FIRE-Final Inspection | 11/15/2000 | 11/16/2000 | 11/16/2000 | A | PASS |
Joe Tawney
|
|
|
###-#### Final OK for permanant occupancy or cert of completion 11/17/2000 7:58:43 AM
|
BLD-Final | 11/7/2000 | 11/8/2000 | 11/8/2000 | P | PASS |
Dave Hannah
|
|
|
FN OCC JEFF ###-####
|
BLD-Final | 11/6/2000 | 11/7/2000 | 11/7/2000 | A | NR |
Tom Arcoraci
|
|
|
###-#### jeff 11/7/2000 9:50:29 AM need sigs on card will recall 11/7/2000 9:56:51 AM
|
FIRE-Final Inspection | 8/22/2000 | 8/23/2000 | 8/23/2000 | A | NR |
Carl Dependahl
|
|
|
Jeff ###-####, for fire 8/22/2000 3:22:38 PM
|
FIRE-Final Inspection | 8/22/2000 | 8/23/2000 | 8/23/2000 | A | PART |
Joe Tawney
|
|
|
###-#### OK on rough in of relocation of spklr heads away from cable trays 8/23/2000 12:48:30 PM
|
BLD-Framing/Rough-in | 8/2/2000 | 8/3/2000 | 8/3/2000 | A | PART |
Carl Dependahl
|
|
|
fire structure draft stop Gregg ###-####draft stop ok; rec'd specs and details req'd 8/3/2000 12:11:01 PM
|
BLD-Framing/Rough-in | 8/1/2000 | 8/2/2000 | 8/2/2000 | A | PART |
Carl Dependahl
|
|
|
GREG ###-#### CEILING GRID INSP; south portion ok 8/2/2000 10:17:12 AM
|
FIRE-Final Inspection | 8/1/2000 | 8/2/2000 | 8/2/2000 | A | PART |
Joe Tawney
|
|
|
jeff ###-#### Ok on sprinkler in southwall area ok to cover 8/2/00 3:06:54 PM
|
BLD-Framing/Rough-in | 7/27/2000 | 7/28/2000 | 7/28/2000 | A | PART |
|
|
|
ceiling grid ###-#### jeff ok to drop n tiles in the two center bays all diffusers are connected properly waiting for mech signoff 7/28/2000 2:11:25 PM
|
BLD-Framing/Rough-in | 7/26/2000 | 7/27/2000 | 7/27/2000 | A | PART |
|
|
|
ceiling grid Greg ###-#### ok on the center bay for tile drop in with 406 blessing 7/27/2000 12:41:23 PM
|
FIRE-Final Inspection | 7/26/2000 | 7/27/2000 | 7/27/2000 | P | PART |
Joe Tawney
|
|
|
Jeff ###-#### Spklr. R/I 2 middle areas 2 column obstructions & install 2 heads. 7/28/00 10:04:33 AM
|
BLD-Final | 7/25/2000 | 7/26/2000 | 7/26/2000 | A | FAIL |
Carl Dependahl
|
|
|
###-####; ok to use NW corner of bldg; phased project. 7/26/2000 11:00:45 AM
|
BLD-Final | 7/25/2000 | 7/25/2000 | 7/25/2000 | P | FAIL |
Carl Dependahl
|
|
|
art-- ###-#### ck wall; ok to cover 7/25/2000 4:23:57 PM
|
FIRE-Final Inspection | 7/24/2000 | 7/25/2000 | 7/25/2000 | A | PART |
Joe Tawney
|
|
|
Jeff ###-#### Ok to occupy NW corner of building. 7/26/00 10:46:59 AM
|
FIRE-Final Inspection | 7/21/2000 | 7/24/2000 | 7/24/2000 | A | FAIL |
Joe Tawney
|
|
|
###-#### Reinsp. fail approved spklr. submittals not on site. 7/25/00 9:37:48 AM
|
FIRE-Final Inspection | 7/24/2000 | 7/24/2000 | 7/24/2000 | P | FAIL |
Joe Tawney
|
|
|
Jeff ###-#### after 3 Reinsp. not ready spklr. submittals not on site. 7/24/00 1:22:48 PM
|
FIRE-Final Inspection | 7/20/2000 | 7/21/2000 | 7/21/2000 | A | FAIL |
Joe Tawney
|
|
|
partial Jeff ###-#### sprinkler R/I fail C/N issued. 7/21/00 1:03:15 PM
|
BLD-Framing/Rough-in | 7/18/2000 | 7/19/2000 | 7/19/2000 | A | PART |
Carl Dependahl
|
|
|
CEILING GRID--GREG HUNTER ###-#### kee C/N; plenum "smoke/flame", etc. Clg. ok if ok with htg. & elec. 7/20/00 2:00:25 PM
|
BLD-Framing/Rough-in | 7/7/2000 | 7/10/2000 | 7/10/2000 | A | PART |
Carl Dependahl
|
|
|
Greg ###-#### Verify elec. ok @ ceiling- add. "Pods" C/N walls ok. 7/10/00 2:49:58 PM
|