BLD-Final | 9/28/2000 | 9/28/2000 | 9/28/2000 | P | PART |
Jim Storey
|
|
|
###-#### temp ok pending others for perm 9/28/2000 1:47:08 PM
|
FIRE-Final Inspection | 9/27/2000 | 9/28/2000 | 9/28/2000 | A | CANC |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 09/27/2000 at 17:26:19. Contact: ###-####. should have been final structural
|
BLD-Final | 9/27/2000 | 9/27/2000 | 9/27/2000 | P | PART |
Jim Storey
|
|
|
FN DAVID ###-####
|
FIRE-Final Inspection | 9/26/2000 | 9/27/2000 | 9/27/2000 | P | PART |
Rick Jackson
|
|
|
dAVID ###-#### need assembly permit 9/27/2000 4:11:31 PM
|
FIRE-Final Inspection | 9/25/2000 | 9/26/2000 | 9/26/2000 | A | FAIL |
Rick Jackson
|
|
|
David ###-#### needs sprinkler bell; occupant load sign; panic on side door; hang extinguishers; 9/26/2000 2:21:31 PM
|
BLD-Framing/Rough-in | 9/21/2000 | 9/21/2000 | 9/21/2000 | P | PART |
Jim Storey
|
|
|
sizmit grid insp-- david-- ###-#### ceilling ok for cover. 9/21/2000 4:11:39 PM
|
BLD-Framing/Rough-in | 9/6/2000 | 9/7/2000 | 9/7/2000 | A | PASS |
|
|
|
shaft David ###-#### made ok duct resized and the shaft was reworked 9/7/2000 3:13:53 PM
|
BLD-Framing/Rough-in | 9/5/2000 | 9/6/2000 | 9/6/2000 | A | FAIL |
|
|
|
David ###-#### 1-hour shaft too close to the duct at the roof deck line 9/6/2000 11:38:35 AM
|
BLD-Framing/Rough-in | 8/23/2000 | 8/24/2000 | 8/24/2000 | A | PART |
Jim Storey
|
|
|
David ###-#### framing ok. 8/24/2000 2:26:04 PM
|
BLD-Framing/Rough-in | 8/23/2000 | 8/23/2000 | 8/23/2000 | P | CANC |
|
|
|
last today David ###-#### done by 301 8/24/2000 10:31:17 AM
|
BLD-Framing/Rough-in | 8/21/2000 | 8/22/2000 | 8/22/2000 | P | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 08/21/2000 at 16:29:05. Contact: ###-####.late as possible called and canclled. 8/22/2000 3:01:32 PM
|
BLD-Framing/Rough-in | 9/1/2000 | 9/1/2000 | 3/31/2000 | P | FAIL |
Jim Storey
|
|
|
david-- ###-#### --shaft around grease vent shaft fail c/n posted mech to be reinspected. 9/1/2000 3:25:03 PM
|