Permanent Occupancy | | 12/7/2000 | 12/7/2000 | | DONE |
|
|
|
|
BLD-Final | 12/1/2000 | 12/4/2000 | 12/4/2000 | A | PASS |
Russ Owen
|
|
|
###-#### harvey fn.still needs zoning approval,all other items ok. 12/4/2000 9:43:25 AM
|
BLD-Final | 11/30/2000 | 11/30/2000 | 11/30/2000 | P | PART |
Russ Owen
|
|
|
###-####ok temp need final p/z zoning and fire caulk penit thru 1 hr wall also roof joist. 11/30/2000 2:34:29 PM
|
BLD-Final | 11/22/2000 | 11/28/2000 | 11/28/2000 | A | NR |
Tom Arcoraci
|
|
|
###-####
|
FIRE-Final Inspection | 11/22/2000 | 11/27/2000 | 11/27/2000 | A | PASS |
Rick Jackson
|
|
|
###-#### /// doors in occupancy separation wall will have closures installed for structural inspector 11/27/2000 10:46:48 AM
|
BLD-Framing/Rough-in | 11/15/2000 | 11/15/2000 | 11/15/2000 | P | PART |
Tom Arcoraci
|
|
|
###-#### ceiling inspection grid ok 11/15/2000 4:47:01 PM
|
BLD-Framing/Rough-in | 9/29/2000 | 10/2/2000 | 10/2/2000 | A | PART |
Alan Hauser
|
|
|
no inspection of rated wall 10/2/2000 12:09:59 PM
|
BLD-Foundation | 8/16/2000 | 8/17/2000 | 8/17/2000 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 08/16/2000 at 14:02:39. Contact: ###-####. Met Gary w/ K2 onsite...pend spec insp reports (MTI) 8/17/2000 11:16:37 AM
|
BLD-Footing | 8/10/2000 | 8/11/2000 | 8/11/2000 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 08/10/2000 at 13:35:39. Contact: ###-####. spec insp 8/11/2000 10:17:35 AM
|