BLD-Final | 4/27/2001 | 4/30/2001 | 4/30/2001 | P | PASS |
Jim Storey
|
|
|
###-####
|
Permanent Occupancy | | 4/30/2001 | 4/30/2001 | | DONE |
|
|
|
|
BLD-Final | 2/22/2001 | 2/23/2001 | 2/23/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 02/22/2001 at 14:55:02. Contact: ###-####. temp ok pending p&z sign off need reinsp for ada parking space. 2/23/2001 3:34:42 PM
|
BLD-Conference | 2/21/2001 | 2/22/2001 | 2/22/2001 | A | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 02/21/2001 at 15:49:02. Contact: ###-####.
|
FIRE-Final Inspection | 2/21/2001 | 2/22/2001 | 2/22/2001 | P | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 02/21/2001 at 16:01:57. Contact: ###-####.
|
FIRE-Final Inspection | 2/19/2001 | 2/20/2001 | 2/20/2001 | P | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 02/19/2001 at 07:44:48. Contact: ###-####. exits blocked by scaffolding; remote LED's for AHU detectors; address 2/20/2001 4:24:15 PM
|
BLD-Framing/Rough-in | 2/5/2001 | 2/5/2001 | 2/5/2001 | P | PASS |
Jim Storey
|
|
|
###-#### ceilling ok for cover. 2/6/2001 8:57:24 AM
|
BLD-Framing/Rough-in | 1/18/2001 | 1/18/2001 | 1/18/2001 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 01/18/2001 at 07:16:10. Contact: ###-####. 1# df 4 x 12 beam material on site to instal at store front and steel brace to verify assembly at ceilling grid insp. 1/18/2001 9:54:27 AM
|
BLD-Framing/Rough-in | 1/5/2001 | 1/8/2001 | 1/8/2001 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 01/05/2001 at 16:03:02. Contact: ###-####. GROUT OK UNDER COLUMS/ 1/8/2001 10:30:10 AM
|
BLD-Framing/Rough-in | 1/8/2001 | 1/8/2001 | 1/8/2001 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 01/08/2001 at 07:08:52. Contact: ###-####. ENTRY SOFFIT OK FOR COVER 1/8/2001 10:29:51 AM
|
BLD-Framing/Rough-in | 12/29/2000 | 1/2/2001 | 1/2/2001 | A | NH |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/29/2000 at 17:21:38. Contact: ###-####. no access to canopy framing. 1/2/2001 11:12:25 AM
|
BLD-Framing/Rough-in | 12/28/2000 | 12/29/2000 | 12/29/2000 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/28/2000 at 12:33:07. Contact: ###-####. sheer weld plates ok for cover./ c/n for entry sofit pending insp. 12/29/2000 4:59:49 PM
|
BLD-Framing/Rough-in | 12/27/2000 | 12/28/2000 | 12/28/2000 | A | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/27/2000 at 16:39:41. Contact: ###-####.
|
BLD-Framing/Rough-in | 12/26/2000 | 12/27/2000 | 12/27/2000 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/26/2000 at 10:51:02. Contact: ###-####. hold downs insp and in place special insp. feild report aproved for embedment length of rod and king stud atchment per listing of holddowns.other idems on c/n out standing. 12/27/2000 3:04:47 PM
|
BLD-Framing/Rough-in | 12/19/2000 | 12/20/2000 | 12/20/2000 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/19/2000 at 08:23:55. Contact: ###-####. interior sheer ok for cover soffit framing and raffter hangers pending re insp. 12/20/2000 1:50:14 PM
|
BLD-Framing/Rough-in | 12/14/2000 | 12/15/2000 | 12/15/2000 | A | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/14/2000 at 15:47:48. Contact: ###-####. need hold downs and sheer walls complet interior/hangers at beam not nailled/ front soffit framing missing screws at joints. 12/15/2000 1:19:49 PM
|
BLD-Framing/Rough-in | 12/5/2000 | 12/6/2000 | 12/6/2000 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/05/2000 at 15:59:54. Contact: ###-####. drag st straps in place ok screws at top track ok 12/6/2000 3:51:32 PM
|
BLD-Framing/Rough-in | 11/30/2000 | 12/1/2000 | 12/1/2000 | A | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/30/2000 at 12:01:23. Contact: ###-####. south wall sheathing missing top roof line screw atchment/ stud atchment at 4x4 steel colum. only south wall insp./missing top channal to wood plate 2@ 12 oc # 10 screws. 12/1/2000 9:27:00 AM
|
BLD-Concrete | 11/10/2000 | 11/13/2000 | 11/13/2000 | P | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/10/2000 at 13:09:01. Contact: ###-####. CANCEL PER RICH JUDY
|
BLD-Footing | 10/31/2000 | 11/1/2000 | 11/1/2000 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/31/2000 at 08:05:05. Contact: ###-####. tar papper in place for isolation of footting center of bldg. ok. 11/1/2000 9:19:11 AM
|
BLD-Footing | 10/26/2000 | 10/27/2000 | 10/27/2000 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/26/2000 at 09:25:13. Contact: ###-####. pad ft ok. 10/27/2000 5:29:19 PM
|
BLD-Footing | 10/25/2000 | 10/26/2000 | 10/26/2000 | P | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/25/2000 at 13:52:37. Contact: ###-####.
|
BLD-Foundation | 10/19/2000 | 10/20/2000 | 10/20/2000 | P | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/19/2000 at 16:24:52. Contact: ###-####. trans to tom a. via phone. 10/20/2000 4:49:04 PM
|
BLD-Foundation | 10/20/2000 | 10/20/2000 | 10/20/2000 | P | PASS |
Tom Arcoraci
|
|
|
Added by Inspector: 408 On 10/20/2000 ok 10/20/2000 4:06:57 PM
|
BLD-Foundation | 10/18/2000 | 10/19/2000 | 10/19/2000 | P | PART |
Jim Storey
|
|
|
stem wall Rich ###-#### east half of bldg. ok for steim wall. 10/19/2000 2:35:42 PM
|
BLD-Footing | 10/17/2000 | 10/17/2000 | 10/17/2000 | P | PASS |
Jim Storey
|
|
|
REBAR INSP -###-#### OFFICE RICH footting ok 10/17/2000 3:21:02 PM
|