Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD00-01531
StatusFinaled
Name SHACKELFORD RICHARD L &
Site Address 13965 W CHINDEN BLVD
Project NameASHLEY MANOR
Customer Number 
ePlanReviewNo
Description
ASHLEY MANOR CARE CENTERS INC. COOPERATE OFFICES. TO CONSTRUCT A 12,788 SQ. FT. THREE STORY, TYPE VN, FULLY FIRE SPRINKLERED BUILDING IN ACCORDANCE WITH THE APPROVED PLANS AND ATTACHMENTS. SQ. FIRST FLOOR 5088, SECOND FLOOR 4688, THIRD FLOOR 3012. NOTES: PROJECT APPROVED WITH ONE TENANT OCCUPYING ENTIRE BUILDING, FIRE SPRINKLERS USED FOR STORY INCREASE.
DRH99-00257, CAR99-0006, PC #400-00 MLO
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/3/20021/4/20021/4/2002APASS
DetailsJim Sly
###-#### OK for Perm Occ. 1/4/2002 3:47:39 PM
Permanent Occupancy 1/4/20021/4/2002 DONE
Details
BLD-Final11/16/200111/19/200111/19/2001APART
DetailsJim Sly
###-#### VAL OK for Temp Occ. 11/20/2001 4:15:41 PM
FIRE-Final Inspection11/16/200111/16/200111/16/2001APASS
DetailsTroy Cobbley
Added by Inspector: 430 On 11/16/2001 10:30:21 AM OK for perm occ
FIRE-Supply Line Hydro11/5/200111/6/200111/6/2001PFAIL
DetailsTroy Cobbley
3rd floor a/v's wrong candella, batteries in facp wrong, plans need resubmitted with additional detectors shown, provide map at facp, post sign on riser door, provide phone jacks, provide proper recall, provide address for remote station 11/7/2001 9:50:29 AM
BLD-Conference9/19/20019/20/20019/20/2001APART
DetailsJim Sly
TAYLOR ###-#### Handrails/landings 9/20/2001 9:06:54 AM
BLD-Framing/Rough-in7/31/20017/31/20017/31/2001PFAIL
DetailsJim Sly
###-#### C/N...3rd floor...Nail hangers, need all trade R/I appr incl. sprinkler, Nail Gyp at 1hr 7" OC, Maintain 1hr at ceiling or Architect to provide letter omitting Rated ceiling. 7/31/2001 1:57:20 PM
BLD-Framing/Rough-in6/29/20017/2/20017/2/2001APART
DetailsJim Sly
###-#### Val Taylor OK to cover 2nd floor. 7/2/2001 9:36:54 AM
BLD-Framing/Rough-in6/22/20016/25/20016/25/2001APART
DetailsJim Sly
val ###-#### Frame OK 1st floor only. 6/25/2001 10:42:48 AM
BLD-Framing/Rough-in6/4/20016/5/20016/5/2001AFAIL
DetailsJim Sly
Val Taylor ###-#### Need all trade finals. 6/5/2001 12:37:36 PM
BLD-Framing/Rough-in5/29/20015/30/20015/30/2001APART
DetailsJim Sly
nail pattern for siding ###-#### Shear nailing OK. 5/30/2001 8:50:50 AM
BLD-Conference5/8/20015/9/20015/9/2001APART
DetailsJim Sly
for conf-- val--###-#### -call 1st before insp Review of plans and work completed. 5/9/2001 11:56:31 AM
BLD-Foundation3/19/20013/19/20013/19/2001PPART
DetailsCarl Dependahl
stem wall insp - mike ###-#### , ok pending report 3/19/2001 3:28:35 PM
BLD-Footing3/16/20013/16/20013/16/2001PPART
DetailsJim Sly
pouring at 1:30 ###-#### Elevator and front column pads OK pending special insp and approval. 3/16/2001 3:38:30 PM
BLD-Footing3/13/20013/14/20013/14/2001PPART
DetailsRuss Owen
###-#### WILL POUR AT 1:30subject to s-i. 3/14/2001 4:10:12 PM
BLD-Footing3/12/20013/12/20013/12/2001PPART
DetailsJim Sly
###-#### Advised contr. his need of special insp for concrete (3500PSI) 3/12/2001 1:58:41 PM