Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD00-01574
StatusFinaled
Name PAUL WARING
Site Address 6051 N EAGLE
Project NameEAGLE MEDICAL BLDG. #2
Customer Number 
ePlanReviewNo
Description
EAGLE MEDICAL CENTER BUILDING #2 * TO CONSTRUCT A SINGLE STORY, 3,116 SQ.FT. MEDICAL OFFICE BUILDING WITH A 1,340 SQ.FT. BASEMENT, NOTE: THIS BUILDING IS FULLY FIRE SPRINKLERED FOR BASEMENT SEPARATION. FIRE SPRINKLER PLANS AND PERMITTING SHALL BE REQUIRED BEFORE ANY UNDERGROUND OR OVERHEAD WORK. ALL CONSTRUCTION PER THE APPROVED PLANS, ATTACHED COMMENT LIST AND CABO/ANSI A117.1. THE FOOTING/FOUNDATION PERMIT (BLD00-00120) AND GRADING PERMIT (BLD00-00159) HAVE ALREADY BEEN ISSUED. DRH99-00197 PC#413-00 MJP
Permit modified 10/11/00 to reflect, removal of fire sprinklers and add one-hour construction in the basement area per UBC Section 712. MJP
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/22/20015/23/20015/23/2001APASS
DetailsJim Sly
Dave ###-#### OK for perm Occ. 5/23/2001 10:21:42 AM
Permanent Occupancy 5/23/20015/23/2001 DONE
Details
BLD-Final1/11/20011/12/20011/12/2001APART
DetailsJim Sly
Dave ###-#### OK for temp Occ. C/N...Obtain Perm occ status within 90 days of this notice. 1/12/2001 10:40:55 AM
BLD-Final1/8/20011/9/20011/9/2001AFAIL
DetailsJim Sly
dave cell- ###-#### fn NR 1/9/2001 11:04:07 AM
FIRE-Final Inspection1/8/20011/9/20011/9/2001ACANC
DetailsJoe Tawney
fire fn -dave-- ###-#### cell Cancel Not ready 1/9/2001 12:48:53 PM
FIRE-Final Inspection1/9/20011/9/20011/9/2001PPASS
DetailsJoe Tawney
dave-- ###-#### fire fn Reinsp OK for permanant occupancy 1/10/2001 8:09:50 AM
BLD-Final12/29/20001/2/20011/2/2001PFAIL
DetailsTom Arcoraci
###-#### not ready 1/2/2001 3:29:27 PM
BLD-Final1/3/20011/2/20011/2/2001PFAIL
DetailsJoe Tawney
Added by Inspector: 406 On 1/3/2001 8:31:54 AM Final Fail C/N iaaued
BLD-Final12/21/200012/22/200012/22/2000PFAIL
DetailsJim Sly
###-####
BLD-Final12/21/200012/22/200012/22/2000PFAIL
DetailsJim Sly
###-####
BLD-Final12/21/200012/22/200012/22/2000PFAIL
DetailsJim Sly
BLD-Final12/21/200012/22/200012/22/2000PFAIL
DetailsJim Sly
C/N issued. 5/8 rock bsmnt walls/ceilings for usable space 20 Min self cl doors rated access doors ( ceiling) All Req signatures......... 12/22/2000 4:46:41 PM
FIRE-Final Inspection12/21/200012/22/200012/22/2000AFAIL
DetailsJoe Tawney
###-#### Final Fail C/N issued 12/29/2000 2:11:39 PM
BLD-Conference12/21/200012/21/200012/21/2000PPART
DetailsJim Sly
Dave ###-####3
BLD-Conference12/21/200012/21/200012/21/2000PPART
DetailsJim Sly
Dave ###-####3
BLD-Energy code compliance9/26/20009/26/20009/26/2000PPASS
DetailsJim Sly
Paul ###-#### Framing pass 9/26/2000 1:35:11 PM
BLD-Framing/Rough-in9/15/20009/15/20009/15/2000PPASS
DetailsJim Sly
FR -RAMO-- ###-####
BLD-Conference9/5/20009/6/20009/6/2000APART
DetailsJim Sly
paul warring-- ###-#### for conf Discussed 1hr wall detail. 9/6/2000 11:34:56 AM
BLD-Framing/Rough-in8/30/20008/30/20008/30/2000PFAIL
DetailsJim Sly
PAUL ###-#### FR C/N..Partial insp only...Architect to provide full detail for 1hr...Resubmit drawings to plan check dept. showing change to omit sprinklers and changes for "Usable space" in Bsmnt. 8/30/2000 1:01:11 PM
BLD-Conference8/22/20008/22/20008/22/2000PPART
DetailsJim Sly
###-#### will be on site
BLD-Conference8/17/20008/17/20008/17/2000PPART
DetailsJim Sly
Structure is firesprinkled the floor/ceiling doesn't require through or membrane protection only firestopping.