BLD-Final | 10/26/2000 | 10/27/2000 | 10/27/2000 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/26/2000 at 11:09:31. Contact: ###-####. ok for final upon plm sign off. 10/27/2000 2:14:28 PM
|
FIRE-Final Inspection | 10/26/2000 | 10/26/2000 | 10/26/2000 | P | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 10/26/2000 at 11:07:42. Contact: ###-####.
|
BLD-Framing/Rough-in | 10/23/2000 | 10/23/2000 | 10/23/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/23/2000 at 10:21:00. Contact: ###-####. ceilling ok fire stpo at office side of elavador wall. 10/23/2000 2:35:04 PM
|
FIRE-Sprinkler Rough-in | 10/23/2000 | 10/23/2000 | 10/23/2000 | P | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 10/23/2000 at 10:23:27. Contact: ###-####. okay to cover 10/24/2000 8:01:00 AM
|
BLD-Framing/Rough-in | 10/6/2000 | 10/6/2000 | 10/6/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/06/2000 at 08:46:09. Contact: ###-####. Interior nonbearing walls in northeast corner ok for cover. Central core walls require opening/penetration protection before covering.
|
BLD-Framing/Rough-in | 8/14/2000 | 8/14/2000 | 8/14/2000 | P | PART |
|
|
|
phil ###-#### r/i 2nd flool okto install inside of te new 1-hour wa;l room side 8/14/2000 2:49:09 PM
|
BLD-Framing/Rough-in | 7/21/2000 | 7/24/2000 | 7/24/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 07/21/2000 at 13:22:54. Contact: ###-####. need to install door to space or build wall 7/24/2000 2:23:06 PMcalled the contr. Phill and let him know 7/24/2000 2:24:37 PM
|