BLD-Final | 5/22/2001 | 5/23/2001 | 5/23/2001 | A | PASS |
Jim Sly
|
|
|
Dave ###-#### OK for perm Occ. 5/23/2001 10:21:42 AM
|
Permanent Occupancy | | 5/23/2001 | 5/23/2001 | | DONE |
|
|
|
|
BLD-Final | 1/11/2001 | 1/12/2001 | 1/12/2001 | A | PART |
Jim Sly
|
|
|
Dave ###-#### OK for temp Occ. C/N...Obtain Perm occ status within 90 days of this notice. 1/12/2001 10:40:55 AM
|
BLD-Final | 1/8/2001 | 1/9/2001 | 1/9/2001 | A | FAIL |
Jim Sly
|
|
|
dave cell- ###-#### fn NR 1/9/2001 11:04:07 AM
|
FIRE-Final Inspection | 1/8/2001 | 1/9/2001 | 1/9/2001 | A | CANC |
Joe Tawney
|
|
|
fire fn -dave-- ###-#### cell Cancel Not ready 1/9/2001 12:48:53 PM
|
FIRE-Final Inspection | 1/9/2001 | 1/9/2001 | 1/9/2001 | P | PASS |
Joe Tawney
|
|
|
dave-- ###-#### fire fn Reinsp OK for permanant occupancy 1/10/2001 8:09:50 AM
|
BLD-Final | 12/29/2000 | 1/2/2001 | 1/2/2001 | P | FAIL |
Tom Arcoraci
|
|
|
###-#### not ready 1/2/2001 3:29:27 PM
|
BLD-Final | 1/3/2001 | 1/2/2001 | 1/2/2001 | P | FAIL |
Joe Tawney
|
|
|
Added by Inspector: 406 On 1/3/2001 8:31:54 AM Final Fail C/N iaaued
|
BLD-Final | 12/21/2000 | 12/22/2000 | 12/22/2000 | P | FAIL |
Jim Sly
|
|
|
###-####
|
BLD-Final | 12/21/2000 | 12/22/2000 | 12/22/2000 | P | FAIL |
Jim Sly
|
|
|
###-####
|
BLD-Final | 12/21/2000 | 12/22/2000 | 12/22/2000 | P | FAIL |
Jim Sly
|
|
|
|
BLD-Final | 12/21/2000 | 12/22/2000 | 12/22/2000 | P | FAIL |
Jim Sly
|
|
|
C/N issued. 5/8 rock bsmnt walls/ceilings for usable space 20 Min self cl doors rated access doors ( ceiling) All Req signatures......... 12/22/2000 4:46:41 PM
|
FIRE-Final Inspection | 12/21/2000 | 12/22/2000 | 12/22/2000 | A | FAIL |
Joe Tawney
|
|
|
###-#### Final Fail C/N issued 12/29/2000 2:11:39 PM
|
BLD-Conference | 12/21/2000 | 12/21/2000 | 12/21/2000 | P | PART |
Jim Sly
|
|
|
Dave ###-####3
|
BLD-Conference | 12/21/2000 | 12/21/2000 | 12/21/2000 | P | PART |
Jim Sly
|
|
|
Dave ###-####3
|
BLD-Energy code compliance | 9/26/2000 | 9/26/2000 | 9/26/2000 | P | PASS |
Jim Sly
|
|
|
Paul ###-#### Framing pass 9/26/2000 1:35:11 PM
|
BLD-Framing/Rough-in | 9/15/2000 | 9/15/2000 | 9/15/2000 | P | PASS |
Jim Sly
|
|
|
FR -RAMO-- ###-####
|
BLD-Conference | 9/5/2000 | 9/6/2000 | 9/6/2000 | A | PART |
Jim Sly
|
|
|
paul warring-- ###-#### for conf Discussed 1hr wall detail. 9/6/2000 11:34:56 AM
|
BLD-Framing/Rough-in | 8/30/2000 | 8/30/2000 | 8/30/2000 | P | FAIL |
Jim Sly
|
|
|
PAUL ###-#### FR C/N..Partial insp only...Architect to provide full detail for 1hr...Resubmit drawings to plan check dept. showing change to omit sprinklers and changes for "Usable space" in Bsmnt. 8/30/2000 1:01:11 PM
|
BLD-Conference | 8/22/2000 | 8/22/2000 | 8/22/2000 | P | PART |
Jim Sly
|
|
|
###-#### will be on site
|
BLD-Conference | 8/17/2000 | 8/17/2000 | 8/17/2000 | P | PART |
Jim Sly
|
|
|
Structure is firesprinkled the floor/ceiling doesn't require through or membrane protection only firestopping.
|