BLD-Final | 1/29/2002 | 1/29/2002 | 1/29/2002 | P | PASS |
Jim Storey
|
|
|
CARL ###-####
|
BLD-Framing/Rough-in | 3/26/2001 | 3/27/2001 | 3/27/2001 | P | NR |
Steven Webb
|
|
|
Carl ###-#### carl call 3/26 2001 and made a appointment w/301 to be there for insp. at 4:30 pm / I added this note if insp. is trans. to someone else. 3/27/2001 10:53:23 AM
|
BLD-Final | 10/19/2000 | 10/20/2000 | 10/20/2000 | A | PART |
Jim Storey
|
|
|
PLEASE FINAL FOR THE FOUNDATION AND THE BEAM DOWN THE CENTER ONLY FOR CONTRACTOR STEVE BAKER ###-####foundation only ok 10/20/2000 4:58:32 PM
|
BLD-Final | 10/2/2000 | 10/2/2000 | 10/2/2000 | P | PART |
Russ Owen
|
|
|
###-####. Need bottom post base ,or provide detail from project engineer. 10/3/2000 8:44:08 AM
|
BLD-Final | 9/22/2000 | 9/25/2000 | 9/25/2000 | A | FAIL |
Jim Storey
|
|
|
Steve ###-#### need weld conections at beam and base plate. 9/25/2000 10:30:37 AM
|
BLD-Foundation | 6/22/2000 | 6/23/2000 | 6/23/2000 | A | PART |
Jim Storey
|
|
|
re-bar Steve Baker ###-#### work in progess appears to be ok. 6/23/00 9:33:41 AM
|
BLD-Footing | 6/1/2000 | 6/1/2000 | 6/1/2000 | P | PASS |
Jim Storey
|
|
|
STEVE BAKER-- ###-#### FT
|
BLD-Footing | 5/26/2000 | 5/30/2000 | 5/30/2000 | P | FAIL |
Jim Storey
|
|
|
###-####
|
BLD-Footing | 5/25/2000 | 5/26/2000 | 5/26/2000 | A | CANC |
Tom Arcoraci
|
|
|
steve baker---###-####
|