Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD00-01255
StatusFinaled
Name SAFFRON RESTAURANT
Site Address 612 W GROVE ST
Project NameHEATH WAREHOUSE
Customer Number 
ePlanReviewNo
Description
(SAFFRON RESTAURANT) This building is fire sprinklered to substitute for 1-hr fire-resistive construction. To construct interior tenant improvements for a new full service restaurant (3,745 square foot first floor plus a 630 square foot mezzanine). Approximately 400 square feet of the first floor is being lowered 2 feet below the existing first floor level. A mezzanine is being constructed over the lowered first floor area with the finished floor level approximately 6 feet above the existing first floor level. The mezzanine has a steel deck and concrete floor system supported by tube steel columns and beams. Plywood sheathing attached to steel stud walls installed around the perimeter of the floor provides lateral support. Work is to include two restrooms accessible to the disabled, two grease hood and duct systems, two food preparation kitchens, stairs to the lower and upper levels, interior walls and bulkheads, a fire alarm system, and a small suspended ceiling all per approved drawings, engineering, and plan review conditions on file. The maximum allowed occupant load of the assembly area (152) shall be posted on an approved sign near the main exit. The fire sprinkler system shall comply with NFPA 13-1996 as regulated by the Fire Department. (PC-331-00) **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 11/28/200011/28/2000 DONE
Details
FIRE-Final Inspection10/18/200010/20/200010/23/2000PPART
DetailsRick Jackson
FIRE FN TIM-- ###-#### need sign at FDC for all addresses covered by the sprinkler system 10/23/2000 10:51:52 AM
BLD-Final10/19/200010/20/200010/20/2000PPART
DetailsJim Storey
tim ###-#### need fire retardent lable on curtian above grill area when installed/ tenp ok upon fire sign off. 10/20/2000 5:23:52 PM
FIRE-Final Inspection10/5/200010/6/200010/6/2000AFAIL
DetailsRick Jackson
###-#### tested kicthen extinguishing system - okay; need occupant load sign; need alarm plans and test; need map for FACP and sprinkler location 10/6/2000 3:46:10 PM
BLD-Conference9/27/20009/28/20009/28/2000APASS
DetailsJim Storey
FOR CONF-- LARRY ###-####
BLD-Framing/Rough-in9/1/20009/5/20009/5/2000APART
Details
Larry; ###-#### 4-part connection of the 6" studs to the tracks okt o install hoon at the front location 9/5/2000 10:38:12 AM
FIRE-Conference8/31/20009/1/20009/1/2000APART
DetailsRick Jackson
LARRY SMITH-- CELL ###-#### FOR CONF discussed duct detector placement; fire extinguisher placement; alarm system 9/1/2000 10:40:18 AM
BLD-Footing7/11/20007/12/20007/12/2000APASS
Details
###-#### made ok to pour. r-bar placed 7/12/00 8:40:59 AM
BLD-Footing7/3/20007/5/20007/5/2000PPASS
Details
###-#### r-b 7/5/00 1:18:48 PM ###-#### r-bar islacd ok to pour 2nd lift also 7/5/00 1:18:48 PM 7/5/00 1:19:22 PM
BLD-Conference6/29/20006/29/20006/29/2000PPART
Details
larry smith ###-#### pre consp meeting with super and 409, expecting shaftwall assy 6/30/00 10:07:13 AM