BLD-Final | 10/19/2000 | 10/19/2000 | 10/19/2000 | P | PASS |
Jim Sly
|
|
|
###-####
|
BLD-Energy code compliance | 8/17/2000 | 8/18/2000 | 8/18/2000 | A | PASS |
Jim Sly
|
|
|
Emmett ###-#### frame pass 8/18/2000 10:18:31 AM
|
BLD-Framing/Rough-in | 8/15/2000 | 8/15/2000 | 8/15/2000 | P | PASS |
Jim Sly
|
|
|
###-####- EMMETT FR
|
BLD-Framing/Rough-in | 7/19/2000 | 7/19/2000 | 7/19/2000 | P | PART |
Jim Sly
|
|
|
Lorin ###-#### shear insp Shear ok 7/20/00 9:33:00 AM
|
BLD-Framing/Rough-in | 7/17/2000 | 7/18/2000 | 7/18/2000 | P | FAIL |
Jim Sly
|
|
|
for lorin--###-####--re-insp --shear wall C/N..Need letter form Eng to OK 16" shear panels at Gar fronts. 7/18/00 1:31:35 PM
|
BLD-Framing/Rough-in | 7/17/2000 | 7/17/2000 | 7/17/2000 | P | FAIL |
Carl Dependahl
|
|
|
lorin-- ###-#### shear wall shear: C/N nailing, blocking @ rear tall wall. 7/18/00 2:10:41 PM
|
BLD-Framing/Rough-in | 7/13/2000 | 7/13/2000 | 7/13/2000 | P | NR |
Jim Storey
|
|
|
emmett ###-#### shear wall insp
|
BLD-Framing/Rough-in | 6/2/2000 | 6/5/2000 | 6/5/2000 | A | FAIL |
Jim Sly
|
|
|
shear wall--###-####-bill NR 6/6/00 11:37:32 AM
|
BLD-Footing | 6/1/2000 | 6/2/2000 | 6/2/2000 | A | PART |
Jim Sly
|
|
|
Bill ###-#### Footing for garage not complete- 10 am. 6/5/00 10:55:43 AM
|
BLD-Foundation | 5/25/2000 | 5/25/2000 | 5/25/2000 | P | PART |
Jim Sly
|
|
|
###-#### ready at 2 Bsmt. walls appear ok rebar 2' O.C. horiz/vert. 5/26/00 12:17:10 PM
|
BLD-Footing | 5/19/2000 | 5/22/2000 | 5/22/2000 | A | PART |
Jim Sly
|
|
|
###-#### Footing for bsmt. only 5/23/00 2:24:19 PM
|