elevator smoke removal systems per agreement Talked to Brett and he said the equipment has been delayed and it should be completed within 2 weeks 6/15/2004 3:49:48 PM
BLD-Final4/29/20044/30/20044/30/2004PPART
DetailsDave Hannah
wendy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore all items completed but for two fire dampers hook up and elevator shaft venting 4/30/2004 4:39:52 PM
FIRE-Final Inspection4/29/20044/30/20044/30/2004PPART
DetailsRick Jackson
wendy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Conference4/27/20044/29/20044/29/2004ADONE
DetailsDave Hannah
WENDY; Phone #: ###-#### Internet Inspection Request from: Annette Moore//PERMIT REOPENED PER DAVE HANNAH
FIRE-Conference4/27/20044/29/20044/29/2004APART
DetailsRick Jackson
WENDY; Phone #: ###-#### Internet Inspection Request from: Annette Moore//PERMIT REOPENED PER DAVE HANNAH Need plans for smoke ventilation of elevator shaft and smoke/fire damper operation on third floor; closure and smoke seals on rated doors 4/29/2004 10:16:49 AM
BLD-Conference4/27/20044/27/20044/27/2004PCANC
DetailsDave Hannah
Permit reopened per Dave Hannah//RESCHEDULED FOR 04/29/04
BLD-Conference9/17/20039/24/20039/24/2003ACANC
DetailsDave Hannah
BLD-Conference9/17/20039/18/20039/18/2003ADONE
DetailsDave Hannah
met with wendy talked about what needs to be finished with this permit 9/19/2003 9:55:16 AM
BLD-Final9/15/20039/16/20039/16/2003PPART
DetailsDave Hannah
mike; Phone #: ###-#### Internet Inspection Request from: Marc Lileks
FIRE-Final Inspection9/15/20039/16/20039/16/2003APASS
DetailsRick Jackson
mike; Phone #: ###-#### Internet Inspection Request from: Marc Lileks
BLD-Conference6/16/20036/17/20036/17/2003PPASS
DetailsCarl Dependahl
mike; Phone #: ###-#### Internet Inspection Request from: Annette Moore...complete restrooms; W.C. locations ok as discussed ... floor mount/rear discharge 6/17/2003 3:22:04 PM
BLD-Conference5/5/20035/6/20035/6/2003PPASS
DetailsCarl Dependahl
Rick, re corridor upgrade.... 5/6/2003 3:25:55 PM
BLD-Conference4/9/20034/10/20034/10/2003PPART
DetailsCarl Dependahl
ele ok per J schmer 4/10/2003 2:38:49 PM
BLD-Conference3/31/20034/1/20034/1/2003APASS
DetailsCarl Dependahl
Wendy...advised that permit req's final; consult/obtain plbg, elec, hvac and fire as needed. N&O isssued. 4/1/2003 8:54:35 AM
FIRE-Final Inspection4/30/20024/30/20024/30/2002PPASS
DetailsTroy Cobbley
fire life/safety finaled 4/30/2002 10:31:28 AM
FIRE-Final Inspection4/24/20024/24/20024/24/2002PCANC
DetailsRick Jackson
###-#### TODD
BLD-Conference4/23/20024/23/20024/23/2002APASS
DetailsCarl Dependahl
w/ Rick J...& Wendy, leasing agent...complete struct work for 3rd & 4th fl. upgrades; consult plbg re permits for req'd restrm. work. chk w/ elec insp for final for elec work associated w/ signage or alarms
BLD-Final4/22/20024/22/20024/23/2002PNR
DetailsCarl Dependahl
###-#### complete work for corridor & restroom upgrades 4/23/2002 10:35:24 AM
FIRE-Final Inspection4/22/20024/22/20024/22/2002PFAIL
DetailsRick Jackson
early pm ###-#### need additional exit signs; will have to meet with Wendy and Carl about the list of agreement action items 4/22/2002 4:39:29 PM
BLD-Conference1/25/20021/25/20021/25/2002PPASS
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 01/25/2002 at 10:38:32. Contact: ###-####...keep c/n re doors, corridor const, etc. consult plbg insp re ADA restrms/permits 1/25/2002 5:55:24 PM
BLD-Conference8/13/20018/13/20018/13/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 8/13/2001 7:40:50 AM w/ "new" contractor...status of...& to complete job; reinsp req'd.
BLD-Conference8/8/20018/9/20018/9/2001APASS
DetailsCarl Dependahl
call to meet there ###-####; w/ "new" contractor 8/9/2001 5:11:59 PM
BLD-Conference7/23/20017/23/20017/23/2001PPART
DetailsCarl Dependahl
Conference on corridor requirements on 3rd flr. and accessibility requirements in restrooms.
FIRE-Final Inspection3/6/20013/7/20013/8/2001ANR
DetailsRick Jackson
###-####
BLD-Final3/6/20013/7/20013/7/2001AFAIL
DetailsCarl Dependahl
###-####, need all other signatures, complete remainder of c/n ... doors ,corridor walls sealed, etc3/7/2001 2:03:07 PM 3/7/2001 2:03:51 PM
BLD-Conference2/14/20012/14/20012/14/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 2/14/2001 5:08:59 PM w/bldr re insps
BLD-Framing/Rough-in2/14/20012/14/20012/14/2001PFAIL
DetailsCarl Dependahl
###-####; c/n ...complete firestops, doors at corridors, seismic at ceilings, etc. 2/15/2001 11:43:47 AM
BLD-Framing/Rough-in1/5/20011/5/20011/5/2001PPART
DetailsCarl Dependahl
###-#### r/i 4th fl r. rm wall ok 1/5/2001 6:08:57 PM
BLD-Conference12/6/200012/6/200012/6/2000PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 12/6/2000 4:27:06 PM w/ contractor re corridor upgrade, complete firestops, etc.
BLD-Framing/Rough-in10/16/200010/16/200010/16/2000PFAIL
DetailsJim Storey
4th floor Harry ###-#### c/n 2 hr floor ceilling pipe and chase areas/ wood in ceilling / old plasrer cilling removed is this part of thr old assembly.10/16/2000 4:12:05 PM 10/16/2000 4:15:24 PM
BLD-Conference9/13/20009/13/20009/13/2000PPART
Details
Richard ###-#### pending arch submittals 9/14/2000 9:23:40 AM
BLD-Final2/20/20012/20/20012/21/2000PFAIL
DetailsCarl Dependahl
###-####, c/n re doors, handrails; obtain other finals 2/21/2001 1:15:09 PM
BLD-Conference9/24/20039/25/2003 A 
DetailsDave Hannah