BLD-Conference | 1/7/2003 | 1/7/2003 | 1/7/2003 | P | CANC |
Wm. Michael Meloy
|
|
|
|
Code Occupancy Approval | 1/7/2003 | 1/7/2003 | 1/7/2003 | P | PASS |
Wm. Michael Meloy
|
|
|
Compliance met. 1/7/2003 2:53:00 PM
|
Permanent Occupancy | | 6/17/2002 | 6/17/2002 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 9/4/2001 | 9/5/2001 | 9/5/2001 | A | PASS |
Jim Storey
|
|
|
###-#### GALE fianl ok for perm occ upon final and bond release from p&z/ 9/5/2001 3:36:59 PM
|
BLD-Final | 8/15/2001 | 8/16/2001 | 8/15/2001 | A | DONE |
Jim Storey
|
|
|
###-#### ron
|
BLD-Final | 4/2/2001 | 4/3/2001 | 4/3/2001 | A | FAIL |
Jim Storey
|
|
|
Ron ###-#### need rack permit./ada protection on sink/ mech sign off/ p/z bond/exit signage and hardware.sp sign off. 4/3/2001 9:17:29 AM
|
FIRE-Final Inspection | 1/11/2001 | 1/11/2001 | 1/11/2001 | P | PASS |
Rick Jackson
|
|
|
Scheduled by Inspector: 409 On 1/11/2001 3:44:23 PM verified smoke vents on roof have safety locks removed - okay; final pass 1/11/2001 3:45:10 PM
|
BLD-Framing/Rough-in | 12/20/2000 | 12/21/2000 | 12/21/2000 | A | NR |
Jim Storey
|
|
|
Ron ###-####
|
BLD-Framing/Rough-in | 11/27/2000 | 11/28/2000 | 11/28/2000 | A | PASS |
Jim Storey
|
|
|
###-#### wood and steel framing ok pending others and smoke vent instalation/ exit door south east corner of old blg. needs cut in. 11/28/2000 10:08:25 AM
|
BLD-Other | 11/27/2000 | 11/27/2000 | 11/27/2000 | | PASS |
|
|
|
office resubmital aproved and acrived to master set.
|
BLD-Framing/Rough-in | 10/4/2000 | 10/5/2000 | 10/5/2000 | P | PART |
Jim Storey
|
|
|
RE-BAR INSP RON ###-#### placed with special insp pending report. 10/5/2000 4:03:12 PM
|
BLD-Concrete | 9/22/2000 | 9/25/2000 | 9/25/2000 | P | PART |
Jim Storey
|
|
|
###-#### bar ok pending s/i report. 12 ft lift. 9/25/2000 3:09:52 PM
|
BLD-Foundation | 9/21/2000 | 9/21/2000 | 9/21/2000 | P | PART |
Jim Storey
|
|
|
Ron; ###-#### pending s/i report. 9/21/2000 3:41:50 PM
|
BLD-Concrete | 9/20/2000 | 9/20/2000 | 9/20/2000 | P | PART |
Jim Storey
|
|
|
###-#### rebar inspection placed with special insp. 9/20/2000 5:21:48 PM
|
BLD-Concrete | 9/20/2000 | 9/20/2000 | 9/20/2000 | P | PART |
Jim Storey
|
|
|
###-#### rebar inspection placed with special insp. 9/20/2000 5:21:48 PM
|
BLD-Concrete | 9/18/2000 | 9/18/2000 | 9/18/2000 | P | PART |
Jim Storey
|
|
|
rebar ###-#### pending report on grout. 9/18/2000 4:58:32 PM
|
BLD-Framing/Rough-in | 9/14/2000 | 9/14/2000 | 9/14/2000 | P | PART |
Jim Storey
|
|
|
REBAR INSP-- ###-#### RON pending sp/insp. bar ok first 9/14/2000 3:08:56 PM lift north and east walls. 9/14/2000 3:09:16 PM
|
BLD-Foundation | 9/1/2000 | 9/5/2000 | 9/5/2000 | A | PART |
Tom Arcoraci
|
|
|
Ron ###-#### 9/5/2000 10:51:53 AM spec insp on site 9/5/2000 10:52:08 AM
|
FIRE-Sprinkler Rough-in | 8/30/2000 | 8/31/2000 | 8/31/2000 | A | FAIL |
Rick Jackson
|
|
|
david ###-#### underground fire see FIR00-00504 need more clearance under foundation 8/31/2000 3:35:08 PM
|
FIRE-Sprinkler Rough-in | 8/29/2000 | 8/29/2000 | 8/30/2000 | P | FAIL |
Rick Jackson
|
|
|
underground test David ###-#### left c/n - plans not submitted 8/30/2000 9:30:53 AM
|
BLD-Footing | 8/28/2000 | 8/29/2000 | 8/29/2000 | A | PART |
Jim Storey
|
|
|
ron ###-####
|