Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD00-01530
StatusFinaled
Name SCP GLOBAL TECHNOLOGIES (BLDG 456)
Site Address 8455 W WESTPARK ST
Project NameSCP GLOBAL TECH-#456
Customer Number 
ePlanReviewNo
Description
SCP GLOBAL TECHNOLOGIES (BLDG 456) PHASE I - Interior demolition of walls & finishes done under BLD00-01363. To remodel interior by increasing the clean room area & relocate the access stairs to the lower level clean room mechanical / air return; relocate return air chases in clean room; expand the assembly fabrication area into the previous lunch / breakroom / office / restroom areas; relocate D/I Plan Filter Wall and double doors / infill wall opening; add BCF Room; relocate or upgrade process piping & testing equipment, electrical, plumbing, mechanical, sprinkler and alarm systems for needs & code compliance; suspended ceiling system and upgrades to remaining men,s & women,s restrooms for full accessibility compliance. NOTE: This building is fully fire sprinklered for area increase. THE NEW ADDITION(S) TO THE NORTH AND CONNECTION BETWEEN BUILDINGS 455 & 456 WITH ANY INTERIOR WORK SHOWN ON ANY PLANS ARE NOT PART OF THIS PROJECT SCOPE. SEPARATE APPLICATION AND PLANS ARE CURRENTLY BEING REVIEWED. (P.C.#00-389)/drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection11/15/200011/16/200011/16/2000APASS
DetailsJoe Tawney
###-#### Final OK for permanant occupancy or cert of completion 11/17/2000 7:58:43 AM
BLD-Final11/7/200011/8/200011/8/2000PPASS
DetailsDave Hannah
FN OCC JEFF ###-####
BLD-Final11/6/200011/7/200011/7/2000ANR
DetailsTom Arcoraci
###-#### jeff 11/7/2000 9:50:29 AM need sigs on card will recall 11/7/2000 9:56:51 AM
FIRE-Final Inspection8/22/20008/23/20008/23/2000ANR
DetailsCarl Dependahl
Jeff ###-####, for fire 8/22/2000 3:22:38 PM
FIRE-Final Inspection8/22/20008/23/20008/23/2000APART
DetailsJoe Tawney
###-#### OK on rough in of relocation of spklr heads away from cable trays 8/23/2000 12:48:30 PM
BLD-Framing/Rough-in8/2/20008/3/20008/3/2000APART
DetailsCarl Dependahl
fire structure draft stop Gregg ###-####draft stop ok; rec'd specs and details req'd 8/3/2000 12:11:01 PM
BLD-Framing/Rough-in8/1/20008/2/20008/2/2000APART
DetailsCarl Dependahl
GREG ###-#### CEILING GRID INSP; south portion ok 8/2/2000 10:17:12 AM
FIRE-Final Inspection8/1/20008/2/20008/2/2000APART
DetailsJoe Tawney
jeff ###-#### Ok on sprinkler in southwall area ok to cover 8/2/00 3:06:54 PM
BLD-Framing/Rough-in7/27/20007/28/20007/28/2000APART
Details
ceiling grid ###-#### jeff ok to drop n tiles in the two center bays all diffusers are connected properly waiting for mech signoff 7/28/2000 2:11:25 PM
BLD-Framing/Rough-in7/26/20007/27/20007/27/2000APART
Details
ceiling grid Greg ###-#### ok on the center bay for tile drop in with 406 blessing 7/27/2000 12:41:23 PM
FIRE-Final Inspection7/26/20007/27/20007/27/2000PPART
DetailsJoe Tawney
Jeff ###-#### Spklr. R/I 2 middle areas 2 column obstructions & install 2 heads. 7/28/00 10:04:33 AM
BLD-Final7/25/20007/26/20007/26/2000AFAIL
DetailsCarl Dependahl
###-####; ok to use NW corner of bldg; phased project. 7/26/2000 11:00:45 AM
BLD-Final7/25/20007/25/20007/25/2000PFAIL
DetailsCarl Dependahl
art-- ###-#### ck wall; ok to cover 7/25/2000 4:23:57 PM
FIRE-Final Inspection7/24/20007/25/20007/25/2000APART
DetailsJoe Tawney
Jeff ###-#### Ok to occupy NW corner of building. 7/26/00 10:46:59 AM
FIRE-Final Inspection7/21/20007/24/20007/24/2000AFAIL
DetailsJoe Tawney
###-#### Reinsp. fail approved spklr. submittals not on site. 7/25/00 9:37:48 AM
FIRE-Final Inspection7/24/20007/24/20007/24/2000PFAIL
DetailsJoe Tawney
Jeff ###-#### after 3 Reinsp. not ready spklr. submittals not on site. 7/24/00 1:22:48 PM
FIRE-Final Inspection7/20/20007/21/20007/21/2000AFAIL
DetailsJoe Tawney
partial Jeff ###-#### sprinkler R/I fail C/N issued. 7/21/00 1:03:15 PM
BLD-Framing/Rough-in7/18/20007/19/20007/19/2000APART
DetailsCarl Dependahl
CEILING GRID--GREG HUNTER ###-#### kee C/N; plenum "smoke/flame", etc. Clg. ok if ok with htg. & elec. 7/20/00 2:00:25 PM
BLD-Framing/Rough-in7/7/20007/10/20007/10/2000APART
DetailsCarl Dependahl
Greg ###-#### Verify elec. ok @ ceiling- add. "Pods" C/N walls ok. 7/10/00 2:49:58 PM