BLD-Final | 3/15/2001 | 3/16/2001 | 3/16/2001 | A | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 03/15/2001 at 16:51:25. Contact: ###-####.
LC# 20317 issued 3/16/2001 10:12:01 AM
|
BLD-Final | 3/9/2001 | 3/9/2001 | 3/9/2001 | P | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 03/09/2001 at 11:00:52. Contact: ###-####.
need bond for landscape or finish per plan, no formal inspection made 3/12/2001 11:16:40 AM
|
BLD-Grading Inspection | 3/6/2001 | 3/6/2001 | 3/6/2001 | | BOND |
Rita DeYoung
|
|
|
Rough grading is complete. The driveway, fine grading and revegetation have not been completed. For these the engineer has recommended a $5,700 bond. Upon receipt of this the grading and drainage is conditionally approved.
|
BLD-Framing/Rough-in | 11/10/2000 | 11/13/2000 | 11/13/2000 | P | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 11/10/2000 at 08:54:40. Contact: ###-####.
recieved engineer letter, ok to rock 11/13/2000 12:43:36 PM
|
BLD-Other | 11/13/2000 | 11/13/2000 | 11/13/2000 | A | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 11/13/2000 at 07:28:21. Contact: ###-####.
shear ok,, all 11/13/2000 10:32:07 AM
|
BLD-Other | 11/8/2000 | 11/8/2000 | 11/8/2000 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 11/08/2000 at 08:02:00. Contact: ###-####.
waiting for engineer letter on framing, insulation ok 11/8/2000 2:09:58 PM
|
BLD-Energy code compliance | 10/26/2000 | 10/27/2000 | 10/27/2000 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 10/26/2000 at 10:02:22. Contact: ###-####.
c/n posted, ok to insulate 10/27/2000 12:06:58 PM
|
BLD-Foundation | 10/24/2000 | 10/25/2000 | 10/25/2000 | A | PASS |
Steven Webb
|
|
|
DARREN ###-####
|
BLD-Footing | 10/19/2000 | 10/20/2000 | 10/20/2000 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 10/19/2000 at 12:52:56. Contact: ###-####.
retaining wall ftg side of house 10/20/2000 12:01:19 PM
|
BLD-Framing/Rough-in | 10/17/2000 | 10/17/2000 | 10/17/2000 | P | PART |
Tony Young
|
|
|
###-#### Bob
exterior shear nailing ok, need to look at interior later. 10/17/2000 1:55:32 PM
|
BLD-Other | 10/16/2000 | 10/16/2000 | 10/16/2000 | P | FAIL |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/16/2000 at 10:00:15. Contact: ###-####. LAST CN NOT COMPLETED 10/16/2000 4:45:39 PM
|
BLD-Framing/Rough-in | 9/14/2000 | 9/15/2000 | 9/15/2000 | A | FAIL |
Tony Young
|
|
|
###-####
c/n posted ,, need eng. approval for hold downs 9/15/2000 11:18:50 AM
|
BLD-Foundation | 7/12/2000 | 7/12/2000 | 7/12/2000 | P | PART |
Tony Young
|
|
|
shawn ###-#### Appears ok work in progress 7/13/00 11:30:03 AM
|
BLD-Footing | 7/10/2000 | 7/11/2000 | 7/11/2000 | P | PART |
Tony Young
|
|
|
###-#### Ok w/verbal- work in progress 7/12/00 10:39:07 AM
|