BLD-Final | 2/22/2002 | 2/25/2002 | 2/25/2002 | P | NR |
Tom Arcoraci
|
|
|
john ###-####
|
BLD-Framing/Rough-in | 10/27/2000 | 10/30/2000 | 10/30/2000 | A | PART |
Russ Owen
|
|
|
FR INSP JEAN-- ###-#### owner wanted conference to find out what they n 10/30/2000 12:58:49 PM eede dto proceed. 10/30/2000 12:58:57 PM
|
BLD-Framing/Rough-in | 8/22/2000 | 8/23/2000 | 8/23/2000 | A | CANC |
|
|
|
Scheduled by a contractor via Hello! on 08/22/2000 at 15:26:14. Contact: ###-####. rame not to be done until the permit is upgraded or a new permit is issued on the project to finish same 8/25/2000 10:00:58 AM
|
BLD-Framing/Rough-in | 8/22/2000 | 8/23/2000 | 8/23/2000 | A | CANC |
|
|
|
Scheduled by a contractor via Hello! on 08/22/2000 at 15:26:14. Contact: ###-####. rame not to be done until the permit is upgraded or a new permit is issued on the project to finish same 8/25/2000 10:00:58 AM
|
BLD-Final | 8/14/2000 | 8/14/2000 | 8/14/2000 | A | PART |
|
|
|
Scheduled by Inspector: 338 On 8/14/2000 approved the construction isper the approved permit, letter signed by the owner that work is acceptable and he will upgrade the permit 8/14/2000 9:14:00 AM
|
BLD-Framing/Rough-in | 8/4/2000 | 8/4/2000 | 8/4/2000 | P | PASS |
|
|
|
###-#### per this permit framing is ok 8/4/2000 3:02:25 PM
|
BLD-Foundation | 6/1/2000 | 6/1/2000 | 6/1/2000 | P | PASS |
|
|
|
stem walls Don Easteppe ###-#### okto pour 6/2/00 4:13:19 PM
|
BLD-Footing | 5/30/2000 | 5/31/2000 | 5/31/2000 | A | PASS |
|
|
|
###-#### r-bar placed 5/31/00 11:10:12 AM
|